HomeMy WebLinkAbout20060848 Ver 1_Staff Comments_20060718Staff Report
Project Num: 20060848 Version: 1
Name: City of Winston Salem: Bowen Blvd Realignment
County: Forsyth
Location: Brushy Fork Creek CPF basin Winston Salem
Latitude: +36°07'12"
SW Plan Location:
Owner: Temple, Alan
Contact Person: Temple, Alan
Inspection Date: 07/18/2006
Reason for Inspection: Routine
On-Site Representative(s):
Primary Inspector: Daryl Lamb
Secondary Inspector(s):
Question Areas:
Site Visit
Inspection Summary:
Title:
Entry Time:10:30 AM
Status: Received
Project Type: Road maintenance/repair/improvements
Region: Winston-Salem
Longitude: -80°12'32"
Phone:- 336-747-6844
Exit Time: 11:30 AM
Inspection Type: Staff Report
Phone: 919-771-5000
Nature of Impact Site: Urban, heavily developed with commercial and residential areas
Area: 8.31 acres
Impacts: Culverting of 334 linear feet of perennial stream, relocation of 155.5 linear feet of perennial stream, and filling of 0.12 acre of
wetlands for construction of a new road intersection.
Avoidance and Minimization: Questionable. Applicant is proposing to relocate 155.5 If of stream through a constructed channel
completely lined with rip rap. Stream function will be lost. WSRO recommends that this proposal be rejected. Applicant should design
the relocation channel utilizing natural stream channel design parameters.
Mitigation: Required. Applicant proposes to use the in lieu fee program (NGEEP) to mitigate for impacts to 489.5 If of streams and
0.12 acre of wetlands at a 1:1 ratio.
Buffer Impacts: None
Stormwater Management Plan: WSRO recommends requirement of a stormwater management plan for this project, particularly with
regard to the proposed relocated stream channel.
DWQ Authorization: Individual Certification
Corresponding 404 Permit: Individual Permit
Addendum: The plan for the relocated stream channel, utilizing natural stream channel design, was submitted to the Wetlands/401
Central Office by the City of Winston-Salem on 04/23/2007 and received in WSRO on 04/30/2007. Reviewed by WSRO on
05/16/2007. The submitted stream restoration design is acceptable.
Page: 1
Project Num: 20060848 Owner: Temple, Alan
Inspection Date: 07/18/2006 Inspection Type: Staff Report Reason for Visit: Routine
Site Visit Yes No NA NE
Do impacts described in the application differ those seen in the field? ~ ~ ~ Q
If yes. please describe differences:
Are the Intermittent/Perennial calls different in the application? ^ ~ ~ ~
If yes, please describe differences. and how mitigation ratios are affected:
Are there additional impacts not described in the application? ~ ~ Q ^
If yes, please describe and quantify:
Were the impacts in place prior to the application for the 401 Certification? ~ ~ ~ ~
Additional conditions recommended for the Certification: The City of Winston-Salem should be required to re-su
Recommended project modifications: The proposed relocation of 155.5 linear feet of an unnamed tributary to B
Is this a modification request to an existing Certification? ~ ~ ~ ^
Are there additional stromwater conditions that should be required due to the following classifications: ~ ~ Q ^
# 303(d)list, Class WS, NSW, ORW, HOW
Describe' The proposal for relocating 155.5 linear feet of an unnamed tributary to Brushy Fork Creek should inc
Is this a subdivision or otherwise part of a larger project? ^ ~ ~ ~
# If yes, what phase is this?
Are there prior impacts from prior phases? ~ ~ ^ Q
If yes, what are the cumulative imacts for this project?
Possible secondary impacts noted:
Comment:
Page: 2