Loading...
HomeMy WebLinkAbout20061654 Ver 4_CAMA Application_20130528A1VIKWA OLP LP 54 Y i W&D E R North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Governor May 22,2013 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: Braxton C. Davis Director Karen Higgins Division of Water Quality Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Town of Morehead City John E. Skvarla, III Secretary Lg �7 MAY ,?, 5 20113 � I Located on Radio Island, along Hwy 70, immediately north of the high rise bridge, in Morehead City (301 Hwy 70, Radio Island). Proposed Project: Proposes a Major Modification to Major Permit #214 -06 to add four no wake buoys within the vicinity of the existing pier. Please indicate below your agency's position or viewpoint on the proposed project and return this form by June 11, 2013 . If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808 -2808. Ext: 216. When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave., Morehead City, NC 28557 Phone: 252. 808 -28081 FAX: 252 - 247 -3330 Internet: www.nocoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Town of Morehead City (Newport River no wake buoys) 2. LOCATION OF PROJECT SITE: Located on Radio Island along Highway 70 immediately north of the Morehead City high rise bridge in Morehead City within the Newport River (301 Hwy 70, Radio Island). Photo Index - 2000: 41 -527 grids (Q -12, 13 &14) 2006:41-8035 grid (H- 12 &13) State Plane Coordinates -X: 2695152.719 Y: 361798.333 Rover: J011210A Longitude: 76'41'10.96353 Latitude: 3443'18.61245 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — previous visits in years past, 5/14/13 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received — 5/13/2013 Application Complete- 5/13/2013 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City dated 2007 Land Classification from LUP — Port Mixed Use /Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: (yes) (D) Intended Use: public (E) Wastewater Treatment: Existing — Municipal sewer Planned - None (F) Type of Structures: Existing — Pier, bulkhead, boardwalk, restrooms, parking lot, riprap, existing boatramp with piers and parking areas Planned — four no wake buoys (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water (four buoys) N/A N/A 1,520 ft2 Incorp. (includes arc of swing) (D) Total Area Disturbed: 1,520ft2 (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: This project is being proposed as a major modification to Major Permit 214 -06. The applicant proposes to add four no wake buoys within the vicinity of the existing pier previously authorized. Field Investigation Report: Town of Morehead City "No Wake" Buoys Page 02 9. Narrative Description The Town of Morehead City Newport River no wake buoy project is located on Radio Island along Highway 70 within the Newport River and north of the existing high rise bridge. The tract is bordered by a spoil island owned and used by the NC Ports Authority to the east and the DOT Bridge right -of -way to the south. The Town of Morehead property is 175,254 square feet in its entirety, has a shoreline length of 841' and is an average of 0' to 13' above NHW. Presently there is an existing pier, bulkhead, riprap, boardwalk, restroom, parking lot, public boat ramps with finger piers, discharge pipe and boat trailer parking area on this tract. Small fringes of coastal marsh are located north and south along the shoreline of the proposed work however will not be affected. They mostly consist of Spartina alterniflora. The undeveloped portion of the remaining high ground is comprised mostly of jurisdictional wetlands, cedars and scrub bushes. The Morehead City Land Use Plan classifies this property as Port Mixed Use, with all AEC's classified Conservation. This section of the Newport River is not designated as Primary Nursery Area and is closed to the taking of shellfish. The Newport River carries a water classification of SC. Riparian corridors were determined through the original permit # 214 -06 and shall pertain to the newest proposal and meet all required setbacks. Substrate in the Newport River is mostly sand and silt. No SAV's or shellfish beds were observed within the proposal project area. 10. Proiect Description: The existing major permit # 214 -06, which was issued on December 20, 2006, authorized the public fishing pier replacement, expansion and shoreline stabilization with riprap. A major modification was issued on May 5, 2009 for a pier extension and platform as well as a final modification to add a 15' x 148' extension and a 15' x 30't- platform. The "no wake buoys ", per the applicant, would be placed in accordance to coordinates provided by the NC Wildlife and would follow all required NC Wildlife guidelines. There was an amendment to 15A NCAC l O17.0330, Carteret County, to provide a no wake zone in the waters of Newport River, at the Newport River Beach Access Boat Ramp north of the US 70 Bridge and was approved on July 1, 2012. Once the buoys have been appropriately placed, the "no wake" area would be enforceable. The buoys would be marked with orange bands and red circles containing "No Wake" and "Slow". They would be 10 to 18 inches in diameter, 49 inches long, retain an I V arc of swing and would be held in place with a mushroom anchor and cabling. The buoys would be approximately 1,200' from the USACOE channel setback, would be a maximum of 580' below nhw /mhw and would be located at the following coordinates provided by NC Wildlife; • Buoy #1- 34.72150N 76.68895W • Buoy #2- 34.72255N 76.68903W Field Investigation Report Town of Morehead City "No Wake" buoys Page 3 of 3 • Buoy #3- 34.72376N 76.6891 • Buoy #4- 34.72734N 76.68771W 11. Anticipated Impacts: The proposed buoy placement would incorporate a total of 1,520ft2 of open Waters and would cause temporary turbidity during placement. There would be no hindrance to navigation due to the fact they would be located approximately 1,200' from the USACOE channel setback. The buoys would be placed a maximum distance of 580' below nhw /mhw and would meet 7H.0208(6) (g) (iii). Due to the recent designation by NC Wildlife as a "No Wake" area and safety concerns raised by the applicant, the buoy placement has the potential to improve public safety within this area. Name: Heather Styron Date: 5/22/13 Morehead City r < u a PROJECT NARRATIVE MODIFICATION OF CAMA MAJOR PERMIT 214 -06 NEWPORT RIVER BEACH ACCESS "NO WAKE ZONE" TOWN OF MOREHEAD CITY APRIL 22, 2013 The Town of Morehead City was issued CAMA PERMIT 214 -06 (Permit Class: MODIFICATION/MAJOR) on December 20, 2006. The permit authorized the installation of a boat launch facility complete with boat ramps, floating docks, abutments and parking lot located on the Newport River and accessed at 301 Hwy. 70, Radio Island. Proposed new construction includes placing four No Wake Buoys within two hundred (200) yards of the Newport River Beach Access Boat Launch as provided by amendment to 15A NCAC 10F.0330 Carteret Co., effective July 1, 2012 (copy attached). Said amendment calling for placement of buoys at coordinates provided by NC Wildlife Commission officers except the southernmost buoy which will be relocated north sufficient to avoid NCDOT'S riparian corridor and subsequent 15' setback. After securing the appropriate permit(s) work will be completed in one step. Work will occur at or near high tide. Length of the cable to the anchors and buoy will be based on field measurements at the predetermined coordinates. Future maintenance to buoys will occur at or near low tide providing access to all connections but the anchor. The 50 pound mushroom anchors will be jetted around their perimeter sufficient only to begin their settlement into the river bottom. The primary purpose of this request for CAMA permit modification is to install the necessary equipment to create an enforceable No Wake Zone at the newly constructed boat launch on Radio Island. This is merely a safety measure to minimize wave action within the ramp facility during boat launching and retrieval. Dredging is not proposed as part of the project. KNI- Cay WFUCAT1811fer Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant( Landowner Information Business Name Project Name (if applicable) Town Of Morehead City Newport River Beach Access No Wake Zone Applicant 1: First Name MI Last Name David MI McCabe Applicant 2: First Name MI Last Name NA Mailing Address If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 706 Arendell St. Phone No. 1 - Morehead City NC ZIP Country Phone No. FAX No. 28557 USA 252 - 726 -6849 ext. 120 252 - 726 - 2267 Street Address (d different from above) City State ZIP NA - Email mcpw @bizec.rr.com 2. Agent(Contractor Information Business Name Na A' QH]AI it Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext Phone No. 2 - - ext FAX No. Contractor # Street Address (d different from above) City State ZIP Email <Form continues on back> 252. 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalimanagement.not Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 301 Hwy 70, Radio Island d Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip NA Morehead City NC 28557- Phone No. Lot No.(s) (mf many, attach additional page with list) NA - - ext NA, I I , a In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Newport River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade ❑Unknown Newport River e Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft ) NA NA c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or NA, I , NWL (normal water level) (if many lot sizes, please attach additional page with a list) NA ❑NHW or ❑NWL e. Vegetation on tract NA f. Man -made features and uses now on tract jItECEmil r NA MAY 13 2013 g. Identify and describe the existing land uses ad*acent to the proposed project site. NA DCM-MHDWY h. How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? NA (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252 -808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net , Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (in) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. NA �ECEi�IE� o. Describe existing drinking water supply source. mg 3 7011 NA P. Describe existing storm water management or treatment systems. My NA 5. Activities and Impacts a Will the project be for commercial, public, or private use? ❑Commercial ®Public /Government ❑Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The project intends to install a no wake zone in the approaches to the Newport River Beach Access Boat Launch to minimize wave impacts on boat launching and retrieval c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Buoys will be placed in accordance with NC Wildlife provided coordinates by use of a jetted 50# mushroom anchor. Equipment will consist of one barge with excavator. Storage will be limited to the barge and will last a duration of one day d. List all development activities you propose. Install four no wake buoys e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 30 ®Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state. NA i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA J. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name NCDOT, Reed Smith, District Engineer Phone No. 252 514 4716 Address 209 S. Glenbumie Rd. New Bem, NC 28560 Name NC State Ports Authority Phone No. 252 - 726 -3158 Address 113 Arendell St., Morehead City, NC 28557 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Modification/Major 214-06 h. Signed consultant or agent authorization form, if applicable i. Wetland delineation, if necessary. j A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S.113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date 04/19/2013 Print Name David McCabe Signature ---__ Please indicate application attachments pertaining to your proposed project. =; % 013 ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and qulVfk� ❑DCM MP -3 Upland Development �. ®DCM MP-4 Structures Information �C4IC 252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY /MARINA CHARACTERISTICS ®This section not applicable ' a. (i) Is the docking facility /marina. b. (i) Will the facility be open to the general public? ❑Commercial ❑Public/Government ❑Private /Community ❑Yes []No c. (i) Dock(s) and /or pier(s) (ii) Number (iii) Length (iv) Width (v) Floating []Yes []No e. (i) Are Platforms included? []Yes []No If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed (ii) Number of slips existing I. Check the proposed type of siting: ❑ Land cut and access channel []open water, dredging for basin and /or channel []Open water; no dredging required []Other; please describe• k Typical boat length. m (i) Will the facility have tie pilings? ❑Yes []No (ii) If yes number of tie pilings? d. (i) Are Finger Piers included? []Yes ❑No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes []No f. (i) Are Boatlifts included? ❑Yes ❑No If yes (ii) Number (iii) Length (iv) Width h Check all the types of services to be provided. ❑ Full service, including travel lift and /or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips -) only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Describe the typical boats to be served (e g., open runabout, charter boats, sail boats, mixed types). 7a 'RECEWED MAY 13 2013 x�C ---MUD CITE' I. (i) Will the facility be open to the general public? []Yes []No 252-808.2808": 1- 8884RC ®AST :: www.nccoastaimanagement.net revised: 12/27/06 Form ®CM MP-4 (Structures, Page 2 of 4) EA . > 2. DOCKING FACIUMMARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed (ii) Give the location and number of " Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i, Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live- aboard dockage? k Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m Is the manna/docking facility proposed within a primary or secondary nursery area? ❑Yes []No 252 -808 -2808 :: 9- 888- 4RCOAST :: www.nccoastalmanagement.net revised: 92/27108 Form ®CM MP -4 (Structures, Page 3 of 4) n. Is the madna/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o Is the marina/docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑PubliclGovemment ❑Private /Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ID This section not applicable a Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ❑This section not applicable a. Is the structure(s)- b. Number 4 ❑Commercial OPublic/Govemment ❑Private / Communty c Distance to be placed beyond shoreline Ranges from 190' to d. Description of buoy (color, inscription, size, anchor, etc.) 284' Orange bands on White buoy with red circle containing the Note: This should be measured from marsh edge, if present. word "NO ". Also contains letter stating "SLOW & WAKE ". Buoy is 49" in height, 10" in diameter held in place with mushroom anchor and cabling. 14,r e. Arc of the swing 11' MAY 13 2013 7. GENERAL 252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastatmanacrement.net revised: 12127/08 Form ®CM MP-4 (Structures, Page 4 of 4) a. Proximtyy of structure(s) to adjacent riparian property lines 15' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 2320' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No []NA (i) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 220' d. Water depth at waterward end of structure at NLW or NWL -17' 8. OTHER [I This section not applicable a. Give complete description: 04/22/2013 Date Newport River Beach Access No Wake Zone Project Name Town of Morehead City ;Applicant Name David McCabe Applicant Signature 252- 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastalmanagement.net revised: 12127/O6 proposed NVVbuoy |noahono } �PmposedNVV2 Existing NVVZ Property Boundaries va 0 50 100 34.ruorow 34.72374 N 76.68911 W 76.68771 W 34.7225ow 76.68903 W 34.rm28w 76.68893 W m � `-. Or N ^ MOORING BUOY SWIVEL EYE 10• SUR -MARK MB -SM #46104 MARKER BUOY GALVANIZED SHACKLE FROM ROPE TO BUOY — e NYLON ROPE GALVANIZED SHACKLE SHACKLE & SWIVEL HEAVY CHAIN 4 DEPTH VARtIES MUSHROOM MOORING, JETTED INTO RIVER BOTTOM APPROXIMATELY 18"- 24" BUOY & MOORING DETAIL SCALE: I"= 50' �-- –11' --1 BUOY ARC ELEVATION SCALE: NOT TO SCALE BUOY 11 AT MHW BUOY AT MLW ECE NED IN — — 132013 BUOY ARC PLAN 4 MHD MY SCALE: NOT TO SCALE r ea. Nrs PREPARED BY* PRQIECT717LE PREPAREDFOR• DRAMNG7IRE. BMR9NC, P09N7' rwaJEcre 11202 CON=79Nq, 9NC NEWPORT RIVER TOWN OF MOREHEAD CITY BUOY & MOORING 910 Arende0 Street BUOY INSTALLATION 706 ARENDELL STREET DETAIL Morehead City, NC 2M7 MOREHEAD CfTY, NC MOREHEAD CITY, NC 28557 252 - 2474200 r ea. Nrs DATE 04175/13 REV. 04/3°"3 03 DRAM er JJW rwaJEcre 11202 DUPLIN PENDER �y - �}iiS.•hh Qe� LENOIR T-� CRAVEN JONES ONSLOW CARTERET COUNTY NTIC =AN AREA OF INTEREST F. 5•) ��OD ° o° -"um Dolpbins I o I.'SL A N• L° l+gttt /—,�C „-,�rc - +f3 trot 2'" eT°wn(/arsh ROGUE SOUND - ` � F�;` >: r `` • ' • � = ` � � 3 -- _ - •- PREPARED Br PRaIECTIMe PPEPAREDFM DR4IMNG7ME, CONSiIMNrr, M NEWPORT RIVER TOWN OF MOREHEAD CITY 910AmnMQmd 13UOYINSrAU.ATION 706ARENDELLSTREET VICINITY MAP MmtmWCftNC2W MORMEAD CITY, NC MOREHEAD CITY, NC 28557 M- 247.4M � NT.$ VAWA are W OVM3 01 PROELTR 112 O2 MAY 13 202 DOWNTOWN NEWPORT RIVER r" nDC1VIN8tCYC1 MOREHEAD CITY �o . _; . g BUOY , I NSTALLATION - - _ i.. •.- *-;j'• 'L-r..�„ �� . .� - Ada----- _ _ '. . LOCATION �y ,. • � u�S' r•Ir� _ ` e in � . �•` ~`�� _ (One ' ' 3 _ \ ` ��OD ° o° -"um Dolpbins I o I.'SL A N• L° l+gttt /—,�C „-,�rc - +f3 trot 2'" eT°wn(/arsh ROGUE SOUND - ` � F�;` >: r `` • ' • � = ` � � 3 -- _ - •- PREPARED Br PRaIECTIMe PPEPAREDFM DR4IMNG7ME, CONSiIMNrr, M NEWPORT RIVER TOWN OF MOREHEAD CITY 910AmnMQmd 13UOYINSrAU.ATION 706ARENDELLSTREET VICINITY MAP MmtmWCftNC2W MORMEAD CITY, NC MOREHEAD CITY, NC 28557 M- 247.4M � NT.$ VAWA are W OVM3 01 PROELTR 112 O2 HIGHWAY 70 - - _ i.. •.- *-;j'• 'L-r..�„ �� . .� - Ada----- _ _ '. . .. � �y ,. • � u�S' r•Ir� _ ` e in � . �•` ~`�� _ (One ' ' 3 _ \ ` `•. t •�' _ • i _ • ' •( -- • •, ➢ HIM t:li:r \ t • 6�� t r I�% r P PSI A �•' t eeacm! -� a °d � �'•_�� _" ri-- - RADIO r AA °..e � t_', "'q rERWq, - _ u •WN tier ta\ltiili` / Dolpbins I o I.'SL A N• L° l+gttt /—,�C „-,�rc - +f3 trot 2'" eT°wn(/arsh ROGUE SOUND - ` � F�;` >: r `` • ' • � = ` � � 3 -- _ - •- PREPARED Br PRaIECTIMe PPEPAREDFM DR4IMNG7ME, CONSiIMNrr, M NEWPORT RIVER TOWN OF MOREHEAD CITY 910AmnMQmd 13UOYINSrAU.ATION 706ARENDELLSTREET VICINITY MAP MmtmWCftNC2W MORMEAD CITY, NC MOREHEAD CITY, NC 28557 M- 247.4M � NT.$ VAWA are W OVM3 01 PROELTR 112 O2 � NT.$ VAWA are W OVM3 01 PROELTR 112 O2 I I I I I I I I I I I I I i I I I I I I I I I I I I USACE CHANNEL I I LINE I I I I N/F I I N.C. STATE PORTS I I AUTHORITY I I I I I I I I I I I I _J - I I I I I I I I N/F I I N.C. STATE PORTS I I AUTHORITY I I I � I I I I I _ BUOY � BUOY I I NEWPORT RIVER 34.72376N 34.72734N I I 76.68911W 76.68771W 75' AEC LINE I 1 SETBACK ^A' —_ I I BUOY I I 34.72255N / EXISTING TOWN OF II II \ 76.68903W / / / MOREHEAD BOAT RAMP -22.0a rj I I USACE CHANNEL I I I 1 / \ l -20.0' -18.0' -16AY .14.Y - 12.m_1o.0`' ►� SETBACK )l 1 / l 1 /� \ l / / // I I I 1 �� �� til 1 1 \II ✓ / l EXISTING PIER \Ill -8.° a -2. i I i ► I !� / V\ / ,\ 1� 1 I BUOY,) ? L1 I I 111 I� 34.72150N I I NCDOT RIGHT -OF -WAY 76.68895W \� I I -- - -I --I -- -7 NORMAL LOW I I WATER 1 �+1GHWAY 70 OVERHEAD RAILROAD TRUSSEL POWERLINES \4 RAILROAD DRAW ( BRIDGE I I I I I I o I I I I rn I I —n I 0 I -+ I Z r I 910 ARENDELL STREET MOREHEAD CITY, NC 28557 PHONE. (252) 2474200 FAX (252) 247 -7300 www.beannspt com CLIENT TOWN OF MOREHEAD CITY 706 ARENDELL STREET MOREHEAD CITY, NC 28557 PROJECT NEWPORT RIVER BUOY INSTALLATION MOREHEAD CITY, NORTH CAROLINA MAY 13 2013 Dcm-mmCefY DRAMNG nRE PROPOSED SITE PLAN N/F STATE OF NORTH CAROLINA N/F N.C. STATE PORTS AUTHORITY EXISTING RIP -RAP _ r NORMAL HIGH — WATER N/F RADIO ISLAND YACHT & BOATING CLUB NOTES: 1. SEE BUOY DETAIL SHEET 03 2. ELEVATIONS SHOWN RELATIVE TO NLW. PRELIMINARY DRAWING NOT FOR CONSTRUCTION N 200' 0' 200' � . 1' =200` DATE 04/15113 opAmw JJW 02 APPROVEDOr PROJECT# 13015