Loading...
HomeMy WebLinkAbout20130574 Ver 1_401 Application_201305130 ot WA L 29 a o e 20130574 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification (PCN) Form i A. Applicant Information 1. Processing -- 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes No Id. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Reliable Tank lines Commercial Retail Development 2b. County: Ashe 2c. Nearest municipality / town: West Jefferson 2d. Subdivision name: NA 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Reliable Tank Line, LLC 3b. Deed Book and Page No. 437/280 3c. Responsible Party (for LLC if applicable): N/A rul U MA� � 0 � n4n U1 3d. Street address: 1540 Silas Creek Parkway - I I 3e. City, state, zip: Winston — Salem, NC 27127 - WATFA UALI 3f. Telephone no.: 336- 722 -3411 3g. Fax no.: 336- 721 -9520 3h. Email address: ERhymer(&gocnc.com Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Derek Goddard 5b. Business name (if applicable): Blue Ridge Environmental Consultants, P.A. 5c. Street address: 1305 S. Collegiate Drive 5d. City, state, zip: Wilkesboro, NC 28697 5e. Telephone no.: 336- 844 -4088 5f. Fax no.: N/A 5g. Email address: derek @brec.biz Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 19227 -137 1 b. Site coordinates (in decimal degrees): Latitude: 36.382801 Longitude: - 81.486827 (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 1.18 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Beaver Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C: TR 2c. River basin: New 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Vacant Commercial Lot, Urban setting 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 135 Perennial 3d. Explain the purpose of the proposed project: To Establish required parking and commercial driveway access from US 194 (Approved by NCDOT) 3e. Describe the overall project in detail, including the type of equipment to be used: The project will install 60' of 48' CMP. The Pipe will be installed in the dry and buried 12° The project will utilize a track loader. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary Final of determination was made. 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Unknown Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): X Wetlands Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary W1 P T ❑ Yes Corps No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland Impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 X P [IT Culvert UT to Beaver Creek X PER ❑ INT X Corps DWQ 3 60 S2 P [IT PER ❑ INT Corps DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary Impacts 60 31. Comments: f' Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PC] T 0. Total open water Impacts 4g. Comments: S. Pond or Lake Construction If Pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? NA ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? B1 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h. Total buffer Impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. This impact is the only practical alternative to have a safe access to the site from NC 194. Erosion control will be adhered to for sensitive watersheds. Crescent lane the existing road is being closed by the NCDOT. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Stringent erosion control standards for sensitive water sheds will be adhered too. Erosion control will be adhered to for sensitive watersheds. The pipe will be buried 12° to allow for aquatic passage. A pump around will take place in order to install the pipe in the dry. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank Payment to in -lieu fee program ❑ P 9 ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool []cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 4 PCN Form —Version 1.3 December 10, 2008 Version ! 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWO 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑Yes No ❑ Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 51 % 2b. Does this project require a Stormwater Management Plan? X Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See Attached Plans- Underground Stormwater System ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program X DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase 11 3b. Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWO Stormwater Program Review ❑ Coastal counties ❑ HOW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form —Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) 1 a. Does the project involve an expenditure of public (federal /state/local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Welland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWO Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWO Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act Yes ❑ No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? http: /Avww.ncnhp.org - http:// www .saw.usace.army.mil/WETLAND /esa - http : //www.fws.gov /nc- es /es /es.htmi 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? F[IYes ® No 1 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http: // ocean. floddamarine .org /efh_coralfimsMewer.htm 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? http: //www.hpo.ncdcr.gov S. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA - designated 100 -year floodplain? -T- ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: No rise to the flood way will occur. 8c. What source(s) did you use to make the floodplain determination? http: / /www.nafloodmaps.com Derek Goddard 3/26/13 Applicant/Agent's Printed Name Ap li t/Agent's Signature Date (Agent's signature is valid only If an authorization letter from the applicant Is provided.) Page 10 of 10 AGENT AUTHORIZATION FORM Property Legal Description PIN: 19227 -137 Street Address: Crescent Lane — West Jefferson, NC Property Owner: Reliable Tank Line, LLC The undersigned, registered property owners of the above noted property, do hereby authorize Derek Goddard , of BREC, PA (Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and all standard and special conditions attached. Property Owner's Address (If different than property above): PO Box 2736 Winston Salem, NC 27102 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. �� Authorized Signature Date: U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 2013 -00652 County: Ashe USGS Quad: NC- Jefferson GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Reliable Tank Line, LLC / Ernie Rhymer Address: 1540 Silas Creek Parkway Winston - Salem, North Carolina 27127 Telephone No.: 336 -722 -3411 Size and location of property (water body, road name/number, town, etc.): The proiect is located on Cresent Drive, PIN 19227 -137, West Jefferson, Ashe County, North Carolina. (36.382801 N, - 81.486827 W) Description of projects area and activity: The Permittee is authorized to impact 60 linear feet of an unnamed tributary to Beaver Creek. Impacts are associated with the installation of a culvert for commercial development. The'site is being developed for Reliable Tank Lines. This supersedes the original verification issued on December 3, 2010, action ID 2010-01808. If plans change and /or the type of commercial development for this parcel changes, this permit may no longer be valid. Anv proposed changes should be coordinated with our office. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide permit Number: 39 Summary of Authorized Imoacts and Reauired Mitigation Impact ID # NWP / GP # Open Water ac Wetland ac Stream Temporary Permanent Temporary Permanent Temporary Permanent Culvert 39 60 Impact Totals Total Loss of Waters of the U.S. ac Total Loss of Waters of the U.S. 60 Required Wetland Mitigation (ac) Required Stream Mitigation (If) Additional Remarks and/or Special Permit Conditions: All comments /conditions of the attached North Carolina Wildlife Resources Commission letter dated April 10, 2013 are hereby incorporated as special conditions of this permit. Culverts greater than 48 inches in diameter will be buried at least one foot below the bed of the stream. Culverts 48 inches or less shall be buried at an appropriate depth to maintain aquatic passage as defined in Final Regional Condition 3.6 attached to this NWP. The permittee will plant a riparian buffer 25 -feet in width on each side of the remaining channel. All plantings should be completed within 30 days of the permitted impacts occurring unless otherwise coordinated with our office. Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your plans submitted on March 29, 2013. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 807 -6300) to determine Section 401 requirements. You may also visit their website at: hW:1Jportal. ncdenr .ora /web /wg /swp /ws /webscape For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Tasha McCormick at 828 - 271 -7980. Corps Regulatory Official Tasha McCormick Date: May 14, 2013 Expiration Date of Verification: March 18.2017 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at bft://per2.mM.usace.army.mil/survey.html to complete the survey online. Determination of Jurisdiction: A. ❑ Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ® There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID Basis of Jurisdictional Determination: There are stream channels located on the property that exhibit indicators of ordinary high water marks. The stream channel on the property is an unnamed tributary to Beaver Creek into the New River. The New River is located in the Kanawha Watershed and ultimately drains to the Gulf of Mexico. Specifically, the New River is formed by the joining of the North Fork and South Fork of the New River. The New River drains to the Gauley River and then to the Kanawha River. The Kanawha River drains to the Ohio River then to Mississippi River before entering the Gulf of Mexico. This jurisdictional determination is valid for the impact areas only. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. Appeals Information: (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room IOM15 Atlanta, Georgia 30303 -8801 Phone: (404) 562 -5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address within 60 days from the Issue Date below. * *It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. ** . Corps Regulatory Official: Issue Dale: May 14, 2013 Expiration Date: Five years from Issue Date Copy Furnished: Derek Goddard, Blue Ridge Environmental Consultants, P.A. 1305 S. Collegiate Drive, Wilkesboro, NC 28697 Permit Number: 2013 -00652 Permit Type: NW39 Name of County: Ashe Name of Permittee: Reliable Tank Line, LLC / Ernie Rhymer Date of Issuance: May 14, 2013 Project Manager: Tasha McCormick Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW RG -A 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date _R N Applicant: Reliable Tank Line, LLC Ernie Rh rmer File Number: 201- 3-00652 Date: May 14, 2013 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) PERMIT DENIAL C X APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E ID) pg? 01 g� A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sip the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section H of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary ID is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. PON =-.- REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION- The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you ma rovide additional information to clarify the location of information that is ahead X in the administrative record. If you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you may process you may contact: also contact: Tasha McCormick, Project Manager Mr. Jason Steele, Administrative Appeal Review Officer USACE, Asheville Regulatory Field Office CESAD-PDO 151 Patton Ave U.S. Army Corps of Engineers, South Atlantic Division RM 208 60 Forsyth Street Room 10M15 Asheville, NC 28901 Atlanta, Georgia 30303-8801 828-271-7980 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to p artici pate in all site investigations. Date: Telephone number: Signature of aTpellant or agent. I For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Tasba McCormick, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303- 8801. Phone: (404) 562-5137 ® North. Carolina Wildlife Resources Commission Gordon Myers, Executive Director April 10, 2013 Mrs. Tasha McCormick U.S. Army Corps of Engineers, Regulatory Branch 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 SUBJECT: Nationwide Permit for Reliable Tank Line, LLC Culvert, UT Beaver Creek, Ashe County Dear Mrs. McCormick: Mr. E. Rymer with Reliable Tank Line, LLC requested a permit to put 60 feet of culvert in a tributary to Beaver Creek in Ashe County. Comments from the WRC on this application are offered for your consideration under provisions of the Clean Water Act of 1977 (33 U.S.C. 466 et seq.) and the Fish and Wildlife Coordination Act (48 Stab 401, as amended; 16 U .C. 661- 667d). The stream at the site is probably ue to the extensive development and uncontrolled stormwater in the or this reason, we suspect that it does not support trout as do some better quality Crib ies to Beaver Creek to the west. Although the stream itself does not support trout, Beaver Creek su orts wild brown trout. This project will require a considerable amount of stream disturbance and lik y cause downstream siltation. Therefore, the culvert work should not occur from October 15 to April 5 to avoid impacts on brown trout spawning. We hav6 no other major concerns with this project provided it complies with the Regional Conditions and effective sedkment and erosion controls are used during construction to minimize downstream siltation. Thank you for the opportunity to review and comment on this regulatory action. Please contact me at (828) 452 -0422 extension 24 if you have any questions about these comments. Mailing Address: Division of Inland Fisheries - 1721 Mail Service Center - Raleigh, NC 27699 -1721 • Telephone: (919) 707 -0220 - Fax: (919) 707 -0028 , . . Reliable Tanktine, LLC Page 2 April 10, 2013 Ashe Sincerely, Dave McHenry, Mountain Region Coordinator, Habitat Conservation Program ec: Mr. Derek Goddard, Blue Ridge Environmental Consultants Mr. Kevin Hining and Mr. Kin Hodges, NCWRC 36'2a 0" 36° 22' 55" Soil Map —Ashe County, North Carolina Map Scale: 1:1,060 if printed on A size (8.5"x 11 ") sheet m m � N N Meters N 0 10 20 40 60 ;o Feet 0 50 100 200 300 USDA Natural Resources MW Conservation Service Web Soil Survey National Cooperative Soil Survey 3/7/2013 Page 1 of 3 36° 23'0" 36° 22'55" MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Map Units Special Point Features �•� Blowout ® Borrow Pit X Clay Spot Closed Depression }{ Gravel Pit Gravelly Spot Landfill >t Lava Flow 4L& Marsh or swamp R Mine or Quarry © Miscellaneous Water © Perennial Water V Rock Outcrop + Saline Spot Sandy Spot Severely Eroded Spot Q Sinkhole y Slide or Slip Fd Sodic Spot Spoil Area (� Stony Spot Soil Map —Ashe County, North Carolina Very Stony Spot Wet Spot i Other Special Line Features Gully Short Steep Slope Other Political Features 0 Cities Water Features Streams and Canals Transportation 4-F+ Rails Interstate Highways US Routes Major Roads ^, Local Roads MAP INFORMATION Map Scale: 1:1,060 if printed on A size (8.5" x 11 ") sheet. The soil surveys that comprise your AOI were mapped at 1:24,000 Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http : / /websoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 This product is generated from the USDA -NRCS certified data as of the version date(s) listed below. Soil Survey Area: Ashe County, North Carolina Survey Area Data: Version 10, Jun 15, 2012 Date(s) aerial images were photographed: 7/18/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 3/7/2013 '� Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map Ashe County, North Carolina Map Unit Legend Ashe County, North Carolina (NC009) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BuC Braddock -Urban land complex, 2 to 15 percent slopes 3.6 91.4% CfE Clifton loam, 15 to 25 percent slopes 0.3 8.6% Totals for Area of Interest 3.9 100.0% Natural Resources Web Soil Survey 3/7/2013 Conservation Service National Cooperative Soil Survey Page 3 of 3 2E '2 '2 '2I 295 OOC METERS '26 Yl f�07g, ' • � ��yy,,/.4 / /H ^� -� •.� !J `� \.•L' �-r: 1 I 1(� O tiny_' ='" {i � �'. / ✓ , .�/ \.��� —.\ V� - , .. .1-- _ � �L '• � �`) � •\ \`. /;/ `' .4 _r�. �1 ,I •y ea:. • L \.� \ \ • \D, !. :'°° � `� 1 ) -- , � • /r�' \ `� `'�! � `( _ � _.��I `��' x/ � l ��� �"i `\ , l ?. i j , , c-\l� Nit `\ ` �`;/-� n '� �`I�11 '\ \ / I��ri•I. 25 1 �, (/ \.1 � (/�`71 �IU !I- l r �I "Pack ' i1 ' o \ � �. I , ! � • � - r �` f fair 39°j _. � f -�.•. /!' ?1 �i .� `.� .f _ - ��== � li_ J4gp ✓./ -./ -�� \.._�": �✓, ° �. :.z \ /-1 ••3a \„ i.A 4' �i�" 1 -' ,n \ N _ S�f -,'. J � � yr, tl \� � � � \1 \, /�._- ��\ ��> / _ � ••� / 0�i, / _ r p sE \ �, I J'r�� ;0,� - \� ��r •� 1.4, I , ,a'' ry'�� ==`/� -_ -�\ ,j _ -�\ � ��� ^--_- s_, ±,.�� ' �'�2�a \\tJ• �` 11 `w. �� / %r: _\ ti j . / - ?I`, ^\ Lam. - .,t, ..\ =, `%" p"\ 1a_�oo 0 1 1 { it \," ;/ *t j \• •.\ \ - * `�a\ - -� I, 1 al_.��_. �I'r .� _\, ��`'\� \ '�j;�i-� i�1 It ; � 'p ! _ ' DI qo b • ° s� �r � � 1 �/. -�, 1. ��..51� / l •,r� � ({ l� I��(p� (�. ;, J )� �f��{ ('. % ���'"�� ; �. -._ter �j,�\Vi^�� 3 , f� V•� %"'.r � \ �. 1 � 1. I , =� � � 'g� \} u =' �,` a 2. a _ Mi3 •. p,,, \ \.: I G ;•. �- ._i - - - ava\ _' `, .� � �i \ �1 �_ _ � � , �^ \ �� -} � -. _yl 1, \ � �j��,�Z_..� l /�\�; l ti/ \� .\,i . `.i-1�,4 l ,l ,y i•I ;i\�� ^ ! <,' S , 1 )II�1� ± ��� _)l 7 l� \$_ �! `r, , / %' i (/ ( 1� � (' •\l`` t���1')i -., i tl'` ` I\ c 1 • �_ �� � t; l ! '�� ' 1 J q. g,� �--� A % ^l C -��� 'S,, O .\ f {� • � + p .;� 1 �; j `: �,<.1 ,�' \ � -� ' / S�/ (� I ((.\ .�i �\-. ��_ `' � J�� -� f• l\ `' ',� z ` \' ;% ` t v ,� • i:• � ;i (f r! I` ``n Iq \\ %, ,, (, �•I\ ; 1.1 \ \\" E %� �� �\�. � I 1� .�-\1 :� `� � � , /-�J �)- — -cam 'Jeoo -_ J, /���., 7�__�`� `:;• "/ - f \�:�J, .,'� `\f ..,\ I \'�� `7 �;� \\\ _ � _ 9 �i �pACr y�`Ii •d1. . •c� e a�, // ;S S ( �� � i �(jr�� -" 1 I � ,� p __ i ' ,) � � I \ r ( ,�`-� T I j �•f f g; \�`_(� �III� ! J7 � � i r <Coo ^_ tr, �\ �� ! ��\ \ \..; y�/ \ � f 3� l' � --_ ° ^_xa{ 'L/ \ vlf \ / r /- •) '%,^:e �• _Z � � =.` .1 ,..�� /i / •ul � 1 � � ��11� (�% ' �ii � // � / =.� Bx ,,`a', :�� �:1�`� / - / �-a #1� -, L J ' h- _ ; \i;�,��� I \� � p� \'f - � \ \ � �f ! "/ ){ // �. �� J � ' ` '� `, �.-- -i WO _ _ , A- --,. =. l _,� -, j % C�...1\\� /� =—\\ ' ~�� 'zJJSi 2 1 11 h { • \�� \ �\ \. � � I •i $. ..' if p . L `.�� it •� A - ) i ! _ _ -1 -"tea J= , r i �. ' ( _ _':f , ',. �� / JJ,'s') t� f,° ---. (/ � '26 _\ a j'1i� `4':0.. _ ,�� (� � ;� / � , / \ � �' �R `�' 1J W ` ~ °+ � / i _ i W t' (_ '\ \,. \. ii ' • �• ~' _•. r. � �Z i I 1 `I —�, � J (" �`, �`:. -\ \ \,\ \ , /L 1H 11 \ ( ( � i � �\ ` ' � � � \�./ � � � r JJ / �i / /r� - .\• '(\'/ �aD°� _ -}} \_ � �\ ` °\ •. ��//44 \��"\`_".� i�, r Ala ..' \_ \+ 0 :�-7�\ � � ��� _ U�y`` • -` A l- ;, • '�- '� II6� 1 � 1 �J ` d. J /l`" f� :� Ac /' , %�� , \ \` ;�� __�_ �'� -`. i �. � �'��� \: �Jl�, (�' ��` �\��• � ��,� � x�. � �•� ��- �'�� � T�.tli .l ^l \� � ', 7� • .n� � � f .� �_I 1. E it j I F \ ii r / •�(`'y�s(� t \� �� .i , /.-��- `�` / � `-- \ /II I r` �i ; Tom\ a -� _ a �.J ,^\ �-- � ' ..Q"'_,- '` v( �f`."z _ t1,\ ( 1 \`.�3 r1 �-' Q�? .J I . ` �t /�' ..1,I 'J ayr °i 1 hd ax'fr�= �� ,1 '' „\ �� )� ,� ��,1�ir�;_,• j '; ��` - ��' -' f rte; �` t� \\ S ;'1� t• U „;'I r ly ? `y I -L 3? •..� \ `� � 77 1 ° l�r'fL t�` \\ 1 � r°'��`_•� `� _ \ �� ����� �\ J � a n � °c.al� I' rJ1 ���i � �� r � \ \ \' tv�\ I /•'jr! �� /%3���^ \� -1�a '27 �_ I r • •� •� •I RELIABLE I - L .DEVELOPMENT • / . > �_ _ /�� -� �' �, •�j � �' �; r\ I •p �/. �w$` � \` ,1 � ". / ^,` ,( � �' ��I� .fl_� r� Q ,I` �J���`...JJ, �`,� s � \� ✓>r � `•����' >• i 1 , >� .\ (� '-\�� �: �,.7 �� r.�_:\ P� -1' 1'I -'1� -� \:\�.A . *� \X ` J �� �\ _ , j l / � t/ ? I r�_` \11 .�/ I• T / ( \ — : ' 1 ) //����j i� ✓ J (• (���, /�J/ - `� � y,••��./ � � ; 11�..\. II \�� ° \J 11 ���L> �1�� `�•C i `�� \,,� !�(/ \. , },i� DA • \ \} / 7. �4 \� o . -�� I' �• �� _ l I I o /�/ 1l,v ~�j/ /ri/ I 1 ��ha '^"�._ � � °a\•.� ���_._.^ �'` �3 H4 ���85 ��� \�- �J__�-1 n1._ �� /� .�` � {�\ i_1 l r�� \ i / i�� J ` \\ �� '/ \��, ti./i., as \ a �•J i ;_ �� , _f [ 7 J • rY° ti 163 • \ �> ( iy1J , /� 4 .� \_1�' mss\ s n �l ) --�' / I• ,..� i i. 1'\ "xJSO �_ J - - x JO .A �, `- _ � ��J \ d<< i C i \ Beaye'r�rea • -- `-�° ,v y 'ps • . `\ '' ,4 � �/ ,w $�` � J � �... �. 1 11 ASS � i- 3(�' f� !C ' -� it � ` �� F ° jl � � — � l".�Z ��..' f \ - � �����il � !•-, .F_:.:' p \l'�? \/- �/'I It J F'\� A �(� <\ ^)i l '-. .A a\ \ \ I( �� o \ 1` �• ` � I \ /7�, \J l � /} ( \.i -_ r� �/ 3000 GNe // �• I- &ear- _ _ ' / f i. J -' 1 ,✓; :�p \ 36 °22'30'- 81 °30' 156 '57 Produced by the United States Geological Survey Topography compiled 1964_ Planimetry derived from imagery taken 1998 and other sources. Survey control current as of 1968 North American Datum of 1983 (NAD 83). Projection and 1 000 -meter grid: Universal Transverse Mercator, zone 17 2 500 -meter ticks: North Carolina Coordinate System of 1983 North American Datum of 1927 (NAD 27) is shown by dashed comer ticks. The values of the shift between NAD 83 and 7 NAD 27 for .5- minute intersections are obtainable from National Geodetic Survey NADCON software There - ay be private inholdings within the boundaries of the National or State reservations shown on this map Landmark buildings verified 1968 SCALE 1:24 000 D IOLOMETERS 1 _ 7 MN' 1000 0 METERS 1000 1000 . GN�Q 11.5 0 I MILES s SS' 0-16, 1000 0 1000 2000 300 4000 5000 6000 7000 8700 ®00 10000 8 MILS 5 MILS FEET CONTOUR INTERVAL 40 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 UTM GRID AND 1999 MAGNETIC NORTH TO CONVERT FROM FEET TO METERS. MULTIPLY BY 0.3048 DECLINATION AT CENTER OF SHEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS ~� TOTMI 1COVERF0 FIRER FOR SALE BY U.S. GEOLOGICAL SURVEY, P.O. BOX 25286, DENVER, COLORADO 80225 A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS IS AVAILABLE ON REQUEST NC ,9 QUADRANGLE LOCATION 1 Perk 1 2 3 4 Grmry Creek J Mou,h of wits.. 4 W°rremvll1. 4 5 5 L.—]Spring. 6 Todd 7 Glendale Spings 6 7 8 a Horse Gap ADJOINING 7.5' QUADRANGLE NAMES '54 [n ILL- o � o Q LL- U cc - O N S 'N \''65 166— 36.22'30' 81 °2'30' BnERpR- GCdLOGIGAI OUflVFV, RFBTON, yIflGIMA -1808 ROAD CLASSIFICATION Primary highway Light -duty road, hard or hard surface ........ improved surface ...... Secondary highway hard surface........ Unimproved rr,ad ...... Interstate Route U.S. Route JEFFERSON, NC 1998 NIMA 4756 IV NW- SERIES V842 State Route Cr I u �N a .0 ii�0• n O �C3 o �.o —CD z —OO N v RE11A91E DEVEL0PI�NT BLUE WDGE ENVDiGN1MNTAL CGNSU�TANTS, PA SH cM DATE REI gwm eMEBMG I RAM@M I QNRM60ffAL '' g PIPW NCBMS rMWEEMF WW STORMWATER PLAN J REIlA9lE TAW lNE LLC 33 WX E6A9 CREFl( C 27127 wuisTOxsu NC 27127 "+cif "aGi; WLKMB=?CEfMTEOavE 3l.IMAOEA . ANC c1'�".��• xu�seao.xcmW RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION O&Z=3 DO NOT SCALE - PLANS MUST BE RECEIVED AS A COMPLETE SET MIA O ale fi i IM P� c$ �4 xF i gppt6da a fill all �I�•I � ��� � —; ��_ ���:I a� a }� ■ , }af � ��!•� �gd� }•, � '� > ff ;� —�a q�I� t• �; a g ;I a ddb is �L =� �_-'�„ ``�•. ;171 �4 C�l� F J 9� �� ��If di �� �� �r }■ E;T ip E �r f.. 1 "Y)7 Y +' I" ,i i w, ao7' f�� QEa 9tliC 3 L6�i SYt gym° �oNr Ot =„m) �i•� i= 1 yq mN■wm■ INSTALLED EtII t1I A � _ �E a l nan■awneeNeC,ew— „>z;r Nw = k>MrMa° �`19 ■orfrwNwr ,mrW�yl �g� �b E , eN• ■. gTNaFD ,q taP.N.P.� �, r•,Ner.m r, v� Lr+r� � C3C3 E ��� x Noov■,o■■m a,anNr, � ,`, � � F� �� � i`; ••�°yYi°m 61pN� vrorpa�i � vr.yr •.�aESPlm+181°2ralMn°l P(Lf r,1pN■MIfJp,SQNr18,°l MgYE .°"wwJ=4•."�."�° _ � � �� � ?ONap NO,�WANIGN°■°°fO COGRNO°,IfTCNINa1Wn' I 9 �� I ■ ! i"��.'ii '■�"w$.��nin� "•��aA Oi��i±w E��� ; �� � ! �� � � �� if�� If a. lea' €!�3 g F p�� I, is !L e I , ClB4O, NVENl IOU,OR°�M �FIOfJIGrtMMfF1ONE110I �� � �� �� � � dE�� ,ew.oam.aw■f�sau+N, nwvmo.°n E pgpgpp! !T LMNIf]IIIOG,gIp NCNIW fMLM.■11taiAypNLIppMNP[®. cp Q s IOR'NL0■EN=4ON1f Nal°■L 9 Stl { ff i� NusooTeuwrxevEaFrargNS lei StDmfl�Eff an a„ uwN,s. w Y ge• 711 tt � s 3 p 9 '� 9 C lays i ( Q o MC -4500 STORMWATER CHAMBER SPECIFICATIONS I CNNATER98NALL BE aTO=W=ECN IICa7000RAFFROVF.O EgY1L f v n . � TIMT NDIAD aama � � �,,,� Fpl ■��„aa THE e, R, C,�.�1OF THE �E�. THE e,lax,��,7.�T� tlL9TAtlAT10N REOU■,ElR7=IB 6NML ENatRE THAT THE lOMO FACTORS SPECIFIED N THE AASMro IRFDBADOB Ca81611 sF¢aFrwnoNa. BECTgN,2fIARE IfET FOR 17 LaNOa,auT,oN oE■o LOADS AND A aenRTUganoN LIVE tao.A eil9ED ON THE MSMO DESIGN TRUCK WITH CONSIDERATION FOR aPACTgND MaTPIi VEHICLE PRESENCES. a CHAMBEIM arwlcruw oFSae, OF TNERwFUSr,c CORRUGATED wNt BTORNwAiFA COLLECTION CwumCas' BIIML sueNrt p 9ETa10/ THE Foua■nloro 7111! EIgR6fiERFORaFP11WAt BEFORE oEwm■IOalweEaB ro 711E aRGIECTaRE ABIR11CTlMLEVALLNl10N BYAREOL4TERFD B7Rl=CnB1AL ENGINEER THAT �,NI,T »� LOAD FACTORS BFEC6 ®M,iBi °IABN7O,� 8180GE DESIGN eFecvrw7loNa SECTION ,a.IaARE feT a STRUCTURAL CROW BECiN110ETAa ON WHICH THE 811AlCnL1ALQ=OBB SECTION 6 BABFD. S. naeataunoNasauNaExaewueewa�u=wm�ndwualF „cn>raxauTesr BfSTALLA,ION 8187RUCIIONa. @t ttog IIU97DCNA1@ER 6PEdiYw7,ON9 ni sN Or apA B _ iR °euan ■,w o ® m m f v n 6{ � ip9 @t ttog Or apA B �� iR t F alb ile RE1Y8lE OEVELOPIF=!T BLUE RIDGE ENVRONIkNTAL CONSULT •' OATS REVISSION& ANTS, P ptH �O �' ". ENGU®iNG I RANNI40 I EIMRONI@=TAL PREPARED FOP ITS Nce¢sENae�ERemFBwaaTUe ap r DETAILS 3$ ,s18snASa�=PARAwAr WINSTONSALMNCZMV ,c �o.NC�re'wuE IroW u.'ww Nc'cM? o 2FI FAAFn FnR A(;FNrY RFVIFW . NnT RFI FARM MP MNATP1ICTm GZAM3 M NnT ARAI F . PI ANA MI I.ST RF PFf:FIVFn 1 . • ' �> Zell oil, 91 a P i� goal r. t M N M Of HIM 1 �� ( mill ;Mo a o e fill 0 410 , arr rSN r � E Iv= m T1 11 DIP m > 09 .. I X °t _ can g m Ain m a" C" I cf) wa RELIABLE DEVELOPMENT BWE RIDGE ENVIRONMENTAL CONSULTANTS, PA 3 ENGINEERING I PLAIUIPIO I ENVIRONMENTAL f� PREPARED FOR NRELIASIE TANSLNE LLC NCBELS ENGINEERING FIRM r.,W 1510 SOAS CREEK PARKWAY WNSTONSUEY,NCRKWA fig} IMSSWNMCOLEWTEDRNE 3XAAA= WII�A� W. IC 7m97 I�ri¢Ch RELEASED FOR AGENCY REVIEW - NOT RELEASED FOR CONSTRUCTION DETAILS