Loading...
HomeMy WebLinkAbout20120359 Ver 1_Buffer inspection_20130530Wetland Inspection Report SW Plan Location: Longitude:Latitude: NCDOT- Bridge No. 231 on SR 1005 Location: Issued Status:1 Version: Replace bridge with bridge Project Type:NCDOT- Bridge No. 231 on SR 1005 Project Name: NC DOT Division 7 Site Owner Name: Project Num:20120359 County:Guilford Winston-Salem Region: Inspection Date:05/29/2013 Reason for Inspection: Inspection Type:Site Inspection (DOT) Routine Phone:Inspection Contact Person:Title: On-Site Representative(s): Facility compliance Status:Compliant Not Compliant Amy C Euliss Primary Inspector: Secondary Inspector(s): Phone: Buffer/Authorization/Variance Conditions Program Area:Buffer/Authorization/Variance Question Areas: Inspection Summary: Yes No NA NE Buffer/Authorization/Variance Conditions Does the impact(s) match what was approved in the buffer authorization or variance? Is the site compliant with other conditions of the buffer authorization or variance? Comment: Note: Driveway pipe that was replaced under a non-reporting NW3 is slightly perched. Requested they install a small rock ladder at outlet 1 Page: