HomeMy WebLinkAbout20110971 Ver 2_05292013-Buf inspection_20130530Wetland Inspection Report
-80°08'35''+35°55'48''
SW Plan Location:
Longitude:Latitude:
NCDOT- Bridge No. 77 on US 29/US 70/I-85 (B-4760)Location:
Issued Status:2 Version:
Replace bridge with bridge Project Type:NCDOT- Bridge No. 77 on US 29/US 70/I-85 (B-4760)Project Name:
NC DOT PDEA Site Owner Name:
Project Num:20110971
County:Guilford Winston-Salem Region:
Inspection Date:05/29/2013
Reason for Inspection:
Inspection Type:Site Inspection (DOT)
Routine
Phone:Inspection Contact Person:Title:
On-Site Representative(s):
Facility compliance Status:Compliant Not Compliant
Amy C Euliss Primary Inspector:
Secondary Inspector(s):
Phone:
Buffer/Authorization/Variance Conditions
Program Area:Buffer/Authorization/Variance
Question Areas:
Inspection Summary:
Yes No NA NE Buffer/Authorization/Variance Conditions
Does the impact(s) match what was approved in the buffer authorization or variance?
Is the site compliant with other conditions of the buffer authorization or variance?
Comment: Note that additional work in sewer easement for sewer line relocation is
exempt.
1 Page: