Loading...
HomeMy WebLinkAbout20110971 Ver 2_05292013-Buf inspection_20130530Wetland Inspection Report -80°08'35''+35°55'48'' SW Plan Location: Longitude:Latitude: NCDOT- Bridge No. 77 on US 29/US 70/I-85 (B-4760)Location: Issued Status:2 Version: Replace bridge with bridge Project Type:NCDOT- Bridge No. 77 on US 29/US 70/I-85 (B-4760)Project Name: NC DOT PDEA Site Owner Name: Project Num:20110971 County:Guilford Winston-Salem Region: Inspection Date:05/29/2013 Reason for Inspection: Inspection Type:Site Inspection (DOT) Routine Phone:Inspection Contact Person:Title: On-Site Representative(s): Facility compliance Status:Compliant Not Compliant Amy C Euliss Primary Inspector: Secondary Inspector(s): Phone: Buffer/Authorization/Variance Conditions Program Area:Buffer/Authorization/Variance Question Areas: Inspection Summary: Yes No NA NE Buffer/Authorization/Variance Conditions Does the impact(s) match what was approved in the buffer authorization or variance? Is the site compliant with other conditions of the buffer authorization or variance? Comment: Note that additional work in sewer easement for sewer line relocation is exempt. 1 Page: