HomeMy WebLinkAbout20211104 Ver 1_Meeting Request Review_20210709 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnrrtl Qua fay
ID#* 20211104 Version* 1
Regional Office* Asheville Regional Office-(828)296-4500
Reviewer List* Kevin Mitchell
Pre-Filing Meeting Request submitted 7/9/2021
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Patrick J. Breedlove
Contact Email Address* pjbreedlove@ncdot.gov
Project Name* Jackson County-Bridge 144
Project Owner* NCDOT Division 14
Project County* Jackson
Owner Address: Street Address
253 Webster Road
Address Line 2
City State/Rovince/Region
Sylva North Carolina
Fbstal/Zip Code Country
28779 United States
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
• Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below and include location information.*
Bridge replacement with a concrete box culvert on Thomas Valley Road
(SR 1397)over Nations Creek(Class C).
Please attach the documentation you would like to have the meeting about.
Jackson County-B144- Full Plan Set.pdf 10.01 MB
pdI only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
` rztc (-30
Submittal Date 7/9/2021
Reviewer Meeting Request Decision
........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Is a meeting required or is there more info needed?*
r Yes r No
If rmre inforrration is needed,please add comrents for the errail notification below.