HomeMy WebLinkAbout20211105 Ver 1_Meeting Request Review Doc Attachment_20210709CANEY FORK CREEK
CANEY FORK CREEK
CANEY FORK CREEK
VICINITY MAP
LOCATION
PROJECTHooperCemeteryRd.MosesCreekJohnsCreek Rd.
.62East Laport
dR
H HFMoses
Creek
Church
Stephenson
Cemetery
Hooper
Cemetery
Z
Hooper
Knob
Shelton Mountain
Alum
3719summit
T
V
=
=
=
=MPH
ADT
ADT
% *
FUNC CLASS =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
4
TO END
TO SR 1737
JACKSON COUNTY
ON SR 1738 (HOOPER CEMETERY ROAD)
GRADING, DRAINAGE, PAVING, AND STRUCTURE
20 10 20 40
20 10 20 40
4 2 4 8
2017 70
2037 96
6
15
RURAL LOCAL
SUBREGIONAL TIER
NC GRID
NAD 83 NA 2011
LENGTH ROADWAY PROJECT 17BP.14.R.145 = 0.031 MI
LENGTH STRUCTURE PROJECT 17BP.14.R.145 = 0.014 MI
SR 1738 (HOOPER CEMETERY RD.)NC GRI
DNAD
8
3 NA
2
0
11
-L- STA 12+16.67
END BRIDGE
-L- POT STA. 10+50.00
BEGIN PROJECT 17BP.14.R.145
-L- POT STA. 12+90.00
END PROJECT 17BP.14.R.145
TOTAL LENGTH OF PROJECT 17BP.14.R.145 = 0.045 MI
-L-
-L- STA 11+43.95
BEGIN BRIDGE
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/9917BP.14.R.145DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
2/16/2018S:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_TSH.dgnUser:jddavesCONTRACT:PROJECT:17BP.14.R.145ARTMEN
N ASO
H
DEPT
O
F TRA S PORTTIONTATEOFNRTCAR
O
LI
NADN00464See Sheet 1A For Index of Sheets
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
17BP.14.R.145 N/A PE
17BP.14.R.145 N/A R/W
17BP.14.R.145 N/A CONST.
BRIDGE NO. 490203 OVER CANEY FORK CREEK
SIGNATURE:
2018 STANDARD SPECIFICATIONS
Prepared in the Office of:
VAUGHN & MELTON
ASHEVILLE NC, 28806
1318-F PATTON AVE.
FOR THE NORTH CAROLINA DIVISION OF HIGHWAYS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
ALEX FITZPATRICK
JOSH DEYTON, PE
NCDOT CONTACT:
DIVISION 14 BRIDGE PROJECT MANAGER
REECE M. SCHULER, PE, PLS NORH C
ROLI
N
APROFESSIONAL
ENGINEER
T A
RUONDIR .S YEL
DARB033023
S E A L
AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
REE
CE M. SCHULER26960
JULY 25, 2017
OCTOBER 8, 2024
1735
1735
1736
1738
1737
1737
1740
ENGINEER
SHEET NO.PROJECT REFERENCE NO.2/13/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh01a.dgnUser:jddavesROADWAY DESIGN
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDAIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
REE
CE M. SCHULER26960
17BP.14.R.145 1A
ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT.
RIGHT-OF-WAY MARKERS:
UTILITY OWNERS ON THIS PROJECT ARE Duke Energy
UTILITIES:
APPROACHING A BRIDGE.
SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION
THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, AND CROSS-
END BENTS:
MAKE HIS OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS.
NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. THE CONTRACTOR SHOULD
SUBSURFACE PLANS:
WORK" IN ACCORDANCE WITH SECTION 104-7.
SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC WILL BE PAID FOR AS "EXTRA
TEMPORARY SHORING:
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
GUARDRAIL:
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.02
ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SHOULDER CONSTRUCTION:
SECTIONS.
SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL
STD. NO. 225.05 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS.
ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH
SUPERELEVATION:
METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
CLEARING:
PROPER TIE-IN.
PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A
ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE
ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT
SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
GRADING AND SURFACING OR RESURFACING AND WIDENING:
REVISED:
EFFECTIVE: 01-16-2018
GENERAL NOTES: 2018 SPECIFICATIONS
876.02 Guide for Rip Rap at Pipe Outlets
862.03 Structure Anchor Units
862.02 Guardrail Installation
862.01 Guardrail Placement
846.04 Drop Inlet Installation in Shoulder Berm Gutter
846.01 Concrete Curb, Gutter and Curb & Gutter
840.66 Drainage Structure Steps
840.35 Traffic Bearing Grated Drop Inlet - for Cast Iron Double Frame and Grates
840.29 Frames and Narrow Slot Flat Grates
840.25 Anchorage for Frames - Brick or Concrete or Precast
840.00 Concrete Base Pad for Drainage Structures
DIVISION 8 - INCIDENTALS
560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
422.02 Bridge Approach Fills - Type II Modiefied Approach Fill
DIVISION 4 - MAJOR STRUCTURES
300.01 Method of Pipe Installation
DIVISION 3 - PIPE CULVERTS
225.04 Method of Obtaining Superelevation - Two Lane Pavement
225.02 Guide for Grading Subgrade - Secondary and Local
200.02 Method of Clearing - Method II
DIVISION 2 - EARTHWORK
STD.NO. TITLE
project and by reference hereby are considered a part of these plans:
N. C. Department of Transportation - Raleigh, N. C., Dated January, 2018 are applicable to this
The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design Branch -
2018 ROADWAY ENGLISH STANDARD DRAWINGS
REV.
EFF. 01-16-2018
S-1 THRU S-24 STRUCTURE PLANS
X-1 THRU X-4 CROSS-SECTIONS
X-1A CROSS-SECTION SUMMARY
UO-1 THRU UO-2 UTILITY PLANS
EC-1 THRU EC-5 EROSION CONTROL PLANS
RF-1 THRU RF-3 REFORESTATION PLANS
SIG-1 SIGNAL PLAN
PMP-1 PAVEMENT MARKING PLAN
TMP-1 THRU TMP-5 TRAFFIC CONTROL PLANS
4 PLAN & PROFILE SHEET
3P-1 PARCEL INDEX SHEET
3D-1 DRAINAGE SUMMARIES
3B-1 ROADWAY SUMMARIES
2A-1 PAVEMENT SCHEDULE AND TYPICAL SECTIONS
1C-1 SURVEY CONTROL SHEET
1B CONVENTIONAL SYMBOLS
LIST OF STANDARD DRAWINGS
1A INDEX OF SHEETS, GENERAL NOTES, AND
1 TITLE SHEET
SHEET NUMBER SHEET
INDEX OF SHEETS
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
C
F
Existing Easement Line
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;zvW
K
Proposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}Tp
Q
l
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I
]
GAS:
Gas Valve
Gas Meter n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G Water
Above Ground Gas Line
A/G Gas
Above Ground Water Line
Above Ground Sanitary Sewer A/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
?
CONC
CONC WW
vvDrainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
W
W
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
*S.U.E. = Subsurface Utility Engineering
WLB
EIP BECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
SHEET NO.PROJECT REFERENCE NO.
1B17BP.14.R.145
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
TUE
DUE
AUE
CRProposed Curb Ramp
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
C
A
HPBExisting Historic Property Boundary
U/G Power Line LOS B (S.U.E.*)
U/G Power Line LOS C (S.U.E.*)
U/G Power Line LOS D (S.U.E.*)
P
U/G Telephone Cable LOS B (S.U.E.*)
U/G Telephone Cable LOS C (S.U.E.*)
U/G Telephone Cable LOS D (S.U.E.*)
T
U/G Telephone Conduit LOS B (S.U.E.*)
U/G Telephone Conduit LOS C (S.U.E.*)
U/G Telephone Conduit LOS D (S.U.E.*)
TC
U/G Fiber Optics Cable LOS B (S.U.E.*)
U/G Fiber Optics Cable LOS C (S.U.E.*)
U/G Fiber Optics Cable LOS D (S.U.E.*)
T FO
U/G Water Line LOS B (S.U.E*)
U/G Water Line LOS C (S.U.E*)
U/G Water Line LOS D (S.U.E*)
W
U/G TV Cable LOS B (S.U.E.*)
U/G TV Cable LOS C (S.U.E.*)
U/G TV Cable LOS D (S.U.E.*)
TV
U/G Fiber Optic Cable LOS B (S.U.E.*)
U/G Fiber Optic Cable LOS C (S.U.E.*)
U/G Fiber Optic Cable LOS D (S.U.E.*)
TV FO
U/G Gas Line LOS B (S.U.E.*)
U/G Gas Line LOS C (S.U.E.*)
U/G Gas Line LOS D (S.U.E.*)
G
SS Forced Main Line LOS B (S.U.E.*)
SS Forced Main Line LOS C (S.U.E.*)
SS Forced Main Line LOS D (S.U.E.*)
FSS
Utility Unknown U/G Line LOS B (S.U.E.*)
U/G Test Hole LOS A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contaminated Site: Known or Potential
Known Contamination Area: Soil
Potential Contamination Area: Soil
Known Contamination Area: Water
Potential Contamination Area: Water
Primary Horiz Control Point
Primary Horiz and Vert Control Point
Secondary Horiz and Vert Control Point
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap
Vertical Benchmark
New Right of Way Line
Concrete or Granite R/W Marker
New Right of Way Line with
Concrete C/A Marker
New Control of Access Line with
New Control of Access
New Temporary Construction Easement
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement12/2/2016Computed Property Corner
RIGHT OF WAY & PROJECT CONTROL:
New Right of Way Line with Pin and Cap
CANEY FORK CREEK
CAT-1
GRAU 350 TL-2
GRAU 350 TL-2AT-1
SHEET NO.
Location and Surveys
NC GRI
DNAD
8
3 NA
2
0
1112/06/07PROJECT REFERENCE NO.2/12/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh1c.dgnUser:jddaves1C-117BP.14.R.145
****************************************
10" SPIKE IN BASE OF 24" SYCAMORE
S 4935’32.75" W Dist 90.35
BL STATION 5+00.00
N 591541 E 765827
BM1 ELEVATION = 2165.74
****************************************
****************************************
10" SPIKE IN ROOT OF A 15" PINE
BL STATION 7+34.00 17 LEFT
N 591804 E 765806
BM2 ELEVATION = 2171.57
****************************************
490203_LS_CONTROL.TXT
BY THE NCDOT LOCATION AND SURVEYS UNIT.
PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTING
PROJECT CONTROL DATA AT:
THE FILES TO BE FOUND ARE AS FOLLOWS:
SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT. IF FURTHER
HTTPS://CONNECT.NCDOT.GOV/RESOURCES/LOCATION/
INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT
CONTROL INFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
NOTES:
ALIGN STATION OFFSET NORTH EAST
L 10+40.00 9.00 591562.34871 765868.84991
L 10+40.00 30.00 591552.09832 765887.17829
L 10+77.29 30.00 591584.64799 765905.38211
L 11+41.01 30.00 591679.06204 765893.30674
L 12+12.21 30.00 591730.46190 765844.02714
L 12+63.54 30.00 591749.48988 765839.14141
L 13+05.00 9.00 591793.69096 765831.11038
L 13+05.00 30.00 591786.48498 765850.83534
L 10+40.00 -30.00 591581.38514 765834.81148
L 10+77.29 -30.00 591613.93480 765853.01531
L 11+41.01 -30.00 591637.53832 765849.99646
L 12+12.21 -30.00 591688.93267 765800.72213
L 12+63.54 -30.00 591765.03362 765781.18978
L 13+05.00 -30.00 591807.07350 765794.47832
L 13+05.00 -9.00 591799.86752 765814.20328
L 10+40.00 -9.00 591571.13475 765853.13987
DATUM DESCRIPTION
THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BY
NCDOT FOR MONUMENT "GPS 100"
WITH NAD 83/NA 2011 STATE PLANE GRID COORDINATES OF
NORTHING: 591599.7790(ft) EASTING: 765895.4520(ft)
ELEVATION: 2169.80(ft)
THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT
(GROUND TO GRID) IS: 0.9997739843
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED HORIZONTAL GROUND DISTANCE FROM
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES
VERTICAL DATUM USED IS NAVD 88
BEARING S 3821’57" W DISTANCE 86.92’
"GPS 100" TO -L- STATION 10+00.00
ALIGN STATION OFFSET NORTH EAST
L 12+00.00 -70.00 591652.43873 765780.29660
L 12+00.00 -30.00 591680.12122 765809.17012
L 11+60.00 -30.00 591651.24770 765836.85260
L 11+60.00 -70.00 591623.56521 765807.97908
-FINAL-
SURVEY CONTROL SHEET
FINAL row marker iron pin and cap -e
FINAL row marker easement - e
pde
FINAL -L-
TYPE STATION NORTH EAST
POT 10+00.00 591531.8305 765841.4703
PC 10+77.29 591599.2914 765879.1987
PT 11+41.01 591658.3002 765871.6516
PC 12+12.23 591709.7142 765822.3584
PCC 12+63.54 591757.2618 765810.1656
PT 13+20.84 591811.5676 765828.3437
EQB 14+14.76 591898.6484 765863.5266
EQA 10+00.00 591898.6484 765863.5266
GPS-101
ELEV=2,165.74’
BM-1
ELEV=2,171.57’
BM-2
ELEV.=2,168.48’
E=766,063.2870
N=591,982.1540
LOCALIZED PROJECT COORDINATES
NCDOT BASELINE MONUMENT (GPS-101)
ELEV.=2,167.19’
E=765,795.2580
N=591,745.8460
LOCALIZED PROJECT COORDINATES
NCDOT BASELINE MONUMENT (BL-1)ELEV.=2,167.47’
E=765,898.6354
N=591,948.5931
LOCALIZED PROJECT COORDINATES
NCDOT GPS MONUMENT (BL-2)
-L- POT STA. 10+50.00
BEGIN PROJECT 17BP.14.R.145
-L- POT STA. 12+90.00
END PROJECT 17BP.14.R.145
86
.92
’
S
38 21’57" W
GPS-100
3 BL-3 592099.9809 765989.8900 2167.81 16+70.63 9.13 RT
2 BL-2 591948.5931 765898.6354 2167.47 14+93.14 10.67 RT
1 BL-1 591745.8460 765795.2580 2167.19 12+66.24 11.32 LT
G100 GPS-100 591599.7790 765895.4520 2169.80 10+82.92 14.74 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION EL STATION OFFSET
BL
ELEV.=2,169.80’
E=765,895.4520
N=591,599.7790
LOCALIZED PROJECT COORDINATES
NCDOT BASELINE MONUMENT (GPS-100)
ELEV.=2,167.81’
E=765,989.8900
N=592,099.9809
LOCALIZED PROJECT COORDINATES
NCDOT BASELINE MONUMENT (BL-3)
SHEET NO.PROJECT REFERENCE NO.
ROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8/17/992/16/2018S:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_typ.dgnUser:jddavesPAVEMENT SCHEDULE
EARTH MATERIALT
C1
NOTE: ALL PAVEMENT SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.
PAVEMENT DESIGN
IN EACH OF TWO LAYERS.
TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE,
CL
1"
1’-0"1’-0"
C1
C
ASPHALT OVERLAY
3" CONSTANT DEPTH GRADE POINT
L RDWY &
27’-0" OUT TO OUT
24’-10"1" TAPER1" TAPER
C1
4’-5"2’-5"9’-0"9’-0"
17BP.14.R.145
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
11’-5"13’-5"
0.02 0.02
DRAWING NOT TO SCALE
J1 PROP. 8" AGGREGATE BASE COURSE
CL
GRADE
POINTC1
GRADE TO THIS LINE
0.08
VARIES
C1
T
GRADE TO THIS LINE
0.08
T **9’-0"9’-0"
-L-
0.02 FT/FT0.02 FT/FT
* 7’-0" WITH GUARDRAIL
8’-0"
J1 J1
11"
6"6"
2’-0"2’-0"
4
:1
2:1 EXIST. GROUND
2:1EXIST. GROUND2:1EXIST. GROUND
EXIST. GROUND
2:1
4:1 TYPICAL SECTION NO. 1
-L- STA. 11+43.95 (BEGIN BRIDGE) TO -L- STA. 12+16.67 (END BRIDGE)
-L-
TYPICAL SECTION NO. 2
2A-1
TYPICAL SECTION NO. 2
TYPICAL SECTION NO. 1 AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
REE
CE M. SCHULER26960 AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
REE
CE M. SCHULER26960
OFFSET BLOCK
POST
2:1
TO FACE OF GUARDRAIL POST
1" OFFSET FROM BACK OF CURB
C1
6"
R
T
MIN.
2’-4"
INSET A
INSET A
3’-0"
J1
J1
SEE INSET A
END BRIDGE TO -L- STA. 12+78.51 RT
-L- STA. 12+16.67 (END BRIDGE) TO -L- STA. 12+90.00
-L- STA. 10+50.00 TO -L- STA. 11+43.95 (BEGIN BRIDGE)
R SHOULDER BERM GUTTER
IN CUBIC YARDS
WASTEBORROWUNDERCUTLOCATIONEMBT+%EXCAVATION
UNCLASSIFIED
GUARDRAIL SUMMARY
"N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAIL.
TOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT.
FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL.
W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL.
LENGTH
SHOP
CURVED
DOUBLE
FACED
WARRANT POINT
APPROACH
END
TRAILING
END
DIST.
FROM
E.O.L.
TOTAL
SHOUL.
WIDTH
FLARE LENGTH
APPROACH TRAILING APPROACH TRAILING
END END END END
W ANCHORS
REMARKS
"N"
SURVEY
LINE BEG. STA.END STA.LOCATION
XI
MOD
XI6/21/00AT-1
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
TYPE 350
ATTENUATOR
IMPACT
GUARDRAIL
FACED
SINGLE
GUARDRAIL
EXISTING
REMOVE
GUARDRAIL
EXISTING
STOCKPILE
AND
REMOVE
EA G NG
G = GATING IMPACT ATTENUATOR TYPE 350
NG = NON-GATING IMPACT ATTENUATOR TYPE 350
COMPUTED BY:
CHECKED BY:DATE:
DATE:SHEET NO.PROJECT REFERENCE NO.2/16/2018S:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh03_sum.dgnUser:jddavesSUBTOTAL
PROJECT TOTALS:
ADDITIONAL GUARDRAIL POSTS=5 EA.
III
TYPE
TL-3 TL-2 CURVED
SHOP
TYPE III
will be paid for at the contract lump sum price for "grading".
excavation, fine grading, and clearing and grubbing
Approximate quantities only. Unclassified excavation, borrow
STRAIGHT
LESS DEDUCTIONS FOR ANCHORS
SAY
GRAND TOTAL
EST. 5% FOR REPLACING TOP SOIL ON BORROW PITS
SUMMARY NO.1
SUBTOTAL SUMMARY NO.1
PROJECT SUBTOTAL
SUMMARY NO.2
SUBTOTAL SUMMARY NO.2
SUMMARY OF EARTHWORK
17BP.14.R.145 3B-1
-L-10+57.00 11+38.05 LT 11+38.05 1
-L-12+08.72 12+23.44 LT 12+08.72
-L-
-L-
11+53.06 RT 11+53.06 1
12+34.52 12+90.00 RT 12+34.52
3 1
43.75’
43.75’
AT-1 1 @ 6.25’=-6.25’
0.00’
25.00’
12.50’
37.50’1
GEOTEXTILE FOR SOIL STABILIZATION = 25 SY
CLASS IV SUBGRADE STABILIZATION = 25 TONS
SELECT GRANULAR MATERIAL = 25 CY
UNDERCUT EXCAVATION = 25 CY
INCIDENTAL STONE = 25 TONS
CONTINGENCY ITEMS:
25.00’
1
CAT-1
11+08.82
1
25.00’18.75’
1
1
1 1
31
TYPE III 4 @ 18.75’=
-75.00’
-18.75’-56.25’
100’
-L- STA. 10+50.00 TO STA. 11+44.01 (BEGIN BRIDGE)
-L- STA. 12+16.74 (END BRIDGE) TO STA. 12+90.00
93.75’
AMF 03/16/2017
132
135
1 33
25
25
0.5
0.5
1
0.525
7
6.257
7
7
4
4
4
4
GREU TL-2 3 @ 25’=
GREU GREU
71
71
20
20
91
91
95
115
115
17
17
132
44
44
3
3
44 3
2
43
45
-3WASTE IN LIEU OF BORROW -3
0
0
6/21/00DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
COMPUTED BY:
CHECKED BY:DATE:
DATE:SHEET NO.PROJECT REFERENCE NO.2/9/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh03_sum.dgnUser:jddavesSIZE A BQUANTITIESFOR DRAINAGESTRUCTURESENDWALLS
STATION
STRUCTURE NO.R.C.P.C.S.P..109.079.109PER EACH (0’ THRU 5.0’)5.0’ THRU 10.0’10.0’ AND ABOVE* TOTAL L.F. FOR PAYQUANTITY SHALL BE COL.’A’ + (1.3 X COL.’B’)FROMTOTYPE OF GRATE
C.B. STD. 840.01 OR STD. 840.02ABBREVIATIONS
LOCATION (LT,RT, OR CL)REMARKS
12"15"18"24"30"36"42"48"12"36"42"48"
LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48" & UNDER)
STANDARD 840.03
AND HOOD
FRAME, GRATES
CU. YDS.
OR GAUGE
THICKNESS
*FT.
LIN.TOP ELEVATIONINVERT ELEVATIONINVERT ELEVATIONSLOPE CRITICALOTHERWISE)
NOTED
(UNLESS
STD. 838.80
OR
STD. 838.11
STD. 838.01,
C.B.
N.D.I.
D.I.
J.B.
M.H.
CATCH BASIN
NARROW DROP INLET
DROP INLET
JUNCTION BOX
MANHOLE
TRAFFIC BEARING DROP INLETT.B.D.I.
T.B.J.B.TRAFFIC BEARING JUNCTION BOX
G.D.I.GRATED DROP INLET
G.D.I. (N.S.)
(NARROW SLOT)
GRATED DROP INLET
48"42"36"30"24"18"15"DROP INLETCATCH BASINSECTIONTRANSITIONALCONCRETE(RCP, CSP, CAAP, HDPE, or PVC)
DRAINAGE PIPE
CORR. STEEL ELBOWS NO. & SIZECONC. COLLARS CL. "B" C.Y. STD 840.72CONC. & BRICK PIPE PLUG, C.Y. STD. 840.71PIPE REMOVAL LIN.FT.DO NOT USE RCPDO NOT USE CSPDO NOT USE CAAPDO NOT USE HDPEC.S. PIPE
15"18"24".064.064.064.064(CLASS III)
R.C. PIPE
12"18"24"30"36"42"48"15"**" R. C. PIPE (CLASS V)**" R. C. PIPE CULVERTS, CONTRACTOR DESIGN PIPE**" R. C. PIPE CULVERTS, CONTRACTOR DESIGN PIPE15" SIDE DRAIN PIPE18" SIDE DRAIN PIPE(CLASS IV)
R.C. PIPE
SUB-REGIONAL & REGIONAL
See "Standard Specifications For Roads and Structures, Section 300-5".
TOTAL
GFE
NOTE: Invert Elevations are for Bid Purposes only and shall not be used for project construction stakeout.
17BP.14.R.145 3D-1
401-L- 10+89.47 RT G.D.I. (N.S.) FRAME WITH TWO GRATES STD. 840.29 MODIFIED CONCRETE FLUME1
-L- 12+74.24 RT 402 1
2167.56’2167.16’20
20
AMF 03/16/2017
AREA AREA
REMAINING EASE.
CONST.
PERM.
DRAIN.
EASE.
TOTAL
ACREAGE TAKEN
PROPERTY OWNERS NAMES
NO.
PARCEL
1 8.49 8.22
PERM.
EASE.
UTILITY
(ACRES)(ACRES)(ACRES)(ACRES)(ACRES)
--6/21/00DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
COMPUTED BY:
CHECKED BY:DATE:
DATE:SHEET NO.PROJECT REFERENCE NO.2/8/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh03_sum.dgnUser:jddaves17BP.14.R.145 3P-1
PARCEL INDEX SHEET
DOUGLAS L. HOOPER 0.27 0.04
AMF 03/16/2017
0.02
18" CMPTHE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT 3 BL-3 592099.9809 765989.8900 2167.81 16+70.63 9.13 RT
2 BL-2 591948.5931 765898.6354 2167.47 14+93.14 10.67 RT
1 BL-1 591745.8460 765795.2580 2167.19 12+66.24 11.32 LT
G100 GPS-100 591599.7790 765895.4520 2169.80 10+82.92 14.74 RT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
POINT DESC. NORTH EAST ELEVATION EL STATION OFFSET
BL
STRUCTURE: 49-0203
EXISTING R/W
EXISTING R/W
INV=2163.79’
GR
BL-1
GR
W
G
C
O
N
C
1 S F D
CONCCANEY FORK CREEK
CANEY FORK CREEK
ELEV.2202.26’
LOW WIRE
BST
BST
EXISTING R/W
EXISTING R/W
GPS-100
GR/SOI
LHOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
CANEY FORK RD.
.21 MI. +/- TO SR 1737
BL-2
INV=2165.44’18.00’18.00’50.00’DUKE ENERGY R/W50.00’
WOODS
WOODS
WOODS
BM-2
BM-1
CANEY FORK CREEK
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
-L-
N 591541 E 765827
BM #1
ELEVATION = 2165.74’
-L- STATION 10+00.96 17.51’ LEFT
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
417BP.14.R.145
8/17/992/16/2018S:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Proj\Jackson203_rdy_psh.dgnUser:jddaves2,150
2,154
2,158
2,162
2,166
2,170
2,150
2,154
2,158
2,162
2,166
2,170
1110 12 13 14
DESIGN FREQUENCY
DESIGN DISCHARGE
STRUCTURE HYDRAULIC DATA
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
AT DATE OF SURVEY
W.S. ELEVATION
=
=
=
=
=
=
=
=
=
= CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
FT
2320
2
2167.2
9390
100
2173.6
3080
2 +
2168.3
2159.7
C/L ELEV. = 2,168.34’
SKEW = 60
1 @70’, 24" CORED SLABS W/ VERT. ABTS.
C/L STA. 11+80.31 -L-
PAVED SHOULDER
PROPOSED FULL DEPTHNC GRI
DNAD
8
3 NA
2
0
11 AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
REE
CE M. SCHULER26960 NORH C
ROLI
N
APROFESSIONAL
ENGINEER
T A
RUONDIR .S YEL
DARB033023
S E A L
-L-
NOT TO SCALE
SKETCH SHOWING RELATIONSHIP OF PAVEMENT WIDTH TO BRIDGE WIDTH
1’-1"
1’-1"
TYPE III
GREU TL-2
R=30’
TYPE III
SHOP CURVED AT-1
R=50’
TYPE III
SHOP CURVED
R=30’
TYPE III
SHOP CURVED9’9’27’-0"11’-5"13’-5"END BRIDGE TO -L- STA. 12+78.51 RT
SHOULDER BERM GUTTER
DB 992 PG 102
DOUGLAS L. HOOPER
DB 992 PG 102
DOUGLAS L. HOOPER
POT Sta. 10+00.00
PC Sta. 10+77.29
PT St
a. 11+41.01PC St
a. 12+12.23PCC Sta. 12+63.54
PT Sta. 13+20.84
POT Sta. 14+14.76
PI Sta 11+14.30
D
L = 63.71’
T = 37.00’
R = 50.00’
PI Sta 12+40.40
D
L = 51.31’
T = 28.17’
R = 50.00’
PI Sta 12+92.23
D
L = 57.30’
T = 28.69’
R = 470.00’EXI
STEXIST-L- CURVE DATA02
0202020
2
0
2 0202-L- STA. 12+90.00
END PROJECT
-L- STA. 10+50.00
BEGIN PROJECT
AT-1 9.5’TYPE IIIR=30’TYPE IIISHOP CURVEDR=50’TYPE IIISHOP CURVEDR=10’
R=20’
R=15’
-L- STA. 11+43.95
BEGIN BRIDGE
-L- STA. 12+16.67
END BRIDGE
9’9’0
1
0
1
0000
01
01
10’
+
9
9.
7
1
R=30’TYPE IIISHOP CURVED
GREU TL-2
G R EU TL-2
GREU TL-2EXIST
10EXIST( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
2:1D
FROM STA. 10+60.00 TO STA. 11+50.00 RT
Min. D= 1.0 Ft.
DETAIL A
Ground
Natural
Flatter4:1 or
Slope
Fill
-L- STA. 11+32.83
BEGIN APPROACH SLAB
-L- STA. 12+29.23
END APPROACH SLAB
(+)2.5299%(-)1.5317%
(-)1.5317%(-)0.1956%
PI = 11+10.00
EL = 2,169.42’
VC = 50’
K = 12
PI = 12+65.00
EL = 2,167.05’
VC = 35’
K = 26
EL. = 2167.00
-L- STA. 12+90.00
END GRADE
EL. = 2167.90
-L- STA. 10+50.00
BEGIN GRADE
2
.68%ELEV. = 2167.90STA. 10+60 RTCUT DITCHBEGIN SPECIALELEV. = 2165.71STA. 11+50 RTCUT DITCHEND SPECIALELEV. = 2167.73STA. 10+75 RT1.13%ELEV. = 2166.39STA. 11+25 RT2
.72%
=2159.7’ (7/25/16)
NORMAL WSEL
ABANDON R/W
30.00’ RT.
10+77.29 -L-30.00’ RT
EX R/W
10+40.00 -L-
30.00’ RT.
11+41.01 -L-
30.00’ RT.
12+12.21 -L-
30.00’ RT.
12+63.54 -L-
30.00’ LT.
12+63.54 -L-
30.00’ LT.
12+12.21 -L-
30.00’ LT.
11+41.01 -L-
30.00’ LT.
10+77.29 -L-
30.00’ LT
EX R/W
10+40.00 -L-
1
1
40.00’ LT.
30.00’ LT.
12+45.00 -L-
30.00’ LT.
EX R/W
13+05.00 -L-
30.00’ RT.
EX R/W
13+05.00 -L-
70.00’ LT.
50.00’ LT.
30.00’ LT.
12+00.00 -L-
70.00’ LT.
30.00’ LT.
11+60.00 -L-
38.00’ RT
30.00’ RT.
11+15.00 -L-
38.00’ RT.
30.00 RT.
11+35.00 -L-
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 11 TONS
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 54 TONS
401
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
402
5 SY FF1 TONRIP RAPCLASS B
15" RCP
GTD
MCF
POT Sta. 10+00.00
PC Sta. 10+77.29
PT St
a. 11+41.01PC St
a. 12+12.23PCC Sta. 12+63.54
PT Sta. 13+20.84
POT Sta. 14+14.76
PI Sta 11+14.30
D
L = 63.71’
T = 37.00’
R = 50.00’
PI Sta 12+40.40
D
L = 51.31’
T = 28.17’
R = 50.00’
PI Sta 12+92.23
D
L = 57.30’
T = 28.69’
R = 470.00’EXI
STEXIST-L- CURVE DATA02
0202020
2
0
2 0202-L- STA. 12+90.00
END PROJECT
-L- STA. 10+50.00
BEGIN PROJECT
AT-1 9.5’TYPE IIIR=30’TYPE IIISHOP CURVEDR=50’TYPE IIISHOP CURVEDR=10’
R=20’
R=15’
-L- STA. 11+43.95
BEGIN BRIDGE
-L- STA. 12+16.67
END BRIDGE
9’9’0
1
0
1
0000
01
01
10’
+
9
9.
7
1
R=30’TYPE IIISHOP CURVED
GREU TL-2
G R EU TL-2
GREU TL-2EXIST
10EXIST( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
2:1D
FROM STA. 10+60.00 TO STA. 11+50.00 RT
Min. D= 1.0 Ft.
DETAIL A
Ground
Natural
Flatter4:1 or
Slope
Fill
-L- STA. 11+32.83
BEGIN APPROACH SLAB
-L- STA. 12+29.23
END APPROACH SLAB
N 591804 E 765806
ELEVATION = 2171.57’
-L- STATION 13+06.21 18.13’ LEFT
BM #2
C
C
F
F
F
F
C
C
F
F
F
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS TMP-1
SHEET NO.User:jddavesV:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-1.dgn2/14/2018TRAFFIC CONTROL PROJECT ENGINEER
TRAFFIC CONTROL PROJECT DESIGN ENGINEER
STATE TRAFFIC MANAGEMENT ENGINEER
TRAFFIC CONTROL DESIGN ENGINEER
INDEX OF SHEETS
SHEET NO.TITLE
APPROVED:
DATE:
TRANSPORTATION MANAGEMENT PLAN
N.C.D.O.T. W ORK ZONE TRAFFIC CONTROL
WORK ZONE SAFETY & M OBILITY
ONFOETATS
DEPARTMENT
OF TRANSPORTATIONANIL
ORACHTR
NFO
ETATSDEP
ART
ME
N
TOFRATNSPOR TATIONANILORA
C
HTRO
"from the M OUNTAINS to the COAST"
DEPARTE
N
OF ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
ENGINEER
PROJECT
ENGINEER
DESIGN
LLOYD D. BROWN, P.E.
TMP-1 TITLE SHEET AND INDEX OF SHEETS
PROJECT: Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3509
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
Boone, NC
828 355 9933
919 977 9455
704 357 0488
Charlotte, NCRaleigh, NC
DIVISION 14
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
ALEX FITZPATRICK
JACKSON COUNTY
17BP.14.R.145TMP-1A LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS
AND LEGEND
AND LOCAL NOTES)
(MANAGEMENT STRATEGIES, GENERAL NOTES,
TMP-1B TRANSPORTATION OPERATIONS PLAN:
TMP-3 TEMPORARY TRAFFIC CONTROL PHASE I DETAIL
TMP-4 TEMPORARY TRAFFIC CONTROL PHASE II DETAIL
TMP-2 TEMPORARY TRAFFIC CONTROL PHASING
VICINITY MAP
LOCATION
PROJECTHooperCemeteryRd.MosesCreekJohnsCreek Rd.
.62East Laport
dR
H HFMoses
Creek
Church
Stephenson
Cemetery
Hooper
Cemetery
Z
Hooper
Knob
Shelton Mountain
Alum
3719summit
NC GRID
NAD 83 NA 2011
TYPE OF WORK: GRADING, DRAINAGE, AND STRUCTURE
ON SR 1738 (HOOPER CEMETERY ROAD)
LOCATION: BRIDGE NO. 490203 OVER CANEY FORK CREEK
JOSEPH E. HUMMER
PHONE: (919) 814-5000 FAX: (919) 771-2745
750 N. GREENFIELD PARKWAY, GARNER, NC 27529 (DELIVERY)
1561 MAIL SERVICE CENTER (MSC) RALEIGH, NC 27699-1561
SPECIAL PROVISION
TMP-5 TRANSPORTATION MANAGEMENT PLAN AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
1735
1735
1736
1738
1737
1737
1740
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.User:jddavesV:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-1A.dgn2/14/2018TMP-1A
LEGENDROADWAY STANDARD DRAWINGS
TITLESTD. NO.
FLAGGER
TRAFFIC CONTROL DEVICES
CONE
DRUM
STATIONARY SIGN
PORTABLE SIGN
CHANGEABLE MESSAGE SIGN
STATIONARY OR PORTABLE SIGN
SKINNY DRUM
BARRICADE (TYPE III)
TEMPORARY SIGNING
SIGNALS
PAVEMENT MARKERS
CRYSTAL/CRYSTAL
CRYSTAL/RED
YELLOW/YELLOW
PAVEMENT MARKINGS
E
M
P
T
LAW ENFORCEMENT
TEMPORARY CRASH CUSHION
PAVEMENT MARKING SYMBOLS
EXISTING LINES
TEMPORARY LINES
PAVEMENT MARKING SYMBOLS
EXISTING PROPOSED TEMPORARY
DIRECTION OF TRAFFIC FLOW
NORTH ARROW
GENERAL
EXIST. PVMT.
PROPOSED PVMT.
DIRECTION OF PEDESTRIAN TRAFFIC FLOW
TUBULAR MARKER
TEMPORARY STONE
WORK AREA
DRAWINGS & LEGEND
ROADWAY STANDARD
THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" -
1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
1205.12 PAVEMENT MARKINGS - BRIDGES
1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
1262.01 GUARDRAIL END DELINEATION
1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI-LANE ROADWAYS
1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
1150.01 FLAGGING DEVICES
1145.01 BARRICADES
1135.01 CONES
1130.01 DRUM
1110.02 PORTABLE WORK ZONE SIGNS
1110.01 STATIONARY WORK ZONE SIGNS
1101.11 TRAFFIC CONTROL DESIGN TABLES
1101.05 WORK ZONE VEHICLE ACCESSES
1101.02 TEMPORARY LANE CLOSURES
FLASHING ARROW BOARD
TRUCK MOUNTED ATTENUATOR (TMA)
TEMP. SHORING (LOCATION PURPOSES ONLY)
E
M
P
T
1101.01 WORK ZONE ADVANCE WARNING SIGNS
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., DATED JANUARY 2018
ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED
A PART OF THESE PLANS:
PORTABLE TRAFFIC SIGNAL
862.01 GUARDRAILL PLACEMENT
AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
GENERAL NOTES / LOCAL NOTES
STRATEGIES
MANAGEMENT
CONSTRUCT THE NEW TIE-INS.
SB PROPOSED ROADWAY IS CONSTRUCTED. A FLAGGING OPERATION WILL BE USED TO
ONE-LANE TWO-WAY PATTERN USING TEMPORARY TRAFFIC CONTROL SIGNALS WHILE THE
PHASE 2 DEPICTS TRAFFIC SHIFTED TO THE PARTIALLY CONSTRUCTED ROADWAY ON A
PROPOSED ROADWAY IS CONSTRUCTED
PHASE I DEPICTS TRAFFIC TO BE MAINTAINED ON THE EXISTING ROAD WHILE THE NB
OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA.
WARNING "UNEVEN LANES" SIGNS (W8-11) IN ADVANCE AND A MINIMUM
LANES OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE
G) DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN
ENGINEER, AT NO EXPENSE TO THE DEPARTMENT.
BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE
POSTED SPEED LIMITS LESS THAN 45 MPH.
BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH
POSTED SPEED LIMITS OF 45 MPH OR GREATER.
BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH
EDGE OF PAVEMENT DROP-OFF AS FOLLOWS:
PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN
F) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING
PAVEMENT EDGE DROP OFF REQUIREMENTS
WITH GUARDRAIL OR BARRIER.
TRAVELWAY, RAMP, OR LOOP WITHIN THE SAME LOCATION UNLESS PROTECTED
E) DO NOT WORK SIMULTANEOUSLY WITHIN 15 FT ON BOTH SIDES OF AN OPEN
EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE.
BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR
THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS, OR AS DIRECTED
OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO
D) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL
BARRIER OR GUARDRAIL.
STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN
C) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER
LONGER NEEDED OR AS DIRECTED BY THE ENGINEER.
PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO
B) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING
7 P.M. TO 12 A.M. >30 MINUTES
4 P.M. TO 7 P.M. DO NOT CLOSE
9 A.M. TO 4 P.M. >30 MINUTES
6 A.M. TO 9 A.M. DO NOT CLOSE
HOOPER CEMETERY ROAD 12 A.M. TO 6 A.M. >45 MINUTES
SR 1738
RESTRICTIONS OPERATION
ROAD NAME DAY AND TIME DURATION AND
A) DO NOT STOP TRAFFIC AS FOLLOWS:
LANE AND SHOULDER CLOSURE REQUIREMENTS
OR DIRECTED BY THE ENGINEER.
THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
ENGINEER.
SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE
OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING,
TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED
DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE
CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL
BY THE END OF EACH DAY’S OPERATION.
P) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS
LINES.
O) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING
APPLICATION AND EVERY SIX MONTHS AS DIRECTED BY THE ENGINEER.
SECOND APPLICATION OF PAINT SIX (6) MONTHS AFTER THE INITIAL
N) PLACE ONE APPLICATION OF PAINT FOR TEMPORARY TRAFFIC PATTERNS. PLACE A
ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY.
M) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN R11-2
FOR ADDITIONAL REQUIREMENTS.
STRUCTURES SECTIONS 1130 (DRUMS), 1135 (CONES) AND 1180 (SKINNY DRUMS)
OPEN TRAVELWAY. REFER TO STANDARD SPECIFICATIONS FOR ROADS AND
(MPH) EXCEPT, 10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN
IN WORK AREAS NO GREATER IN FEET THAN TWICE THE POSTED SPEED LIMIT
L) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZING DEVICES
TRAFFIC CONTROL DEVICES
ENGINEER.
(W8-1) 100 FT IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE
K) INSTALL BLACK ON ORANGE ’’DIP’’ SIGNS (W8-2) AND/OR "BUMP" SIGNS
TRAFFIC PATTERN.
J) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY
(3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE
I) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN
SIGNING
TRAFFIC PATTERN ALTERATION.
H) NOTIFY THE ENGINEER TWENTY ONE (21) CALENDAR DAYS PRIOR TO ANY
TRAFFIC PATTERN ALTERATIONS
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
TMP-1B
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:jddavesS:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-1B.dgn2/16/2018 TO DELINEATE THE EDGE OF ROADWAY ALONG UNPAVED AREAS.
200 FT RESPECTIVELY IN ADVANCE OF THE UNEVEN AREAS. USE DRUMS
AND BLACK ON ORANGE ’’PAVEMENT ENDS’’ SIGNS (W8-3) 100 FT AND
THE ENGINEER. PLACE BLACK ON ORANGE "LOOSE GRAVEL" SIGNS (W8-7)
TIE-IN AREA TO AN APPROPRIATE ROADWAY ELEVATION AS DETERMINED BY
Q) IN THE EVENT A TIE-IN CANNOT BE MADE IN ONE DAY’S TIME, BRING THE
MISCELLANEOUS
BOARD 30 DAYS PRIOR TO ROAD CLOSURE.
NOTIFY THE FIRE DEPT, E.M.S., AND JACKSON COUNTY SCHOOL
EMERGENCY VEHICLE ACCESS MUST BE MAINTAINED
AT ALL TIMES.
1)
2)
DURING CONSTRUCTION.
BE MAINTAINED BETWEEN CLOSURE POINTS AT ALL TIMES
3) LOCAL ACCESS TO ALL RESIDENCES AND BUSINESSES WILL
LOCAL NOTES:
PLAN
TRANSPORTATION OPERATIONS
(MANAGEMENT STRATEGIES & GENERAL NOTES) AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
PROJECT PHASING
PHASE I PHASE II
- OPEN SR 1738 (HOOPER CEMETERY ROAD) TO A TWO-LANE TWO-WAY TRAFFIC.
STEP 7: - REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES AND SIGNALS.
STEP 6: - CONSTRUCT CLOSURE POUR.
(PAINT) ON THE ENTIRE PROJECT (SEE PMP-2).
PHASE I. PLACE THE FINAL LAYER OF SURFACE COURSE, AND THE FINAL PAVEMENT MARKINGS
AS NECESSARY, CONSTRUCT GUARDRAIL, AND REMOVE TEMPORARY GUARDRAIL PLACED IN STEP 4,
STEP 5: - USING ROADWAY STANDARD DRAWINGS NO. 1101.02, SHEET 1 OF 14, AND FLAGGERS
STEP 5: - AWAY FROM TRAFFIC, CONSTRUCT TEMPORARY GUARDRAIL ALONG -L- (SEE SHEET TMP-4).
(SEE SHEET TMP-4).
INTO A ONE-LANE TWO-WAY PATTERN IN THE NORTHBOUND LANE OF SR 1738 (HOOPER CEMETERY ROAD)
- ACTIVATE PORTABLE TRAFFIC SIGNALS AND DIRECT SR 1738 (HOOPER CEMETERY ROAD) TRAFFIC
(SEE SHEET TMP-3)
- PLACE TEMPORARY STONE (6" ABC) FROM -L- STA. 11+95 +/- TO -L- STA. 12+60 +/-
NECESSARY, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY ROAD):
STEP 2: USING ROADWAY STANDARD DRAWINGS NO. 1101.02, SHEET 1 & 14 OF 14, AND FLAGGERS AS
NOTE: STEP 2 SHALL BE COMPLETED IN A CONTINUOUS OPERATION.
- INSTALL PORTABLE TRAFFIC SIGNALS AS REQUIRED IN THE SIGNAL PLANS (SEE SHEET SIG-1)
NO. 1101.01, SHEET 3 OF 3.
STEP 1: - ERECT WORK ZONE ADVANCED WARNING SIGNS USING ROADWAY STANDARD DRAWINGS
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
TMP-2
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:jddavesV:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-2.dgn2/14/2018
- REMOVE ALL TEMPORARY SHORING PLACED IN STEP 3, PHASE I (SEE SHEET TMP-3).
- REMOVE EXISTING STRUCTURE (SEE STRUCTURAL PLANS).
STEP 2: - AWAY FROM TRAFFIC, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY ROAD):
(HOOPER CEMETERY ROAD),(SEE SHEET TMP-4).
INTO A ONE-LANE TWO-WAY PATTERN IN THE NEWLY CONSTRUCTED NORTHBOUND LANE OF SR 1738
- ACTIVATE PORTABLE TRAFFIC SIGNALS AND DIRECT SR 1738 (HOOPER CEMETERY ROAD) TRAFFIC
-L- STA. 12+25 +/- TO -L- STA. 12+80 +/- (SEE SHEET TMP-4)
- PLACE TEMPORARY STONE (6" ABC) FROM -L- STA. 10+50 +/- TO -L- STA. 11+55 +/- AND
NECESSARY, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY LANE):
STEP 1: USING ROADWAY STANDARD DRAWINGS NO. 1101.02, SHEET 1 & 14 OF 14, AND FLAGGERS AS
NOTE: STEP 1 SHALL BE COMPLETED IN A CONTINUOUS OPERATION.
CONSTRUCT NORTHBOUND (RIGHT SIDE) APPROACH SLAB ONLY(SEE SHEET TMP-3).
- CONSTRUCT APPROACH SLABS FOR BRIDGE 490203. ON SOUTH SIDE OF BRIDGE
-L- STA. 12+52 +/- (2) (SEE SHEET TMP-3).
-L- STA. 11+49 +/- (1) AND FROM -L- STA. 12+09 +/- TO
- INSTALL TEMPORARY SHORING FROM -L- STA. 11+22 +/- TO
STEP 3: AWAY FROM TRAFFIC, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY ROAD):
- CONSTRUCT SOUTHBOUND APPROACH SLAB ON SOUTH SIDE OF BRIDGE 203 (SEE SHEET TMP4)
-L- STA. 12+45 +/- (3) (SEE SHEET TMP-3).
STEP 3: - AWAY FROM TRAFFIC, INSTALL TEMPORARY SHORING FROM -L- STA. 11+29 +/- TO
(SEE SHEET TMP-3).
LANE (RIGHT SIDE) UP TO, BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE
- CONSTRUCT -L- (SR 1738 HOOPER CEMETERY ROAD) FROM STA 11+15 TO STA 12+34 NORTHBOUND
- CONSTRUCT STRUCTURE PER STAGE 1 OF THE STRUCTURE PLANS.
NECESSARY, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY ROAD):
STEP 4: USING ROADWAY STANDARD DRAWINGS NO. 1101.02, SHEET 1 & 14 OF 14, AND FLAGGERS AS
SURFACE COURSE (SEE SHEET TMP-4).
SOUTHBOUND LANE (LEFT SIDE), BUT NOT INCLUDING THE FINAL LAYER OF
- CONSTRUCT -L- (SR 1738 HOOPER CEMETERY ROAD) FROM STA 11+15 TO STA 12+34
- CONSTRUCT STRUCTURE PER STAGE 2 OF THE STRUCTURAL PLANS.
NECESSARY, PERFORM THE FOLLOWING ON -L- SR 1738 (HOOPER CEMETERY ROAD):
STEP 4: USING ROADWAY STANDARD DRAWINGS NO. 1101.02, SHEET 1 & 14 OF 14, AND FLAGGERS AS AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
PHASING
TEMPORARY TRAFFIC CONTROL
-L- STA. 12+52 –
-L- STA. 12+09 – TO
TEMPORARY SHORING
-L- STA. 11+49 –
-L- STA. 11+22 – TO
TEMPORARY SHORING
1
2
TO END
-L- STA. 12+90 –
END PROJECT 17BP.14.R.145
TYP.
10’
CANEY FORK RD
TO SR 1737
-L- STA. 14+10 –
-L- STA. 10+50 –10-L- STA. 11+70 -L- STA. 12+75
-L-
-L-
TAPER
TWO-WAY TRAFFIC50’ ONE-LANE
TAPER
TWO-WAY TRAFFIC
50’ ONE-LANE
-L- STA. 10+50 –
BEGIN PROJECT 17BP.14.R.145
MI
N1
1’
HOOPER CEMETERY ROAD
-L- 1738 MIN11’CANEY FORK CREEK
1 2
1
2
1
2
WORK AREA
SCALE 1"=30’
EXIST
BRIDGE
EXISTING
CONSTRUCTION
PROPOSED
GROUND
EXISTING
N.T.S NC GRI
DNAD
8
3 NA
2
0
11
NOT ACTUAL GROUND GROUND
EXISTING
B’
B
TEMPORARY STONE
SIGNAL
TRAFFIC
PORTABLE
TRAFFIC
TWO-WAY
ONE-LANE
11’ MIN
11’ MINA’AN.T.S
O
R
T
P
24’’ X 36’’
R10-6
STOP
RED
HERE ON
48’’ X 48’’
W3-3
48’’ X 48’’
BE
PREPARED
TO STOP
W3-4
48’’ X 48’’
AHEAD
ROAD
ONE LANE
W20-4
48’’ X 24’’
END
ROAD WORK G20-2 A
48’’ X 48’’
W24-1R/L
M.P.H.
15
24’’ X 24’’
W13-1
R11-2
48’’ x 30’’
ROAD
CLOSED
TYPE III BARRICADE
SIGNAL
TRAFFIC
PORTABLE
3
3
3
WARNING SIGNS AND SPACING.
1 & 14 OF 14 FOR ADVANCE
OF 3, AND RSD 1101.02, SHEET
3. SEE RSD 1101.01, SHEET 3
CONSTRUCTION SEQUENCE.
2. SEE PHASING NOTES FOR
DURING CONSTRUCTION.
1. MAINTAIN ACCESS TO DRIVEWAYS
NOTES:
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
TMP-3
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:jddavesS:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-3.dgn2/16/20182’ –2’ –
TRAFFIC
TWO-WAY
ONE-LANE
2’ –
CL
CL
GRAVEL ROAD
GRAVEL ROAD
AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
30’ +/-200’ +/-200’ +/-200’ +/-200’ +/-
SIGNAL
TRAFFIC
PORTABLE
PHASE I DETAIL
TEMPORARY TRAFFIC CONTROL
A-A’B-B’
TYPICAL FOR SIGN PLACEMENT
-L- STA. 10+50 –
BEGIN PROJECT 17BP.14.R.145
TAPER
TWO-WAY TRAFFIC50’ ONE-LANE
HOOPER CEMETERY ROAD
-L- 1738
-L- STA. 12+90 –
END PROJECT 17BP.14.R.145
TYP.
10’
-L- STA. 12+80 +/-
3
CANEY FORK RD
TO SR 1737
-L- STA. 11+70 -L- STA. 12+75
TO END
-L- STA. 10+50 –
-L- STA. 14+10 –10-L-
-L-
M
IN11’MIN11’TAPER50’
TO -L- STA. 12+26 –
FROM -L- STA. 11+31 –
TEMPORARY GUARDRAIL
BRIDGE
EXISTING
REMOVE A’A-L- STA. 12+45 –
-L- STA. 11+29 – TO
TEMPORARY SHORING
1
1
2
GROUND
EXISTING
CANEY FORK CREEK
CANEY FORK CREEK
RAIL
BARRIER
CONCRETE
VERTICAL
MIN.
11’
GUARDRAIL
TEMPORARY
CONSTRUCTION
PROPOSED
TRAFFIC
TWO-WAY
ONE-LANE
NOT ACTUAL GROUND
B’
B
TRAFFIC
TWO-WAY
ONE-LANE
MIN.
11’3’5’
GROUND
EXISTING
PROPOSED CONSTRUCTION
TEMPORARY STONENC GRI
DNAD
8
3 NA
2
0
11
WARNING SIGNS AND SPACING.
1 & 14 OF 14 FOR ADVANCE
OF 3, AND RSD 1101.02, SHEET
3. SEE RSD 1101.01, SHEET 3
CONSTRUCTION SEQUENCE.
2. SEE PHASING NOTES FOR
DURING CONSTRUCTION.
1. MAINTAIN ACCESS TO DRIVEWAYS
NOTES:
1 2
R11-2
48’’ x 30’’
ROAD
CLOSED
TYPE III BARRICADE
3
O
R
T
P
24’’ X 36’’
R10-6
STOP
RED
HERE ON
48’’ X 48’’
W3-3
48’’ X 48’’
BE
PREPARED
TO STOP
W3-4
48’’ X 48’’
AHEAD
ROAD
ONE LANE
W20-4
48’’ X 24’’
END
ROAD WORK G20-2 A
48’’ X 48’’
W24-1R/L
M.P.H.
15
24’’ X 24’’
W13-1
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
TMP-4
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:jddavesS:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\TMP-4.dgn2/27/2018WORK AREA
SCALE 1"=30’
TEMPORARY STONE
SIGNAL
TRAFFIC
PORTABLE
3
SIGNAL
TRAFFIC
PORTABLE
N.T.S
CL
CL
3
GRAVEL ROAD
GRAVEL ROAD
AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
AT-1
TEMP.
R=16’
CURVED
SHOP
TEMP.
R=21’
CURVED
SHOP
TEMP.
AT-1
TEMP.
AT-1
TEMP.
CURVED R=16’
TEMP. SHOP
30’ +/-200’ +/-200’ +/-200’ +/-200’ +/-
SIGNAL
TRAFFIC
PORTABLE
B-B’A-A’
TYPICAL FOR SIGN PLACEMENT
PHASE II DETAIL
TEMPORARY TRAFFIC CONTROL
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
TMP-5
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
$$$$USERNAME$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$$$SYSTIME$$$$$
SPECIAL PROVISION
TRANSPORTATION MANAGEMENT PLAN
AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
SPECIAL PROVISION
MANAGEMENT PLAN
TRANSPORTATION
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3509
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
Boone, NC
828 355 9933
919 977 9455 704 357 0488
Charlotte, NCRaleigh, NC
PAVEMENT MARKING PLAN
09/08/99CONTRACT:PMP-1
ENGINEER
TRANSPORTATION
ENGINEER
DESIGN
TRANSPORTATION
LLOYD D. BROWN, P.E.
ROADWAY STANDARD DRAWING
THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" -
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.
DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE
CONSIDERED A PART OF THESE PLANS:
STD. NO.
1205.01
1205.02
1205.12
1261.01
1261.02
1262.01
PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
PAVEMENT MARKINGS - TWO LANE & MULTILANE ROADWAYS
PAVEMENT MARKINGS - BRIDGES
GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
GUARDRAIL AND BARRIER DELINEATORS - TYPES & MOUNTING
GUARDRAIL END DELINEATION
TITLE
GENERAL NOTES
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
THE CONSTRUCTION PROJECT, EXCEPT WHEN OTHERWISE NOTED IN THE PLAN,
OR DIRECTED BY THE ENGINEER.
B) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND MARKERS.
SHEET NO.
PMP-2
PMP-1
INDEX
A) INSTALL PAVEMENT MARKINGS ON THE FINAL SURFACE
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NOR
H
ROL
NA
T
S CAI
M
TTR
T
WORK
Z
ONE TRAFFIC
CONTRO LDIVISION OF
HI
GHWA
YS
PLANS REVIEWED BY: N.C.D.O.T SIGNING AND DELINEATION UNIT
SIGNING & DELINEATION PROJECT DESIGN ENGINEER
THE ENGINEER.
C) PASSING ZONES WILL BE DETERMINED IN THE FIELD AND MUST BE APPROVED BY
DESCRIPTION
K. L. JORDAN
M. TRACEY, P.E.
SIGNING & DELINEATION REGIONAL ENGINEER
2/14/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\PMP-1.dgnUser:jddavesJACKSON COUNTY
SHEET NO.PROJECT REFERENCE NO.
PROJECT:DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
14BP.14.R.14514BP.14.R.145
ALEX FITZPATRICK
MARKING MARKER
PAVEMENT MARKING
SCHEDULE
SYMBOL DESCRIPTION
PA
PI
PAVEMENT MARKINGS
FINAL
PAINT (4")
WHITE EDGELINE
YELLOW DOUBLE CENTER
DN00464AND SCHEDULE
PAVEMENT MARKING PLAN TITLE SHEET
PAVEMENT MARKING DETAIL AND QUANTITIES
SR 1738 (HOOPER CEMETERY ROAD)
ROAD NAME:
PAINT NONE
ON SR 1738 (HOOPER CEMETERY ROAD)
LOCATION : BRIDGE NO. 490203 OVER CANEY FORK CREEK AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
-L- STA. 10+50 –
BEGIN PROJECT 17BP.14.R.145
-L- STA. 12+90 –
END PROJECT 17BP.14.R.145
CANEY FORK RD
TO SR 1737
TO END
HOOPER CEMETERY ROAD-L- SR 1738
10BRIDGE NO. 490203
CANEY FORK CREEK
TYPE III
AT-1
17BP.14.R.145
SHEET NO.PROJ. REFERENCE NO.
PMP-2
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
User:jddavesS:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\PMP-2.dgn2/16/2018MARKING SCHEDULE
FINAL PAVEMENT
PA
PI
WHITE EDGELINE (4") - PAINT
YELLOW DOUBLE CENTER (4") - PAINT 480 FT
480 FT 4810000000-E
4810000000-E
960 FT
960 FT
SYMBOL DESCRIPTION QUANTITY BREAKDOWN PAY ITEM TOTAL QUANTITY AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
SCALE: 1"=20’NC GRI
DNAD
8
3 NA
2
0
11
PA PI
PI
PA
PI
PA
GRAVEL ROAD
GRAVEL ROAD
R=50’
TYPE III
SHOP CURVED
R=30’
TYPE III
SHOP CURVED
R=30’
TYPE III
SHOP CURVED
GREU TL-2
GREU TL-2
GREU TL-2
9’9’9’9’
AND QUANTITIES
PAVEMENT MARKING DETAIL
CANEY FORK RD
TO SR 1737
HOOPER CEMETERY ROAD-L- 1738
TO END
15 MPH DESIGN SPEED
+2.529% GRADE
-L- STA. 10+50 –
BEGIN PROJECT 17BP.14.R.145
15 MPH DESIGN SPEED
-0.195% GRADE
-L- STA. 12+90 –
END PROJECT 17BP.14.R.145
CANEY FORK CREEK
CANEY FORK CREEKNC GRI
DNAD
8
3 NA
2
0
11
SEAL
PREPARED BY:
SIG. INVENTORY NO.
SCALE REVISIONS
REVIEWED BY:
INIT.DATE
REVIEWED BY:
DATESIGNATURE
PLAN DATE:
0
DIV. 14
PASSAGE/GAP
RED CLEARANCE
MAX. 1
RECALL POSITION
MINIMUM GREEN
PHASE 01 02
VEHI. CALL MEMORY
YELLOW CHANGE INT.
SEC.
SEC.
SEC.
SEC.
SEC.
SEC.
SEC.
SEC.
SEC.
SEC.
TIMING CHART
MAX. RECALL
NEMA CONTROLLER
--
LDB
MAX. RECALL
JACKSON COUNTY
Prepared in the Office of:
Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3509
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
Boone, NC
828 355 9933
919 977 9455 704 357 0488
Charlotte, NCRaleigh, NC
2/16/2018S:\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Traffic\TrafficControl\TCP\SIG-1.dgnUser:jddavesDOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NOTES
SIGNAL FACE I.D.
R
Y
G
12"
21
11
SHEET NO.PROJECT REFERENCE NO.
SIG. 1
R
/
W
TABLE OF OPERATION
FACE
SIGNAL CLEAR
01
1 2
R R
Y RG
R
R
/
W
F
L
A
S
H
CLEAR
02
1 2
Y RG R
RRRR
02 01
11
21
PHASING DIAGRAM
PEDESTRIAN MOVEMENT
UNSIGNALIZED MOVEMENT
UNDETECTED MOVEMENT (OVERLAP)
DETECTED MOVEMENT
PHASING DIAGRAM DETECTION LEGEND
RC
(ISOLATED)
PRE-TIMED
20 TT01 02
2/9/2018
17BP.14.R.145
SR 1738 HOOPER CEMETERY ROAD
PORTABLE TRAFFIC SIGNAL PLAN
CGM
-L- STA. 10+50 –
PORTABLE TRAFFIC SIGNAL
11
21
-L- STA. 14+10 –
PORTABLE TRAFFIC SIGNAL
30 AIN
HT
OR LR
O
CA
ROFESSION
GE
NREINE
SEALPNAL
LL
O
YD D. BROWN20119
40
26
3.0
0
27
40
26
3.0
0
27
MANUFACTURER AND MODEL.
3. CONTRACTOR TO UTILIZE NCDOT PRE-APPROVED PORTABLE TRAFFIC SIGNAL
2. NO COUNTS AVAILABLE.
1. PORTABLE TEMPORARY INSTALLATION.
CANEY FORK CREEK
CANEY FORK CREEK
CANEY FORK CREEK
4
TO END
TO SR 1737
JACKSON COUNTY
ON SR 1738 (HOOPER CEMETERY ROAD)
GRADING, DRAINAGE, PAVING, AND STRUCTURE
LENGTH ROADWAY PROJECT 17BP.14.R.145 = 0.031 MI
LENGTH STRUCTURE PROJECT 17BP.14.R.145 = 0.014 MI
SR 1738 (HOOPER CEMETERY RD.)NC GRI
DNAD
8
3 NA
2
0
11
-L- STA 12+16.74
END BRIDGE
-L- POT STA. 10+50.00
BEGIN PROJECT 17BP.14.R.145
-L- POT STA. 12+90.00
END PROJECT 17BP.14.R.145
TOTAL LENGTH OF PROJECT 17BP.14.R.145 = 0.045 MI
-L-
-L- STA 11+44.01
BEGIN BRIDGE
PROJECT LENGTH
HYDRAULICS ENGINEER
TYPE OF WORK:
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
BRIDGE NO. 490203 OVER CANEY FORK CREEK
Prepared in the Office of:
VAUGHN & MELTON
FOR THE NORTH CAROLINA DIVISION OF HIGHWAYS
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
09/08/99 2/13/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Environmental\Erosion Control Design Files\Jackson203_Env_EC1.dgnUser:cjmartell Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01 Coir Fiber Baffle
1645.01 Temporary Stream Crossing
ROADSIDE ENVIRONMENTAL UNIT
Raleigh, NC 27611
1 South Wilmington St.
Prepared in the Office of:
NAME LEVEL III CERTIFICATION NO.
Reviewed by:
Reviewed in the Office of:
Designed by:
Consulting Engineers
Vaughn & Melton
Asheville, NC 28806
1318-F Patton Avenue
Christian J. Gonzalez-Martell 3939
for Special Considerations.
Refer To E. C. Special Provisions
ON THIS PROJECT
SENSITIVE AREA(S) EXIST
ENVIRONMENTALLY
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
ENGINEER.
NEED TO BE INSTALLED AS DIRECTED BY THE
ADDITIONAL EROSION CONTROL DEVICES MAY
REQUIRE PRIOR APPROVAL BY ENGINEER.
NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL
EROSION AND SEDIMENT CONTROL MEASURES
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
1606.01 Special Sediment Control Fence
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
EW
CFW
0
PLANS
EC-1
201020 40
GRAPHIC SCALE
VICINITY MAP
LOCATION
PROJECTHooperCemeteryRd.MosesCreekJohnsCreek Rd.
.62East Laport
dR
H HFMoses
Creek
Church
Stephenson
Cemetery
Hooper
Cemetery
Z
Hooper
Knob
Shelton Mountain
Alum
3719summit
NC GRID
NAD 83 NA 2011
17BP.14.R.145PROJECT:DN00464CONTRACT:17BP.14.R.145
JACKSON COUNTY
RESOURCES.
RESOURCES DIVISION OF WATER
OF ENVIRONMENT AND NATURAL
THE NORTH CAROLINA DEPARTMENT
AUGUST 1, 2016 AND ISSUED BY
CONSTRUCTION PERMIT EFFECTIVE
BY THE NCG-010000 GENERAL
THE REGULATIONS SET FORTH
CONTROL PLANS COMPLY WITH
THESE EROSION AND SEDIMENT
OVER CANEY FORK CREEK.
LOCATION: STRUCTURE NO. 490203 ON SR 1738
2018 STANDARD SPECIFICATIONS
Reid Whitehead, PE, CPESC
Unit - N. C. Department of Transportation - Raleigh, N. C., dated JANUARY 2018 and the latest
STANDARDS.
SENSITIVE WATERSHED
BEEN DESIGNED TO
THIS PROJECT HAS
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE.
2018 STANDARD SPECIFICATIONS
Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3590
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
Boone, NC
828 355 9933
919 977 9455
704 357 0488
Charlotte, NCRaleigh, NC
1735
1735
1736
1738
1737
1737
1740
FLOW
A A
WIDTH
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
12"
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
SHEET NO.PROJECT REFERENCE NO.
EC-2
SHEET NO.PROJECT REFERENCE NO.
NOT TO SCALE
TEMPORARY ROCK SILT CHECK TYPE ’A’ WITH
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
H = 2’ MIN
1’ MIN
1’ MIN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
NOTES:
BP17.14.R.145
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-317BP.14.R.145
SHEET NO.PROJECT REFERENCE NO.
EC-3A
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
SOIL STABILIZATION SUMMARY SHEET
SIDESTATION
TO
STATION
FROM
LINESHEET NO.
CONST
ESTIMATE (SY)STATION
TO
SIDESTATION
FROM
LINE
SHEET NO.
CONST
ESTIMATE (SY)
MATTING FOR EROSION CONTROL
17BP.14.R.145
4 -L-10+60 11+50 RT 130
130
TOTAL
SAY
MATTING FOR EROSION CONTROL
2,070**
2,200
2,200
MISCELLANEOUS MATTING TO BE INSTALLED AS DIRECTED BY THE ENGINEER
disturbed slopes
**matting for erosion control to be placed on all
BD3
BD1S2
S1
E1
E2
N1
W1 18" CMP1
BD4
BD2N
5
9
2
7’
4
6" EN 6132’09" W131.12’90.19’N 3334’15" WEXISTING R/W
EXISTING R/W
INV=2163.79’
GR
GR
W
G
C
O
N
C
1 S F D
HOUSE
FFE
CELLAR
FFE
CONCCANEY FORK CREEK
CANEY FORK CREEK
EIP
CL2
S
BST
CL1
S
BST
EXISTING R/W
EXISTING R/W
GR/SOI
LHOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
CANEY FORK RD.
.21 MI. +/- TO SR 1737
INV=2165.44’18.00’18.00’# 232 2
DUKE ENERGY
50.00’DUKE ENERGY R/W50.00’
WOODS
WOODS
WOODS
WOODS
CANEY FORK CREEK
POT Sta. 10+00.00
PC Sta. 10+77.29
PT St
a. 11+41.01PC St
a. 12+12.23PCC Sta. 12+63.54
PT Sta. 13+20.84
POT Sta. 14+14.76
PI Sta 11+14.30
D
L = 63.71’
T = 37.00’
R = 50.00’
PI Sta 12+40.40
D
L = 51.31’
T = 28.17’
R = 50.00’
PI Sta 12+92.23
D
L = 57.30’
T = 28.69’
R = 470.00’EXI
STEXIST-L- CURVE DATA0
20202020
2
0
2 0202-L- STA. 12+90.00
END PROJECT
-L- STA. 10+50.00
BEGIN PROJECT
AT-1 9.5’TYPE IIIR=30’TYPE IIISHOP CURVEDR=50’TYPE IIISHOP CURVEDR=10’
R=20’
R=15’
-L- STA. 11+44.01
BEGIN BRIDGE
-L- STA. 12+16.74
END BRIDGE
o9’9’0
1
0
1
0000
01
01
10’
+
9
9.
7
1
R=30’TYPE IIISHOP CURVED
GREU TL-2
GR E U T L-2
GREU TL-2EXIST
10EXIST( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
2:1D
FROM STA. 10+60.00 TO STA. 11+50.00 RT
Min. D= 1.0 Ft.
DETAIL A
Ground
Natural Flatter4:1 or
Slope
Fill
-L- STA. 11+33.30
BEGIN APPROACH SLAB
-L- STA. 12+27.40
END APPROACH SLAB
ABANDON R/W
30.00’ RT.
10+77.29 -L-
30.00’ RT
EX R/W
10+40.00 -L-
30.00’ RT.
11+41.01 -L-
30.00’ RT.
12+12.21 -L-
30.00’ RT.
12+63.54 -L-
30.00’ LT.
12+63.54 -L-
30.00’ LT.
12+12.21 -L-
30.00’ LT.
11+41.01 -L-
30.00’ LT.
10+77.29 -L-
30.00’ LT
EX R/W
10+40.00 -L-
1
1
40.00’ LT.
30.00’ LT.
12+45.00 -L-
30.00’ LT.
EX R/W
13+05.00 -L-
30.00’ RT.
EX R/W
13+05.00 -L-
70.00’ LT.
50.00’ LT.
30.00’ LT.
12+00.00 -L-
70.00’ LT.
30.00’ LT.
11+60.00 -L-
38.00’ RT
30.00’ RT.
11+15.00 -L-
38.00’ RT.
30.00 RT.
11+35.00 -L-
C
C
F
F
F
F
C
C
F
F
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 15 TONS
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 58 TONS
401
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
402
5 SY FF1 TONRIP RAPCLASS B
15" RCP
GTD
MCF
2
1
5
8
2159
2159
21602160216021602160
2160
2160
2160
216121612161
2161
2162
2162
2162 2162216221622163
2163
2163 2163216321632164
2164
2164 21642164216421652165216521652165
2165
2165
2165
216621662166
2166
216721672167
2167
2167
2167
2167
216821682168 21682168216921692169
21702170217021702170
2170
2170
21712171
217121722172
21732
17
3
217421742
17
5 21752175
21762176
21772177
21782178217921802181
DB 992 PG 102
DOUGLAS L. HOOPER
DB 992 PG 102
DOUGLAS L. HOOPER
SHEET NO.PROJECT REFERENCE NO.
17BP.14.R.145 EC-4/CONST. 4
SEE PROJECT SPECIAL PROVISIONS
ENVIRONMENTALLY SENSITIVE AREA
DRAINAGE OUTLETS
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
NOTE:
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBING
-L- STA. 10+50.00
BEGIN PROJECT
-L- STA. 12+90.00
END PROJECTNC GRI
DNAD
8
3 NA
2
0
11
2/13/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Environmental\Erosion Control Design Files\Jackson203_Env_EC-4.dgnUser:cjmartell 0
PLANS
201020 40
GRAPHIC SCALE
DIKE
IMPERVIOUS
B
CLEARING & GRUBBING PHASE
INSTALL DRIVEWAY PIPE DURING
BE INSTALLED DURING CLEARING & GRUBBING PHASE.
NOTE: PERIMETER EROSION CONTROL MEASURES SHALL
AS STILLING BASIN WHERE APPLICABLE
NOTE: UTILIZE SPECIAL STILLING BASIN(S)
Sta. 10+60 to Sta. 11+50
according to Detail A from
Excavate Proposed Ditch
BD3
BD1S2
S1
E1
E2
N1
W1 18" CMP1
BD4
BD2N
5
9
2
7’
4
6" EN 6132’09" W131.12’90.19’N 3334’15" WEXISTING R/W
EXISTING R/W
INV=2163.79’
GR
BL-1
GR
W
G
C
O
N
C
1 S F D
HOUSE
FFE
CELLAR
FFE
CONCCANEY FORK CREEK
CANEY FORK CREEK
ELEV.2202.26’
LOW WIRE
EIP
CL2
S
BST
CL1
S
BST
EXISTING R/W
EXISTING R/W
GR/SOI
LHOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
CANEY FORK RD.
.21 MI. +/- TO SR 1737
BL-2
INV=2165.44’18.00’18.00’# 232 2
DUKE ENERGY
50.00’DUKE ENERGY R/W50.00’
WOODS
WOODS
WOODS
WOODS
CANEY FORK CREEK
POT Sta. 10+00.00
PC Sta. 10+77.29
PT St
a. 11+41.01PC St
a. 12+12.23PCC Sta. 12+63.54
PT Sta. 13+20.84
POT Sta. 14+14.76
EXI
STEXIST020202020
2
0
2 0202-L- STA. 12+90.00
END PROJECT
-L- STA. 10+50.00
BEGIN PROJECT
AT-1 9.5’TYPE IIIR=30’TYPE IIISHOP CURVEDR=50’TYPE IIISHOP CURVEDR=10’
R=20’
R=15’
-L- STA. 11+44.01
BEGIN BRIDGE
-L- STA. 12+16.74
END BRIDGE
o9’9’0
1
0
1
0000
01
01
10’
+
9
9.
7
1
R=30’TYPE IIISHOP CURVED
GREU TL-2
GR E U T L-2
GREU TL-2EXIST
10EXIST( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
2:1D
FROM STA. 10+60.00 TO STA. 11+50.00 RT
Min. D= 1.0 Ft.
DETAIL A
Ground
Natural Flatter4:1 or
Slope
Fill
-L- STA. 11+33.30
BEGIN APPROACH SLAB
-L- STA. 12+27.40
END APPROACH SLAB
ABANDON R/W
30.00’ RT.
10+77.29 -L-
30.00’ RT
EX R/W
10+40.00 -L-
30.00’ RT.
11+41.01 -L-
30.00’ RT.
12+12.21 -L-
30.00’ RT.
12+63.54 -L-
30.00’ LT.
12+63.54 -L-
30.00’ LT.
12+12.21 -L-
30.00’ LT.
11+41.01 -L-
30.00’ LT.
10+77.29 -L-
30.00’ LT
EX R/W
10+40.00 -L-
1
1
40.00’ LT.
30.00’ LT.
12+45.00 -L-
30.00’ LT.
EX R/W
13+05.00 -L-
30.00’ RT.
EX R/W
13+05.00 -L-
70.00’ LT.
50.00’ LT.
30.00’ LT.
12+00.00 -L-
70.00’ LT.
30.00’ LT.
11+60.00 -L-
38.00’ RT
30.00’ RT.
11+15.00 -L-
38.00’ RT.
30.00 RT.
11+35.00 -L-
C
C
F
F
F
F
C
C
F
F
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
EST. 10 CY
ELEV. 2162.3
EXCAVATE TO
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 15 TONS
(STRUCTURAL PAY ITEM)
CLASS II RIP RAP
EST. 58 TONS
SEE DETAIL A
SPECIAL LATERAL ’V’ DITCH
5 SY FF1 TONRIP RAPCLASS B
15" RCP
GTD
MCF
DB 992 PG 102
DOUGLAS L. HOOPER
DB 992 PG 102
DOUGLAS L. HOOPER
SHEET NO.PROJECT REFERENCE NO.
17BP.14.R.145
-L- STA. 12+90.00
END PROJECT
-L- STA. 10+50.00
BEGIN PROJECT
BASIN WHERE APPLICABLE.
6.) UTILIZE SPECIAL STILLING BASIN(S) AS STILLING
DRAIN OUTLET.
5.) INSTALL ENERGY DISSIPATOR AT TEMPORARY SLOPE
FIELD.
REQUIRED. LOCATION TO BE DETERMINED IN
4.) ONSITE CONCRETE WASHOUT STRUCTURE IS
ENGINEER.
NEED TO BE INSTALLED AS DIRECTED BY THE
3.) ADDITIONAL EROSION CONTROL DEVICES MAY
REQUIRE PRIOR APPROVAL BY ENGINEER.
2.) ANY DEVIATION FROM OPTIONS GIVEN WILL
STABALIZE THE STREAM BANKS (350 SQ YD)
NOTES: 1.) COIR FIBER MATTING SHALL BE USED TO
EC-5/CONST. 4
NC GRI
DNAD
8
3 NA
2
0
11
2/13/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Environmental\Erosion Control Design Files\Jackson203_Env_EC-5.dgnUser:cjmartell 0
PLANS
201020 40
GRAPHIC SCALE
B
on Slopes as Work Allows.
Place Matting for Erosion Control
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
HEALING IN DIBBLE PLANTING METHOD
firming soil at top.
5. Push handle forward
PLANTING NOTES:
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
protected area.
1. Locate a healing-in site in a shady, well
the root collar is at ground level.
against the sloping end so that
4. Place a single layer of plants
as necessary and water thoroughly.
6. Repeat layers of plants and sawdust
correct depth.
and place seedling at
2. Remove planting bar
USING THE KBC PLANTING BAR
SEEDLING / LINER BAREROOT PLANTING DETAIL
PLANTING DETAILS
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
toward planter.
as shown and pull handle
1. Insert planting bar
root systems from drying.
container to prevent the
canvas bag or similar
shall be kept in a moist
During planting, seedlings
PLANTING BAG
soil at bottom.
toward planter, firming
4. Pull handle of bar
thoroughly.
hole open. Water
6. Leave compaction
RF-1
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
25% BETULA NIGRA
25% FRAXINUS PENNSYLVANICA
25% PLATANUS OCCIDENTALIS
25% LIRIODENDRON TULIPIFERA
RIVER BIRCH
GREEN ASH
SYCAMORE
TULIP POPLAR
12 inches deep and provide drainage.
2. Excavate a flat bottom trench
a sloping angle.
sawdust over the roots maintaining
5. Place a 2 inch layer of well rotted
at one end of the trench.
well rotted sawdust at a sloping angle
rotted sawdust. Place a 2 inch layer of
3. Backfill the trench with 2 inches well
2 inch
from seedling.
2 inches toward planter
3. Insert planting bar
1 inch thick at center.
4 inches wide and
be 12 inches long,
cross section, and shall
blade with a triangular
Planting bar shall have a
KBC PLANTING BAR
root collar.
10 inches below the
no roots extend more than
pruned, if necessary, so that
All seedlings shall be root
ROOT PRUNING
REFORESTATION
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
REFORESTATION
REFORESTATION DETAIL SHEET
17BP.14.R.145
SHEET NO.PROJECT REFERENCE NO.
RF-2
SEE PLAN SHEETS FOR AREAS TO BE PLANTED
DIBBLE PLANTING METHOD
firming soil at top.
5. Push handle forward
PLANTING NOTES:
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
correct depth.
and place seedling at
2. Remove planting bar
USING THE KBC PLANTING BAR
PLANTING DETAILS
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
toward planter.
as shown and pull handle
1. Insert planting bar
root systems from drying.
container to prevent the
canvas bag or similar
shall be kept in a moist
During planting, seedlings
PLANTING BAG
soil at bottom.
toward planter, firming
4. Pull handle of bar
thoroughly.
hole open. Water
6. Leave compaction
PAID FOR AS "STREAMBANK REFORESTATION"
NOTE: TYPE 1 AND TYPE 2 STREAMBANK REFORESTATION SHALL BE
STREAMBANK REFORESTATION
TYPE 1
50% CORNUS AMOMUM
50% SALIX NIGRA
SILKY DOGWOOD
BLACK WILLOW
TYPE 2
TYPE II
TYPE I
FT.
STREAM
STREAMBANK REFORESTATION TYPICAL
8 FT.
4
from seedling.
2 inches toward planter
3. Insert planting bar
1 inch thick at center.
4 inches wide and
be 12 inches long,
cross section, and shall
blade with a triangular
Planting bar shall have a
KBC PLANTING BAR
root collar.
10 inches below the
no roots extend more than
pruned, if necessary, so that
All seedlings shall be root
ROOT PRUNING
2 inch
25% BETULA NIGRA
25% PRUNUS SEROTINA
25% PLATANUS OCCIDENTALIS
25% LIRIODENDRON TULIPIFERA
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
RIVER BIRCH
BLACK CHERRY
SYCAMORE
TULIP POPLAR
BAREROOT PLANTING DETAILLIVE STAKES PLANTING DETAIL
BUDS (FACING UPWARD)
ANGLE CUT 30-45
SQUARE CUT
GROUND
EXISTING/PROPOSED
LIVE STAKES
BANK STABILIZATION WITH LIVE STAKES
LIVE STAKE
COIR FIBER MAT
(1/2"-2" DIAMETER)
LIVE CUTTING
2 - 3 Feet
2 ft - 3 ft LIVE STAKES
2 ft - 3 ft LIVE STAKES
STREAMBED
EXISTING/PROPOSED
DETAIL SHEET 1 OF 2
STREAMBANK REFORESTATION
APPROXIMATELY 2724 PLANTS PER ACRE.
ON CENTER, RANDOM SPACING, AVERAGING 4 FT. ON CENTER,
TYPE 1 STREAMBANK REFORESTATION SHALL BE PLANTED 3 FT. TO 5 FT.
APPROXIMATELY 680 PLANTS PER ACRE.
ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER,
TYPE 2 STREAMBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT.
OF LIVE STAKE IS WITHIN GROUND
LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY 3/4
ON CENTER
LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET
NOTE:
Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
704 357 0488
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3509
Charlotte, NC Boone, NC
828 355 9933
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
17BP.14.R.145
SHEET NO.PROJECT REFERENCE NO.
RF-3
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
DETAIL SHEET 2 OF 2
STREAMBANK REFORESTATION
REINFORCEMENT BAR
#10 STEEL
12"
1"
24"
4"
1"
STAPLE
1" (nominal)
DIAMETER BEND
4"
WOODEN STAKE
2" x 2" (nominal)
BACKFILLMATTING
COIR FIBER
GROUND
EXISTING
FLOODPLAIN/
TO NWSEL
EXTEND MATTING
OF FLOW
DIRECTION
IN TRENCH
MATTING
AND BACKFILLED
PLACED IN TRENCH
MATTING SHALL BE
COIR FIBER MATTING DETAIL
ANCHOR OPTIONS
PLAN VIEW
TYPICAL CROSS SECTION
NOT TO SCALE
STREAM BED
{
ON 1’ CENTERS
ANCHOR TRENCH
ON 1’ CENTERS
ANCHOR OVERLAP
3’ CENTERS
ANCHORS ON
6" OVERLAY(MIN)
(TYP)
18"
3’ CENTERS
ANCHORS ON
6" MIN
IN TRENCH
1’ CENTERS
ANCHORS ON
12-24"
1-2"
1-2"
1’ CENTERS
ANCHORS ON
1’ CENTERS
ANCHORS ON
1’ CENTERS
ANCHORS ON
Asheville,
North Carolina
423 467 8401
865 546 5800
864 574 4775
828 253 2796
704 357 0488
606 248 6600
Tri-Cities, TN
Knoxville, TN
Spartanburg, SC
Middlesboro, KY
Charleston, SC
843 974 5650
Atlanta, GA
770 627 3509
Charlotte, NC Boone, NC
828 355 9933
cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved
Consulting Engineers
17BP.14.R.145
18" CMPEXISTING R/W
EXISTING R/W
INV=2163.79’
GR
GR
W
G
C
ON
C
1 S F D
CONCCANEY FORK CREEK
CANEY FORK CREEK
BST
BST
EXISTING R/W
EXISTING R/W
GR/SOI
LHOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
CANEY FORK RD.
.21 MI. +/- TO SR 1737
INV=2165.44’18.00’18.00’50.00’DUKE ENERGY R/W50.00’
WOODS
WOODS
WOODS
CANEY FORK CREEK
10
CONTRACT:TIP PROJECT: 17BP.14.R.145DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA SHEET NO.
UO-1
XX
DEPART
ME
NT
OF TRANSPORTATION STATE OF NORTH CARO
LI
NABY:
PREPARED
PLANS
0
GRAPHIC SCALES
PLANS
UTILITY OWNERS ON PROJECT
INDEX OF SHEETS
UTILITIES BY OTHERS
PREPARED FOR THE OFFICE OF:
FAX (919) 250-4119
PHONE (919) 250-4128
RALEIGH NC 27699-1591
1591 MAIL SERVICES CENTER
DIVISION OF HIGHWAYS
SECTION
UTILITIES ENGINEERING
Lynn Mann, P.G.
UO-2 UTILITIES BY OTHERS PLAN SHEET
UO-1 TITLE SHEET
SHEET NO. DESCRIPTION
Consulting Engineers Asheville, NC 28806
828 253 2796
1318-F Patton Ave.
20 Scale
30 601530
PROJECT REFERNCE NO.
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TRANSPORTATION\31631-02\UTILITIES\UO-1.DGNV&M PROJECT #31631-02JACKSON COUNTY
17BP.14.R.145
TO END
TO SR 1737
ON SR 1738 (HOOPER CEMETERY ROAD)
LOCATION: BRIDGE NO. 203 OVER CANEY FORK CREEK
TYPE OF WORK: AERIAL POWER & TELEPHONE
VICINITY MAP
LOCATION
PROJECTHooperCemeteryRd.MosesCreekJohnsCreek Rd.
.62East Laport
dR
H HFMoses
Creek
Church
Stephenson
Cemetery
Hooper
Cemetery
Z
Hooper
Knob
Shelton Mountain
Alum
3719summit
NC GRID
NAD 83 NA 2011
Robert Golding DIVISION 14 UTILITY COORDINATOR
UTILITIES PROJECT COORDINATOR
(2) TELEPHONE - FRONTIER COMM.
(1) POWER - DUKE ENERGY4/20/17-L- STA. 12+90.00
END PROJECT 17BP.14.R.145
-L- STA. 10+50.00
BEGIN PROJECT 17BP.14.R.145 NC GRI
DNAD
8
3 NA
2
0
11
-L- STA 12+16.67
END BRIDGE
-L- STA 11+43.95
BEGIN BRIDGE
1735
1735
1736
1738
1737
1737
1740
CANEY FORK CREEK CANEY FORK CREEK
CANEY FORK CREEK
50.00’
1 S F D
GR/SOI
LDB 1126 PG 413
EDDIE SWEET
DB 992 PG 102
DB 2103 PG 72
JEFF STAPLES
DOUGLAS L. HOOPER
G
GR
GR
BST
BST
W
18" CMPCONCC
O
N
C
18.00’EXISTING R/W
EXISTING R/W
.36 MI. +/- TO END
WOODS
WOODS
EXISTING R/W
EXISTING R/W18.00’DUKE ENERGY R/WHOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
HOOPER CEMETERY RD.
SR 1738 16’ GRAVEL
CANEY FORK RD.
.21 MI. +/- TO SR 1737 DB 992 PG 102
DOUGLAS L. HOOPER
C
C
F
F
F
F
C
C
F
F
F
10111213 141516# 232 2
DUKE ENERGY
# 10C6
DUKE ENERGYPROJECT:2/16/1817BP.14.R.145CONTRACT:V&M PROJECT #31631-02TRANSPORTATION\31631-02\UTILITIES\JACKSON 203_UO-2.DGNC203325SHEET NO.
UTILITIES BY OTHERS
UO-2
PROJECT REFERENCE NO.
17BP.14.R.14560 Scale30 Scale
NC GRI
DNAD
8
3 NA
2
0
11
BE DONE BY OTHERS
SHOWN ON THIS SHEET WILL
ALL PROPOSED UTILITY WORK
NOTE:
JACKSON COUNTY
STRUCTURE #490203
-L- STA. 12+90.00
END PROJECT
-L- STA. 12+16.67
END BRIDGE
-L- STA. 11+43.95
BEGIN BRIDGE
-L- STA. 10+50.00
BEGIN PROJECT
Middlesboro,
Kentucky
Tri-Cities,
Tennessee
All Rights Reserved
Charlotte,
North Carolina
Tennessee
Knoxville,
South Carolina
Spartanburg,
Asheville,
North Carolina
Copyright 2006 Vaughn & Melton, Inc.c
704 357 0488
423 467 8401
865 546 5800
606 248 6600
864 574 4775
828 253 2796
Consulting Engineers
1
1
SHEET NO.PROJECT REFERENCE NO.
17BP.14.R.145
IN CUBIC YARDS
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
COMPUTED BY:
CHECKED BY:DATE:
DATE:
CROSS SECTION SUMMARY
EXCAVATION
UNCLASSIFIED
EMBT
15
20
0 0
10
26
0
12+16.67 (END BRIDGE)0
5
NOTE: EMBANKMENT COLUMN DOES NOT INCLUDE BACKFILL FOR UNDERCUT.
0
-L-
STATION
10+50.00
10+75.00
11+00.00
11+25.00
12+25.00
SHEET NO.PROJECT REFERENCE NO.
1
3
42
5411+43.95 (BEGIN BRIDGE)
612+50.00
12+75.00 11 5
X-1A
3
AMF 03/16/2017
12+90.00 4 1
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
2/15/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Xsc\Jackson203_rdy_xpl_L.dgnUser:jddaves8/23/99PROJ. REFERENCE NO.SHEET NO.0
2160 2160
2165 2165
2170 2170
2155 2155
10+00.00
2160 2160
2165 2165
2170 2170
2175 2175
10+25.00
2160 2160
2165 2165
2170 2170
2175 2175
2180 2180
2155 2155
10+50.00
2160 2160
2165 2165
2170 2170
2175 2175
2180 2180
10+75.00
X-1
-L-
2.5 5
17BP.14.R.145
-L- STA. 10+50.00
BEGIN PROJECT 17BP.14.R.145
JACKSON 203
2166.79
2167.33
2167.90
0.011 0.0032167.912168.59
0.020 0.020
2167.754:12:1 S.S. 2170.082168.54S.S. 2167.31
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
2/15/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Xsc\Jackson203_rdy_xpl_L.dgnUser:jddaves8/23/99PROJ. REFERENCE NO.SHEET NO.0
2160 2160
2165 2165
2170 2170
2175 2175
2180 2180
2155 2155
11+00.00
2160 2160
2165 2165
2170 2170
2175 2175
2180 2180
2155 215511+25.00
2160 2160
2165 2165
2170 2170
2175 2175
11+50.00
2160 2160
2165 2165
2170 2170
2175 2175
11+75.00
X-2
-L-
2.5 5
17BP.14.R.145
JACKSON 203
BEGIN BRIDGE -L- STA. 11+43.95
2169.25
0.010 0.010
6:1
S.S. 2167.90
DRIVEWAY2169.082168.60
0.015 0.015
2:1
S.S. 2159.60
2166.414:1S.S. 2170.21
2:12169.152161.91
0.020 0.020
5
:1
S.S. 2165.712168.812159.44
0.020 0.0202168.43
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
2/15/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Xsc\Jackson203_rdy_xpl_L.dgnUser:jddaves8/23/99PROJ. REFERENCE NO.SHEET NO.0
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
12+00.00
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
12+25.00
2160 2160
2165 2165
2170 2170
2175 2175
12+50.00
2160 2160
2165 2165
2170 2170
2175 2175
12+75.00
X-3
-L-
2.5 5
17BP.14.R.145
-L- STA. 12+90.00
END PROJECT 17BP.14.R.145
JACKSON 203
END BRIDGE -L- STA. 12+16.67
0.020 0.0202168.042166.89
0.020 0.0202167.66S.S. 2167.60
2167.12
0.020 0.020
S.S. 2165.742167.284:1S.S. 2167.24
4:1
2167.00
0.018 0.0202167.04S.S. 2165.95
6
:14:1
S.S. 2166.97
00
00
55
55
1010
1010
1515
1515
2020
2020
2525
2525
3030
3030
3535
3535
4040
4040
4545
4545
5050
5050
5555
5555
6060
6060
6565
6565
7070
7070
7575
7575
2/15/2018V:\Asheville\transportation\31631-02 Jackson 203 - 17BP.14.R.145\Roadway\Xsc\Jackson203_rdy_xpl_L.dgnUser:jddaves8/23/99PROJ. REFERENCE NO.SHEET NO.0
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
13+00.00
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
2160 2160
2165 2165
2170 2170
2175 2175
2155 2155
-L-
2.5 5
X-417BP.14.R.145
JACKSON 203
2167.00