Loading...
HomeMy WebLinkAboutNC0069841_authorization to construct_19960430State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director April 30, 1996 Mr. Mike Shalati Union County Public Works Department P.O. Box 987 Monroe, North Carolina 28111 A ; �EHNF=1 Subject: Authorization to Construct Modification Permit No. NC0069841 Union County - Crooked Creek WWTP #2 Union County Dear Mr. Shalati: On April 28, 1995, the Division issued a revised Authorization to Construct to expand the subject wastewater treatment facility to 1.3 MGD. On September 25, 1995, the Division issued a permitted flow increase to 1.9 MGD. Based on that permitted flow increase, the Authorization to Construct letter of April 28, 1995 is modified as follows (changes are in bold): • Expansion of two (2) existing oxidation ditches from 975,000 gallons (total) to 1.760.000 gallons (total); • Two (2) new 38-foot diameter clarifiers; • Two (2) new chlorine contact basins for a total of three (3), for a total capacity of 40,500 gallons; • A new sulfur dioxide injection box and feed system; • A new sample box; • Four (4) new 120 square foot tertiary sand filter cells, for a total of six (6) cells; • One (1) 45-foot diameter aerobic digester with one (1) 30 HP floating aerator; • Two (2) 76-foot diameter aerobic digesters/thickeners each with (1) 75 HP floating aerator; • One (1) 76-foot diameter sludge holding tank with one (1) 75 HP floating aerator; • A new sludge transfer station with two (2'200 GPM sludge transfer pumps; • A raw sewage wetwell pump station with two (2) 700 GPM influent pumps; • Replacement of an existing return sludge pump with one (1) 635 GPM pump; • Two (2) 1440 GPM filter backwash pumps; • A 600 kW standby power generation system; • A 1.9 MGD effluent pumping station with three 2000 gpm vertical turbine pumps. • 17,970 linear feet of either sixteen (16) inch or twenty-one (21) inch diameter ductile iron effluent forcemain pipe. and all associated valves, gauges, controls, and appurtenances with discharge into North Fork Crooked Creek in the Yadkin Pee -Dee River Basin. Upon completion of plant modifications and outfall relocation, the facility is authorized to discharge 1.9 MGD. This Authorization to Construct is issued in accordance with Part I11, Paragraph C ui \ l'LA::, Permit No. NC0069841 issued September 25, 1995, and shall be subject to revocation unless the P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper Permit No. NC0069841 Authorization to Construct Union County April 30, 1996 Page 2 wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0069841. The sludge generated from this treatment facility must be disposed of in accordance with G.S. 143- 215.1 and in a manner approved by the North Carolina Division of Environmental Management. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8A, .0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions of Title 15A, Chapter 8A, .0202. A copy of the approved plans and specifications shall be maintained on file by the Permittec for the life of the facility. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143- 215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Environmental Management in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions, please contact Militerewisiizicirt telephone number 919/733-5083, extension 541. Sincerely, Preston Howard, Jr., P.E. cc: Union County Health Department Construction Grants, John R. Blowe Mooresville Regional Office, Water Quality Training and Certification Unit Central Files HDR Engineering, Inc., Eric Williams NPDES Files