Loading...
HomeMy WebLinkAboutNC0004375_staff coments_20141016Berry, Ron Subject: Clariant WWTP Start Date: Thursday, October 16, 2014 Due Date: Thursday, October 16, 2014 Status: Not Started Percent Complete: 0% Total Work: Actual Work: Owner: 0 hours 0 hours Berry, Ron Categories: Renewal Permit: NC0004375 10/16/14: Received email from consultant inquiring about availability to discuss Clariant WWTP renewal on Oct 17 (tomorrow). Send reply: RE: Clariant Permit Discussio... 10/17/14: Received pc from consultant wants to maintain industrial based permit, primary contaminated sw and gw, has one current industrial source. Average flow is less than 0.4 MGD, wants to reduce daily monitoring, current permitted flow = 3.9 MGD. Discussed monitoring requirements at different grades. Grade II looks like 0.5 MGD would be applicable and justifiable, suggested applying for this in renewal. Discussed second tier for future growth, not sure we can but can certainly ask for this. In past cases inability to characterize the waste resulted in not granting extra tier. Need to provide data associated with waste to assist with permit renewal. 1/13/15: Wren delivered renewal app to my desk. 1/22/15: Sonya requested and I provide all app docs so she could add to NPDES File. Told Sonya do not know if BIMS was updated or receipt ack let sent. 2/20/15: Wes called to discuss issues with this facility, Wes to include additional recommendation in inspection report he is now preparing. Permittee is wanting confirmation we had received app, checked file we had original ack let dated Jan 26,2015. Wes provide permittee email address and I sent email to permittee with copy of ack letter attached. 7/9/15: Permittee called, wanted update on renewal status. Explained permit on backlog and is part of a current review of the shared nutrients condition that is being developed for the facility using the same nutrients (Belmont, Charlotte Utility). Unable to give tentative date. Reviewed recent history of pipe repairs. 1