CERTIFIED MAIL 7018 1830 0001 8037 2070 - RETURN RECEIPT REQUESTED
Mr. Ken Deaver
Etowah Sewer Company
2905 Wood Rd
Mooresboro, NC 28114-0063
Subject: Pending Imposition of Sewer Line Moratorium
Demonstration of Future Wastewater Treatment Capacities
NPDES Permit NC0071323
Etowah Sewer Company
Henderson County
Dear Permittee:
15A NCAC 02T .0118, "Demonstration of Future Wastewater Treatment Capacities," was adopted by
the Environmental Management Commission to ensure that wastewater treatment systems owned or
operated by municipalities, counties, sanitary districts or public utilities do not exceed their hydraulic
treatment capacities. This Rule specifies that no permits for sewer line extensions will be issued by the
Division of Water Resources to facilities exceeding 80% of their hydraulic treatment capacity unless
specific evaluations of future wastewater treatment needs have been completed.
A review of your self -monitoring reports has indicated flow at the subject facility exceeded 75% for
calendar year 2020. The average flow calculated for this period was 0.977 MGD and represented
78.19% of the current treatment capacity. Although the 80% threshold has not yet been exceeded, the
Division is providing early notification so that the permittee may undertake actions to maintain
compliance with 15A NCAC 02T .0118.
Notification of 80% Hydraulic Treatment Capacity Requirements
In order to attain compliance with the Rule, prior to exceeding 80% of the hydraulic treatment capacity,
you must submit an approvable engineering evaluation of future wastewater treatment needs. This
evaluation must outline specific plans for system expansion and include the sources of funding for the
expansion. If future expansion is not proposed, a detailed justification must be made based on past
growth records and future growth projections and, as appropriate, shall include conservation plans or
other specific measures to achieve waste flow reductions.
If the above requirements are not met prior to exceeding 80% hydraulic treatment capacity, we will be
unable to approve any further sewer line extensions for this facility until such time as you have complied
£ D_E
NORTH CAROLINA
Department of Environmental Quality
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: 1 E4E52C9-1AD9-4BE2-AB7B-30512D0BADF3
with the requirements contained in the Rule. To prevent delays in the processing of your future permit
applications for sewer line extensions, please submit a plan of action containing the information
necessary to comply with the appropriate demonstrations as described above to the following address:
NC DEQ-DWR-NPDES
Compliance & Expedited Permitting Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Provision For Sewer Line Approvals While On Moratorium
Per the terms of NCAC 02T .0118 (3), the Director may, on a case by case basis, allow permits to be
issued to facilities exceeding the 80 percent loading rate if: 1) the additional flow will not cause the
facility to exceed its permitted hydraulic capacity, 2) the facility is in compliance with all other permit
limitations and requirements and 3) it is demonstrated that adequate progress is being made in
developing the required engineering evaluations or plans and specifications. If you wish to obtain sewer
extension permits while under moratorium per this provision of the rule, please send all required
information in support of your request to the Asheville Regional Office.
Any plans and specifications for expansion should be submitted to the Division of Water Resources.
We look forward to working with you on development of plans to meet your future wastewater
treatment needs. If you have any questions regarding this matter, please contact Daniel Boss of our
Asheville Regional Office (daniel.boss@ncdenr.gov), or Charles H. Weaver of the Compliance &
Expedited Permitting Unit at 919-707-3616 (email: Charles.weaver@ncdenr.gov).
Sincerely,
DocuSigned by:
8328B44CE9EB4A1...
S. Daniel Smith, Director
Division of Water Resources
Attachment (15A NCAC 02T .0118)
cc: Laserfiche
Asheville Regional Office
Municipal Permitting Unit
DocuSign Envelope ID: 1 E4E52C9-1AD9-4BE2-AB7B-30512D0BADF3
15A NCAC 02T .0118 DEMONSTRATION OF FUTURE WASTEWATER TREATMENT CAPACITIES
In order to insure that treatment, utilization, or disposal systems do not exceed their hydraulic treatment
capacities, no permits for sewer line extensions shall be issued to wastewater treatment systems owned or
operated by municipalities, counties, sanitary districts or public utilities unless they meet the following
requirements:
1) Prior to exceeding 80 percent of the wastewater treatment system's permitted hydraulic capacity
(based on the average flow of the last calendar year), the permittee must submit an approvable
engineering evaluation of their future wastewater treatment, utilization, and disposal needs. This
evaluation must outline specific plans for meeting future wastewater treatment, utilization, or disposal
needs by either expansion of the existing system, elimination or reduction of extraneous flows, or
water conservation and must include the source(s) of funding for the improvements. If expansion is
not proposed or is proposed for a later date, a detailed justification must be made to the satisfaction of
the Director that wastewater treatment needs will be met based on past growth records and future
growth projections and, as appropriate, shall include conservation plans or other specific measures to
achieve waste flow reductions.
2) Prior to exceeding 90 percent of the wastewater treatment, utilization, or disposal systems permitted
hydraulic capacity, (based on the last calendar year), the permittee must obtain all permits needed for
the expansion of the wastewater treatment, utilization, or disposal system and, if construction is
needed, submit approvable final plans and specifications for expansion including a construction
schedule. If expansion is not proposed or is proposed for a later date, a detailed justification must be
made to the satisfaction of the Director that wastewater treatment needs will be met based on past
growth records and future growth projections and, as appropriate, shall include conservation plans or
other specific measures to achieve waste flow reductions.
3) The Director shall allow permits to be issued to facilities that are exceeding the 80 percent or 90
percent loading rates if the additional flow is not projected to result in the facility exceeding its
permitted hydraulic capacity, the facility is in compliance with all other permit limitations and
requirements, and it is demonstrated to the satisfaction of the Director that adequate progress is being
made in developing the needed engineering evaluations or plans and specifications. In determining
the adequacy of the progress, the Director shall consider the projected flows, the complexity and
scope of the work to be completed and any projected environmental impacts.
History Note: Authority G.S. 143-215.3;
Eff. September 1, 2006.