HomeMy WebLinkAboutSW4210501_Plansheet - SCM Detail_20210714CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION, 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE, 5, REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. 15" HOPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 2 3' MIN APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 22'1 HOPE 0 2,27% SILT FENCE AS NEEDED 4' MIN EMBANKMENT WIDTH 6' TOPSOIL FOR AL AREAS ABOVE TH NORMAL POND LLEVATIO 0 TRASH RACK REFER TO DETAIL THIS SHEET 6' TOPSOIL ABOVE 61 CLAY LINER ! '- ON LITTORAL SHELF 6' CLAY SOIL LINER ON INSIDE I I 3 FACE OF EMBANKMENT `1 6FT LITTORAL I I 1 INV=657.0 / 1 ELEV=655.0 ----� 1 4` MIN' ASTM C-923 SEAL KEY BETWEEN BARREL A RISER. RISER BASE TO BE FILLED WITH CONC, TO INVERT OF BARREL. 8"XrX1'X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE, PROVIDE 2-3/4" A347 BOLTS FROM ANGLE TO RISER AND T 2-A307 -J' HOOKS 3/4- DIA. X 12" LONG FROM ANGLE TO BASE, ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. 'J' HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. FILTER MEDIA (SEE NOTE 2) FLQw - 1_ I I irk f PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALT. MEET OR EXCEED THE PROYISIONS OF THE CLEAN WATER ACT, ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. FILTER MEDIA MAY BE, Mg NOT LIMITED 10, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES, PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. BMP POND DEWATERING SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO SX INCHES DEEP. J. REMOVE ALL LOOSE ROCK, R0015 AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY.5MOOTR AND UNIFORM. 4. APPLY AGRICULTURAL UWE. FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY RLPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN I DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 9. CONSULT S&EC ENVIRONMENTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. . LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN UUMPLIANCE WITH THE NCDEQ 3%AP REOUI!?U ITS - LANDSCAPE CONTRACTOR SHALL PROVIDE A 1'6U-YEAR IVARRANIY FCR EMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF T6E FIRST YEAR AND AT IHE 6ND OF THE TWO-YEAR I PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PRCCEWRES, SUCH AS CONTROL 4F INVASIVE 1'MES. ANIMAL AND',MDAL DAMAGE, MULCHING, RE-STAK.INC, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SFV+LL BE IMPLEMENTED TO THE EXTEND NEEDED TO INSURE PLANT SURVIVAL STAKING MUST BE RE,MUVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MDyTHS), TO PREVENT GIRDLING (STRANGLING} OF ALL W60UY PLANTS, SOD WITHIN BMP AND SURROUNOINC AREAS TO BE BERMUDA DR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED musr BE APPLIED AT THE RATES SPECIFIED BY THE SUPPOERS, IF PLANT ESTAE'LISHMENT CANNOT BE ACHIEVED WITH SEECING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STGRMWATER FACILITY PORT€QNI OF THE PRDJLCT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PIANTS, OR OTHER MFAKJS TQ COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE 'WATER IS ALLOWED T4 ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACOUIR-D FROM AN APPROI'EO NCDEQ PLANT VEINDOI, PLANT VMTER;AL SHOULD BE PURCHASED FRCM A LDI SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: Cli 'DE NATIVE PLANT NURSERY 3T3 662-5568 CROWING WILD NURSERY 916-259-6351 NC FOREST SERVICE 919-73I-7988 - PLANT DELIGHTS NURSERY 919-772 4791 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED, III ;E PLANTS Oil THE VEGETATED) SHELF AND PERIMETER OF THE BASIN SHOULO BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD RE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS DN THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONVII11TY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND oDTNNED FROM A WELL DRAINED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUMANCES 1' OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BE A HINDFRANCE TO PLANTING OPERATIONS. TOPSOIL SHALL CONTAIN AT LEAST 4-11% ORGANIC MATTER BY WEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) TRIRTY (30) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR (b) THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BMP PLANITNG MATERIALS DURING THE TWO-YEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT OO NOT SURVIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR 10 VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPI:, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO I3E SUDDED. 7. NO PLANT SUBSTITUTIONS ARE PERMITTED WITHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATIVE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED 501L AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP IS" OF EXISIING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES, 1 ADJUST TREE PLANTING LOCATIONS TO AVOID UNDERGROUND UTILITIES, PLANT 15' FROM ALL UNDERGROUND UTILITIES (SEWER AND STORM DRAINAGE, GAS„ WATER, PHONE, AND ELECTRICAL LINES.) STGRMWATER MANAGEMENT SYSTEM DETAILS i NOT TO SCALE LOW POINT •,A'• :';,a:: ; '! ; :fly •�� III •A L f ,.0 . , 1 LEVEL TOP OF EMBANKMENT ELEVATION=659.5 NOTE: 1.0' STORM ELEVATION IS 657.36 AND INTERMEDIATE ]NECESSARY) ETAIL WEIR IS ELEVATION 658.6. THERE IS ADDITIONAL STORAGE ENTAL 100 YEAR STORM ELEVATION=659 29 DESIGNED FROM THE 1.0" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. ST RISER EPS 2 YEAR STORM ELEVATION=658.67 ARY) N f YEAR STORK! ELEYATION=658.61 1.0-ENCH STORM ELEVATION=657.36 EXISTING GRADE=657.5d: NORMAL POND ELEVATION=657.0 ELBOW DETAIL 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 THE POND WHEN NECESSARY, REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. Mi- I jI -If_ _ BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=651,0 `- CONCRETE SHALL BE ICI j I f PLACED IN RISER AFTER ANGLES ARE SECURED III�(BOTTOM OF SEDIMENT STORAGE)=650.0�I` TO BASE AND RISER, �`� -� I , � 'I Ij 6" CLAY SOIL 5 x5'x1.5' CONC. RASE REINFORCE WITH J4 BARS AT 12" O.C. TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3' MIN. CLEARANCE MAIN Pfirn BETWEEN EDGE OF CONE. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SiN.T.S. RISE rpp r9F �7R � �9 p �rorE�� �1 rF WF�R �6 2 1� r� "" T4UCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR SCALE: N.T,S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM 6' TOPSOIL ABOVE . 6" CLAY LINER 3:1 ON LITTORAL SHELF i- 6FT LITSHELF 6:1 NOTES: I. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2, TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL TRASH RACK ION CORROSIVE MATERIAL 0 5.5" SPACING /� \\ 5.5" 5.5" 1 I I I 5.5" I I ND E: RISER TRASH RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL ` _OV 1 659 -»- • -- :i... F,: � • v .. RIP -RAN APRON s: �r 65 AREA N� T FOREBAY WEIR Cfy+ C q a / Qr�OaaU � aTOP r9 o ° �' i OF EMBANKMENT o as oC LA a[I rn 2 ELEV-6S9.5 SOD AREAS ABOVE o NORMAL POOL of p Lc)!I a Up ELEVATION ITTORAL SHELF / 0 a�1 D CO� � a AREA=1,120 SF REFER TO DETAIL .FOR PLANTINGS 662 a 1 / G a^^,0 0 - / 0 0 0 ? UTLET CONTROL / / a v� 0 f 0 0 0 0 fI STRUCTURE REFER TO DETAILS / r o 0 0 O C) 0 0 )00400 t] THIS SHEET / r, MAIN PON------- 0U / / AREA Z _,----- �1�� 15" OUTLET PIPE - - �� ou OU-, _ REFER TO GRADING-- `�`'-� oU"� - 011 ~` PLAN -_-_� - oU--, GRAPHIC SCALE 20 0 10 20 40 60 . PLAN VIEW 1 INCH = 20 FEET 7.0' GRASS FOREBAY WEIR AT ELEV=656.5 FOREBAY TOP ELEV= 658.2 WIDTH AT TOP = 2.3 FT i I rl uic�a crarrrTnar 4' PVC SCREW CAP FOR CLEANING ACCESS I I 12' MIN. 4"X4' PVC I PERM POND ELEV.=657.0. I II 12" MIN. II II I 0,75"DIA. HOLE DRILLED I INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN SEDIMENT STORAGE TOP THE FOREBAY WHEN NECESSARY. REFER TO DETAIL FORESAY BOTTOM THIS SHEET FOR DEWATERING REQUIREMENTS. ELEV=654.0 3� NORMAL POND ELEVATION BOTTOM LITTORAL SHELF ELEV. �� I' 6" TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE J�I I I I I DEEPER THAN FOREBAY EXIT AREAS ABOVE THENORMAL POND ELEVATION OTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT LL£V=653.5 STORAGE/ENTRANCE ELEV=653.0 Ff), EBAY ENTRANCE SHALL BE FOREBAY p�EPER THAN FOREBAY EXIT II I SHALLf]}+I LAN„ ZONE HERBACEOUS TANTS SHALLOW WATER ZONE HERBACEOUS PLANTS POND "' (NORMAL POOL) 1qSHIL TYPICAL LITTORALF II EGETATION DETAIL SCALE: .T.S, SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE SPACING PLANTING SEASON Jarl effusus Soft Rush SHALLOW WATER 4I PEAT POT 6' O.C. SPRING/SUMMER Iris virgfelca Blue Flag Iris SHALLOW WATER 4 PEAT POT 6' D,[', SPRING/SUMMER Schoonoplectlfs tabernaemonlanl Soft Stem Bulrush SHALLOW WATER PEAT POT 6' O.C. SPRING/SUMMER Eupafortadelphus maculalua Spotted TruTnpelweod SHALLOW LAND 4 PEAT POT 6' O.C. SPRING/SUMMER Eupotortum purpureum Joe-Pye Weed SHALLOW LAND 41 j FEAT POT 6' O.C. SPRING/SUMMER Rhynchospora coloraia Sfarrush Whitatop SHALLOW LAND 4PEAT POT 6' O.C. SPRING/SUMMER TYPICAL LITTORAL HELF PLANTING SCHEDULE 1.1, STAGE STORAGE TABLE o STAGE ELEVATION CONTOUR INCREMENTAL TOTAL I (F7) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) \1 I STORMWATER MANAGEMENT NOTES: 0.0 657.0 2675 0 0 0.5 657.5 3407 1521 1521 I. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEN THE 1.0 658.0 3844 . 1813 3333 (WQv) 8£ST MANAGEMENF PRACTICES) ARE CONSTRUCTED AND A.6'OUI IO BECOME 1.2 658.2 4069 791 4125 OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE 1.5 658.5 4387 1268 5393 COMPLIANCE WITH FHE APPROVED PLAN CAN 5E PERFORMED. 2.0 659.0 4821 2302 7695 2. ANNUAL MAINTENANCE INSPECTION AND REPORT RE{TUIRFD - THE 06VNER OF A 2.5 659.5 5270 2523 10218 PERMITTED STRUCTURAL STGRMWATER SUP/CONTROL SHALL ANNUALLY SUBMIT A MAINTENANCE AND WSPECHON REPORT FOR EACH BMP TO THE 5TORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL 6ECIN WITHIN ONE YEAR 017 T11E I OPERATION $( MAINTENANCE RECORDATfON OF ANY DEEDS) SNOWING STGRMWATER BMPs/CONTROL STRucrITR£s. BMP element Poierff rohfem: How I wilt ramadiate the mblem I 3. UPON COMPLETION OF THE PR0JEC1; AND BEFORE A CERTIFICATE OF OCCUPANCY The 9� ire BMP Trash/debrls is present Remove the irash/debris SHALL 8£ GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE The nma o the yet Areas of bare soil and/or Regmds the soil if necessary to COMPLETED PR4JEC7 IS IN ACCORDANCE WITH THE APPROVED STGRMWATER etenH a basin erasure gullies g es have formed remove the gully, and than plant MANAGEMENT PLANS AND DESIGNS. a ground toyer and water uldfl It It astabRshed. Provide Itme and 4. A FINAL INSPECTION OF THE SITE AND STGRMWATER MANAGEMENT SMP/CONTR(iL5 a one-ilme farNRxar applIasllon TO 8E SCHEDULED V11TH AND COMPLETED EY THE PROJECT ENGINEER. eg an s o s or as long of a n veg ion a e g of appwa%lmately 1 inches. 5. NCDEQ AND THEIR ASSIGNS 14AVF RIGHT TO ACCESS THE STGRMWATER o I ota or 75 pipe Is a agge .. ne og the pi 0131 o e sediment olf-sNe. CONTROL(s) FOR INSPECTIONS OR MAINTENANCE AS NECESSARY, j The pips Is crocked or Replace the pipe, otherwise dolma ed • fi. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL RE REQUIRED PRIOR TO THE Erosion is ocauning In the Ragrode th5wal e a 1 necessary I, FINAL PLAT OR CERTIFICATE OF OCCUPANCY, THE STOR,MWATfR CONTROL JS TO swala. io smooth H over and provide erosion canlrol davlces gush as BE INSPECTED TO ENSURE IT iS FUNCTIONING AS DESICNED AND RAS FULL reinforced Turf malting or rlprap DESIGN VOLUME PRIOR TG 11 OF THE FINAL CERTIFICATE OF OCCUPANCY, io avoid future problems whh eraslon. f 1, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING TH£ STGRMWATER The t bar Sidlinvint howl to 5-Fr far he Mrae of Ihs CONTROLS(s) ACCORDING TO THE APPROVED MAINTENANCE PLAN AND DIRECTION a depth greater than the anginal design dspfh for sediment and remedy the problem if posslbe. Remora iha OF NCDEQ sediment sioraga. sediment and dispose of it in a location where it will not taus® tm acfs fa aheam3 or the BMP, Erosion has ooeured. Provide addBtona ergsicn Protection such as reinforced larf matffng or rill If needed Po Weada are pnuant. rarant future Bros on mblams. amava the weeds, preferably by hand. If pastiaida 15 used, wipe 0 on the plants rather than e v e a a spraying. �7 p STO R M WAT E R /+ /� M A N A G E M E N T DESIGN pro essono Ora ees show chat pruning Is needed rung actor gta best professional proatlaes to malnfaln opilmal plant WET DETENTION POND h°°"" lards 3-1sa-asail i are dead, or dying. peiermino the source of iha problem: sons, hydrology, dlesare, etc. Rsmady the problem and RIPER BASIN: CAPE FEAR ii RECEIVING STREAM: BIG AlAMANCE CREEK replace plants. PI aone-Rme fertiber opplicafion to STREAM INDEX: T6-19 (2 5) a*blish fhe ground cover if a STREAM CLASS: WS-IV;NSW;CA W®eds are present. soll test Indicates It Is necassa . Rsmove iha woods, praferobly t>Y HUC: 0303000203 hand. If pesticide is used, wipe H i PROJECT COORDINATES: 36.013681'N,-79.511817 W on the plants mthar than sprayil e m man area ma os actursu a a depth greater than the ears fir a source o a wilment and remedy the i p�Nn DESIGN SUMMARY onglnaE daslgn sediment poalble. Remora the psedlmentfand DRAINAGE AREA TO POND: 1.12 ACRES storage depth. dispose of It In a locailan *hero it will not cause 51IE IMPERVIOUS AREA TO POND: 0.87 ACRES im acts to slraams or the IBM?. F-SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES Algalgrow covers over of the area. nsu a pro Asa ono o remove and control the all al rowth. TOTAL DESIGN IMPERVIOUS AREA TO POND: 0.1I7 ACRES Coddil, phirti r or ofhor Invasive plonte carer 50% of Rsmove iha plants by wiping r the boom surface. ahem vdth Fell (do no s PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED we -am 3n men ru s eve e o grow an fhe embankmfl rf emove s ra s mm a a - TO POND TO POND THROUGH POND BYPASS COMBINED Erldenos of muakrat ar beaver Use traps to romova muskrats :DRAINAGE AREA: 1,0.91 2.03 AC 1.12 AC AC activtty Is presal and consult a professlonal to CURVE NUMBER: S1.O 89.7 B1.8 _XTia has a o grow on remove beavers. Consu a dam sa a spec al st TIME OF CONCENTRATION: 13.2 MIN 5 MIN 10 MIN the embankmerd. An annual Innspeailan by an fo remove the fret. Make all needed rapalrs. appropriate pmfeaslonal. shows 1.0" STORM EVENT: ICFS 0,008 CFS that the embankmenf needs IISTORM EVENT: 0.536 CFS 3.393 CFS 0.034 CFS 0.277 CFS 0.3t1 CFS a ou fell if a liocbie eves Clogging has accomd, flan a a au a evice. 2-YEAR STORM EVENT: 1.257 CFS 4.362 CFS 0.152 CF05 .618 CFS 0.770 CFS The outlet device Is damaged Olase of the sadlment Off -site, Repolr ar roplaca fhe aaiat 10-YEAR STORM EVENT: 3.733 CFS 6,799 CF5 1.920 CFS 1.755 CFS 3.675 CFS davtca. in9 rater Erosion or other signs of damage have occurred al the Coniad the loot Hill as DMil of Water QuallfY Regional Office, or a roc !OO-YEAR STORM EVENT: 3.479 CFS 10,53 CFS 9.1.77 CFS 3.913 CFS 13.09 CFS auifat. the 401 Overall Unit of 3L T t M G . � ice[ SITE DESIGN CONSULTANT: Triangle Site Design, PLLC 4004 Barrett Drive Suite 101 'Raleigh, NC 27609 (919)553-6570 mlowder@trionglesitedesign.com NC LICENSE #P-0619 SEAL: rssysarrr+�� �a4n�jF�S�/O,y'�ti �. SEAL 244 • 4 UC arra*rs� /1 i o V CV � C3 � o zj a V U Z O V ® •� E OWNER/DEVELOPER: Glandon Forest Equity, LLC 3825 Barrett Drive Suite 100 Raleigh, NC 27609 919-459-2602 919-459--2604 fx gventers@vanguardpg.com (LAYOUT COORD: MEL PLANNING MGR. MEL DRAWING BY: MEL DATE: May 3, 2021 JOB NUMBER: 004211 TITLE: STORMWATER MANAGEMENT DETAILS SHEET NUMBER: c 10 G#------ Burlington-NC62(Alamance)