HomeMy WebLinkAboutSW4210501_Design Calculations_20210714Storm Wafer & Erosion Control Design Calculations July 9, 2021 Dollar General — Bur ington 3340 S. NC Hwy 62 Burlington, NC Alamance County Prepared for: Glandon Forest Equity, LLC 3825 Barrett Drive, Suite100 Raleigh, NC 27609 (919) 459 —2 601 Prepared by: Triangle Site Design, PLLC 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 NC License#P-0619 TRIANGLE S I T E D E S I G N ►`�rA CARp�� •Of z SEAL i 24 3{ . �fr,,-ell ' ►►ifS TABLE OF CONTENTS OVERVIEW STORM WATER NARRATIVE FIGURES SOILS SURVEY & SOIL INFORMATION USGS TOPOGRAPHIC MAP FEMA FIRM MAP SURFACE WATER CLASSIFICATIONS HUC NOAA POINT PRECIPATION FREQUENCY ESTIMATES DRAINAGE AREA MAPS GEOTECHNICAL ENGINEERING REPORT WATER QUANTITY/QUALITY WET DETENTION POND NCDEO BMP SUPPLEMENT CN VALUES PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY TIME OF CONCENTRATION STORM DRAIN SYSTEM GRASS CHANNEL EROSION CONTROL CALCULATIONS RIP -RAP APRON SKIMMER BASIN ANTI -FLOTATION CALCULATIONS TEMPORARY DIVERSION DITCH OVERVIEW Ce a . 1. This report contains the storm water and erosion control calculations for the proposed Dollar General retail site. The project site is located along S. NC Hwy 62 in Alamance County near the intersection with S. NC Hwy 62 and Porter Sharpe Rd and is currently undeveloped. The proposed project site consists of 2.03 acres and approximately 1.88 acres will be disturbed as part of this project for the construction of the site improvements. The development of the site will result in an impervious area of 38,841sf (0.89ac - 43.91 % impervious). The proposed Dollar General parcel is not located within a FEMA designated flood zone as shown on FEMA FIRM Panel 3710884200K with an effective date of 6/18/07. Flood zones are subject to change by FEMA. There are no existing stream or wetland features on the proposed property. The proposed site is within the Cape Fear river basin. The proposed storm water management facility (wet detention pond —retention basin) outlined in this report has been designed to treat the impervious areas of the development. The site grading and storm drainage systems are designed to convey stormwater runoff from the impervious areas of the site to the wet detention pond. The pond is designed to treat a drainage area of 1.12ac with an impervious area of 0.87ac. The balance of the site is open space and will by—pass the proposed pond. The pond is designed to treat a 1.0" storm event. Erosion Control Erosion control measures have been designed in accordance with NCDEQ erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction.' The construction entrance will be installed prior to construction commencing. Inlet protection will be installed around all existing inlets and will be utilized for the proposed curb inlets and drop inlets. A skimmer basin will be used to treat stormwater runoff prior to leaving the site. Accumulated sediment within the project site will need to be removed and the pond constructed to final design conditions prior to final acceptance of the project. Soils The County Soils Survey indicates that Cullen Clay Loam soils are present on the site. Attached in the Figures Section is the geotechnical engineering report which includes site specific information regarding the site investigation and soil profile. Soil Boring B-1 at the proposed wet pond shows a water depth of 12.Oft. The permanent pool elevation is 657.0 and the existing ground elevation is approximately 657.5 at the outlet control structure. Site Sfaaao ion After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements and landscape plan for this site. FIGURES M.9E DE e6L M.6b AE e6L M.%a oU Z M.&a e6L N O O N � NN M d 9'� 0 Z W CD W J a m N m M � N� 7 N p N N -0 N C O d N O U y d n l0 •° Z ° U O L N 7 y O y 7 C C E d �C�pp U? O E E N U y .� N l0 L C a N - U m T w O N a 7� N (0.0 d o E N N a l0 m C E 10 l0 in w N c n y 7 d U U w � « w .: C N y E m w 3 IL/1 N :� ° N Z L Z N V E N D 3 O y m O O a y n E y U W v w� m m v O d 0 oo Z N v L o> 3 y Q 10 3 8 mL N L w L C n y 10 D C C N N N CO Q L `m o 3 m E T > Z o o s a1°i +L° aoi >' U .Lo ° U O n y ° O n T C C O° t O N F •O f0 O L V C n N E E C >,'o y 75 O L U) CL O .y0.. d L O y O U m d O d 7 U N N � Z O U fnNCL o N y %= E N E N m� a 3 C dw 7 tv o w yrE m° L w z 7 E a na ° o c ¢ 16 y rn o o a n E C~ y N d d l0 O] "' E 7 >. N 2 - ° C C O «j2L C "C N m Z �' U w L f0 10 3 .N C 10 Ol w l0 m :� >, l0 O_ E � y ci in acid E rn C > (D E �� m E C l0 is ° ° 7 a� W c 7 0 N nm N .Og y C L C j Nip E w U N U C LD °> O- 7 A mg E ^y L-° Z,° d O C -L a� Qj 10 7 y 10 10 ` 7 L O w O. d N 7 N y w U) N - 2 - O .O-� O O d C N Of H 5 W E •� U fUn a E co 9 U 22 n v Q m H O CO CO cn � O C,4 H coi ILn m l0 m 0 C W m m U N 3 L t c 10 O C O y U m N N O y0 y m W O ° O O L a C) U❑ Z v E o 0 Dom `o m J m Q «O c ■ ■ ■ O W aIn S v n v n o o N _ a)C C O C O Q m a O m C O a e ❑ zmQm m U e❑ a z@ tmQa mQ0)QmU m < v :1DII❑11❑❑ o t I I a®m ■■ fA 0 a y 7 C wo m m y .. C m o zU Hydrologic Soil Group—Alamance County, North Carolina Hydrologic Soil Group Map unit symbol CnB2 Map unit name Rating I Acres in AOI Percent of AOI Cullen clay loam, 2 to 6 I B percent slopes, moderately eroded Totals for Area of Interest Description 3.1 1 100.0% 3.11 100.0% Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (AID, B/0, and C/D). The groups are doomed as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water- table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition usDA Natural Resources Web Soil Survey 3/23/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Alamance County, North Carolina Component Percent Cutoff- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 3/23/2021 I" Conservation Service National Cooperative Soil Survey Page 4 of 4 39 1407 �DJCC7( 5- 1 / N m O _O LL b0 W e v c N m N in Q Q C N O c C E m a LW m` N W U O a N E m � E C .a�-wy_ .-0 C jE SN m O E mO .0 — O a C pp O Y a>T>Nm3 wYWN _ Y aW a O O C CO «>W O WW co E Z5 LL ga p CD `= J l O LW SLL a D E i CD a >7 m � m L7 m m E E mor EO m E m a�ayU0Wp 40 . C 0 m Z O NWmm C O0 W O(mNmCy O a m E WO> U CmNC? LL C O _ U ONZL U Q EWm Ut! n 0 om16¢mO28 CM co 12 A O 0. m W 0aM00 y3 CL mW W W O W C m 0 m 0 Wo NNW E �CW�OE mOacCm Nmm OO ¢ P U dU m ID NNON?O mLL I 1 a E 3N m�L E W N :U jWO REEa0 y yN�Z W EEn my Za ckmmCm❑Ui LL w Lu W ya>C aW $O tm L EmsIDm ' O Z Om >2T 10-aYQ E ~WCo a2OZ m NE Em aa0 W U m Z$ NE a xo a �� L_- ° E m -a mO U95 C �mmLLJm i 0 0 o N 0 0 0 O C 0 O 0 LO N f'] 1 i c �a r Surface Water Classifications: Stream Index Stream Name: Description: ' Y Classification Date of Class. - What does this Class_ mean? River Besn: Zoom to 6 rtlA P/T) 16-19-(2.5 ) Big Alamance Creek (Alamance CreekXLake Mackintosh) From a point 2.4 miles downstream of Guilford County SR 3045 to dam at Lake Mackintosh W S4 V; NS W,CA August 2 1992 More info Cape Fear S NC %09 F Lake AfarkWosh jo 12-Digit HUC(Subwatershed) 12-Digit Name: Lower Big Alamance Creek 12-DI.-It (-,Dde- 030300020310 lu,-Digit Name- Big Alamance Creek 10-Digit Code: 0303000203 8 -DiIg-t Code: 03030002 Piver Basin: Cape Fear 12-Digit Area (ac): 21,629.00 ZDQ,-I-.. tc Ttr National Geographic, Esri, Garmin, HERE UNEP-WCMC, USGS, NASA. ESA N ��dj� NOAA Atlas 14, Volume 2, Version 3 Location name: Burlington, North Carolina, USA' Latitude: 36.01340, Longitude:-79.512° I Elevation: 661.86 ft- 'source: ESRI Maps "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M. Bonnin, D. Martin, B. Lin, T Parzybok, M.Yekta, and D Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 buration Average recurrence interval (years) Ol�� � 10 25 50 1001 200 500 1000 5�llin 4 428 356 0.426-0 509 0.495 d 592 0.540-0 G45 0.586 O..703 0.614-08740 0.638-08772 0 655-00797 0.668-0 821 0.6774--1).836 1.2 10{rlin 0 0 502 %4 0.682-814 0.79 -0 947 (0. 63-41 03 0.934-13.12 0.978-18.18 1.011?23 1. 4 126 1.06-11930 (1.06--1032 0.783 0.935 1.10 1.20 1.30 i.37 1.42 1.46 1.50 1.51 15�tlin 0.715-0.855 0.857-1 02 1.00-1.20 1.09-1.31 1 18-1 42 1 24-1.49 1 28-1.55 1 314.60 1.33-1.64 1.33-1 65 1.07 1.29 1.56 1.73 1.93 2.06 2.18 2.27 2.38 2.45 30{nin 0 ( .981-1.17 118-1.41 (1.42-1.70) (1.58-1.89) (1 75-210 (1.87-2.25 (1.96-2.38) (2,04-2.48) (212-2.60 (2.16-2.68 ) 1. 60�rtin 1 22-31446 (1.49--61277) (1 3--2018 (2 6 2646 2 34 2780 2 53 3.04 2.70-3.27 2..86-3 48 3 04-3.73 3 5 3791 1.58 1.91 2.37 2.70 3.13 3.44 3.74 4.02 4.39 4.65 2-hr 1 45-1 72 (1 75-2 09) 1 (2 17-2.59) 1 (2 47-2.95) 2.84-3.40 3.10-3 74 (3 35-4 06) 1 (3 58-4.37) 1 (3 87-4 77 1,06-5.06 3-hr 8 (1 5--61984) (1.S9- 23} 2, 4-24.77] 16791 16) 3.07 3765 [337.4.02} 3,65-4.39 9 4 (3.74 4. 4-5, 20) 1 [4.476:54 2.05 2.48 71 3.08 3.53 4.13 4.60 5.07 5.53 6.16 6.64 6-hr 1 89-2.23] 2.29-2.7.4 2.83.3.35 3.24-383 3.77 4.47 4.16.4.97) 4.55-5.47 4.91-5.9 5.39.6.65 (5 73-7 18 12-hr 2. 2. 5? $6 2.729522 3.3864 01 .90.4 63 4.5805.4E 5.19 6712 5. 3-6.80 5. 5-7.51 6.84 8.51 (7 34-9 30 24-hr 2.86 3.46 4.31 4.97 5.87 6.59 7.31 8.06 9.08 9.88 2.67-3.08 3.22-3 71 4 01-4.63 4.62.5.34 5 43-6.3 6.07.7.09) 6 72-7.88 7.38.8.70 8269.83 8.94-10 7 2�ay N3-31)3�ay 02 3.763i (465-5.33) . 6 (5:2s.11 66 (5.2715) 4 6.887.9a) 1 (7.55.8.2 8.24.968) 08 9.87-11.8 0, 1 3 6 3.884554. ,605.664 S.7527248397.9729 B.i410.2 (10.4125) 39 4�lay 9 3 1 3.43399) {4 9 4779} (5.14588 (5,88-6 73 6.8 .8$ 7 61 6 81 8.39-9.76 9. 6--10;7 10.2-12.1 11 4131 play -271 (4.02 4Z1$ 4. 95.43) (5.8".58) (6:66-7350) (7 6 68T4) (8. 9.9.74) 9.31- 0:8) 1 (10.2-111 8) 11 3-13: 1212 4.4 10�1ay 733-7 4. 6--5 16 5.42 6514 8. 0-7,37 .34L8.33 8 45 9465 9.32- 0.7 10.2-101.8 11 1-12:B 122-1-14A 13 14 5.5 20�ay 2 6. 686 7228409 8 53-9.55 9 56-10 7 (10 9-12.A (12,0-13.7 13 1415.❑ 1412-163 15.6-18.2 1618- 9.7 30 day 8.03 7.64-8 46 9.45 8.989.94 11.0 10.4-11.5 12.2 11 5-12 8 13.7 (13 0-14.4) 14.9 1 (14.1-15.7) 16.1 1 (15.1-17.0 17.3 152.18.3 18.9 17.6-20 1 20.1 18.7-21 4 2- 11 3-125 (13.0- 4.3 14 5 T (1519-17.fi 17 1819.0 18 3-20.5 19 50281.9 (21.0.3.8 2?2 5.3). 12.2 14.2 16.0 17.4 19.2 20.6 21.9 23.1 24.7 25.9 60�1ay (11.7-128] (13.5-14.9 15.3-16.8 (16.7-18,3 18.3.2t7.2 ( 19.5.21.E 20.8.23.❑ ( 21.9.24.3 23.4.26.1 4.4274 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values Please refer to NOAA Atlas 14 document for more information. Back to TQQ PF graphical Jn Z� z > > Nu^NJ wudugy Z 0 C-4 DUjjOJD3 44raN 'UOI�+W^9 9 Z9 ADM4fiW NMIuj op $£g� MIA o -. CD a a dM yid Z uK i z� Q z z -11WOO WON 'll"I6dIN^B a'+. 8 �gg • a z z � Z9 A—Y61H DN 'S Om B C, All • 1 � ra �� � ggg�g giP��ll�'�'l�lll,{•I��' C • @i S R NOW �I• eI all U Kill 15 • c d • d e. d d d 11 � •lilt- �. ` ��� q do `I llYk-_9 +•y 1 . ` ti l �1y r r � r J ~ � 1111 I y,. All 1 i Ile IF oil Jill I loll fill 1114 Pip r M � � � = Philp � 1 L jgm ♦ 4 Y 2+ p Z11 �� \ 1 ` =A 4i�I • z !y CUj \ cm C) N .i [�l1 li LJi� \ yl 1 E y , yp \ • �h y � J o� Q i aullom3 44J•N 'wl6uiNn9 c., w Z9 '�g61H ON 'S OM ri QR14-Affluivij A K " ��, I � Li IL-J21) g3 !ll ° €Q•1 11 p i ierC�i�@sr 0 Uaiii \ 1 I I l�! kL / r I , ril� �► 1 Geotechnical and Construction Materials Testing Services April 19, 2021 Ashley Davis GLANDON FOREST EQUITY, LLC 3825 Barrett Drive, Suite 100 Raleigh, NC 27609 Re: Subsurface Investigation Proposed Dollar General Store NE Intersection of Porter Sharpe Road/Highway 62 Burlington, North Carolina GeoTechnologies Project No. 1-21-0288-EA Dear Ms. Davis: GeoTechnologies, Inc. has completed test borings to evaluate subsurface soil conditions for the referenced project located at the northeast intersection of Porter Sharpe Road and Highway 62 in Burlington- North Carolina. Subsurface conditions were investigated by completing nine soil test borings at the approximate locations shown on the attached Figure 1. The boring locations were established in the field by measuring distances off existing site landmarks and should be considered approximate. The test borings were advanced to termination depths of approximately 10 to 20 feet below site grade utilizing standard penetration test procedures (automatic hammer) at selected intervals to evaluate the consistency and density of the subsurface soils. This report presents the findings of our investigation and our recommendations regarding site grading and foundation support considerations. SITE AND PROJECT INFORMATION It is our understanding that a vacant and open parcel at the northeast intersection of Porter Sharpe Road and Highway 62 will be developed with a Dollar General store. The Dollar General store will encompass about 10,000 square feet of space, with pavements to the south and west of the building. Plan grades were not provided; however, we anticipate that cuts and fills will generally be less than about 5 ' feet. Based on our experience with similar projects, we expect that maximum column loads will be about 90 kips with walls loads not exceeding 2 to 3 klf. SUBSURFACE CONDITIONS A generalized subsurface profile prepared from the test boring data is attached to this report as Figure 2 to graphically illustrate subsurface conditions encountered at this site. More detailed descriptions of the conditions encountered at the individual test boring locations are then presented on the attached test boring records. Conditions in the borings consisted of a surface layer of topsoil which was underlain by residual clays and silts which were typically highly plastic and exhibited penetration resistances of 4+ blows per foot (bpf). With depth, the soils were typically low to high plasticity silts which exhibited penetration resistances of 2 to 10+ bpi The borings were terminated in these soils at depths of 10 to 20 feet. Groundwater was encountered in the deeper borings at about 11.5 to 12.5 feet at the time of completion It should also be noted that the near surface soils at this site are conducive to the temporary development of perched groundwater conditions during periods of wet weather and that groundwater levels will fluctuate during different periods of the year. 3200 Wellington Ct., Ste 108 • Raleigh, NC 27615 - Phone 919-954-1514 - Fax 919-954-1428 • www.geotechpa.com - License No. C-0894 Re: Dollar General Store April 19, 2021 Page: 2 RECOMMENDATIONS The following recommendations are made based upon a review of the attached test boring data, our understanding of the proposed construction, and experience with similar projects and subsurface conditions. Once structural and civil drawings are available, that information should be provided to us so that our recommendations can be extended or modified as necessary. Site Grading Considerations. Site grading should begin with stripping of all topsoil. Exposed subgrade evaluations should consist of proofrolling with a loaded dump truck and performing hand auger borings. Repairs should be performed as directed by the geotechnical engineer. Our borings indicate that the need for undercut repair should be limited to 12 to 24 inches or less in most areas. Provided that soils which are soft to no more than 12 inches can be moisture conditioned and recompacted as necessary, undercut can be reduced. The site should be graded during a period of warm and dry weather. During an average year, the best time of the year for site work occurs from about April through October. If the site is graded during an unfavorable period, undercut quantities will increase as shallow drying/recompacting type repairs will not be effective during this time of year. Drying will also not be effective if the contractor does not provide a farm disc to turn wet soils. As such, contractor documents should require that a disc be provided as needed. Borrow Sources/Fill Placement. The near surface site profile is typically highly plastic silts and clays which should not be reused as structural fill within 3 feet of subgrade in the building pad, and within 12 inches of subgrade in pavement areas. Additionally, these soils were moist to wet in some areas. In order to achieve density and stability, all fill soils should be compacted within about 2% of optimum moisture content unless otherwise directed by the geotechnical engineer. As such, the contractor should be prepared to moisture condition (wet or dry) the soils as necessary. Attempting to dry and compact wet soils during a wet period of the year will be difficult. If off -site borrow is needed, we recommend this material consist of silty and clayey sands or low plasticity silts and clays having Unified Soil Classifications of SM, SC, ML, or CL. All fill materials in structural and pavement areas should be compacted to not less than 95% of the standard Proctor maximum dry density except in the final foot where this requirement should be increased to 98%. In order to achieve density and stability, the soils should be compacted within about 2% of optimum moisture content unless otherwise directed by the geotechnical engineer. Fill Induced Settlements. In any area where site grade will be raised by more than 5 feet, some settlement of the underlying soils will occur. It is recommended that fill induced settlements be allowed to subside before construction begins. As such, we recommend that the project surveyors establish monitoring points in deep fill areas (any area with more than 5 feet) to verify that fill induced settlements have subsided. Based on experience, we anticipate that the monitoring period will not exceed 30 days following the completion of filling. Because fill induced settlements will subside before paving operations, monitoring these areas is not necessary. Difficult Excavation Considerations. The test borings did not encounter any difficult excavation type materials. However, we recommend that contract documents clearly specify the type of equipment which will be used to demonstrate difficult excavation. We recommend that a fair unit price be established for difficult excavation removal, and that verification/measurement protocols be established at the start of construction. All difficult excavation quantification should be based on bank yardage and not on loose material piles or truck load counts which are not accurate. GeoTechnologies,lnc. Re: Dollar General Store April 19, 2021 Page: 3 Shallow Foundations. Assuming the site is prepared as discussed, we have used the FHA Settlement Estimation Procedure to estimate that column/wall loads of about 100 kips or 6 klf can be supported with the resulting settlement being about 1 inch or less for a design bearing of 2.5 ksf with foundations bearing at least 18 inches below grade. Our estimates should be considered preliminary in nature, and should be verified once structural and civil design drawings are available. Bearing conditions should be inspected by a geotecluucal engineer during footing construction to verify that adequate bearing and suitable materials have been encountered. Should foundations need to be extended to provide adequate bearing, we recommend that over -excavated footings be backfilled to design bearing elevation utilizing uniformly graded #57 or #67 washed stone. The stone must be compacted in lifts of 24 inches with appropriate equipment, and must be thoroughly compacted at the top with vibratory equipment or heavy tamping. Highly plastic soils are likely to be encountered at subgrade, and these materials should be removed from within at least 3 feet of final grade and replaced with lean concrete unless otherwise directed by the geotechnical engineer. Slab -on -Grades. We recommend that conventional slab -on -grades be designed for an assumed subgrade modulus of 100 pci (for a 1 foot by 1 foot area). A minimum of 4 inches of compacted CABC stone should be placed under all concrete slabs. Expansive soils should be removed from the upper 12 inches of the slab subgrade unless otherwise directed by the geotechnical engineer. Below Grade Walls and Retaining Rigid below grade walls and retaining walls with level backfill should be designed assuming the adjacent soils will behave as an equivalent fluid having a unit weight of 60 pcf for the at -rest condition and 45 pcf for the active earth pressure condition. These values do not account for any loading associated with slopes or other surcharging. An equivalent fluid pressure of 250 pcf will be applicable for the passive pressure for level ground on the front of the wall. This is an ultimate value and an appropriate safety factor should be applied. An allowable bearing pressure of 2.5 ksf may be used for the design of below grade walls bearing on approved soils. A design moist soil unit weight of 115 psf and a friction factor of 0.30 may also be used. Any fill material placed adjacent to below grade walls should be compacted to a minimum of 95% of the standard Proctor maximum dry density, except where 98% is required at subgrade. Additionally, any soils placed within 3 to 4 feet of below grade walls should be compacted with light hand held equipment to prevent overstressing of the walls. This will necessitate that backfidl be placed in 4 to 6 inch lifts. We recommend that all below grade walls be properly waterproofed and that a drain be placed against those walls to intercept seepage and prevent a build-up of hydrostatic pressure behind the walls. The drain should be connected to a collector drain that daylights to a down gradient area unless a sump pump is used. Segmental Walls. On most local projects, design parameters/specifications implicitly or explicitly exclude the use of the on -site soils. Local import materials which are generally used in place of the on -site soils include CAB base course stone, washed stone, granular processed fill, or screenings which are available from area quarries. We recommend that all retaining wall designs include an assessment of global stability, to include tiered walls and walls located in or on slopes. These analyses should be considered part of the wall design package, and designs which do not explicitly address global stability should not be considered complete. If segmental walls will be used on this project, we recommend that the wall designer contact us to discuss appropriate parameters. Wall designs should include appropriate drainage provisions both directly behind the face block as well as behind the reinforced zone. Although true groundwater is not prevalent shallow at this site, it may be encountered as the potential for perched water exists. As such, adequate provisions should be included in the wall design details. www.geotechpa.com Re: Dollar General Store April 19, 2021 Page: 4 Slopes. The maximurn angle for unreinforced fill slopes should be 2.5H:1V, while steeper slopes can be used with properly designed and installed geosynthetic reinforcement. Cut slopes should also be on the order of 2.511:IV. Steeper slopes should be reviewed and approved by the geotechnical engineer, and all out slopes and excavations for retaining walls should be evaluated by the engineer to verify that recommended angles are appropriate for the site specific soils. Pavement Design. Following proper completion of grading, the site should be suitable for support of conventional pavement structures. All pavement subgrades should be moisture conditioned and recompacted to not less than 981/6 of the standard Proctor maximum dry density immediately prior to placement of base course stone. The subgrades should also be proofrolled for stability. Due to the high potential for perched groundwater conditions to develop during periods of wet weather, site grades should be detailed to promote drainage away from the pavement areas, and underdrains or ditches should be provided along the high side of all pavements. Strip drains should be provided inside all irrigated traffic islands. Highly plastic soils should be excluded from the upper 12 inches of subgrade, and we are assuming that the upper 12 inches of subgrade will consist of a material with a minimum design CBR value of 4% (should be confirmed once a borrow source is identified). Specific pavement sections can be provided once traffic loading and volume details are lmown; however, typical sections include 4 inches of asphalt over 8 inches of CABC stone for a heavy duty section, and 3 inches of asphalt over 6 inches of stone for light duty areas. Seismic Design Considerations. Based on SPT N-values, and experiece in the area, the site should be given a seismic design classification of "E". SUMMARY In summary, site conditions are characterized by the presence of highly plastic silts and clays near surface. These materials are not suitable as a borrow source for shallow fills. Provisions to handle these soils relative to foundation, slab, and pavement construction have been provided. The on -site soils were moist to wet in some areas. Once building loads and foundation geometries are known, settlements can be evaluated in greater detail. GeoTechnologies, Inc. appreciates the opportunity to be of service on this phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this or other projects. Sincerely, or A logies, Inc. _. . Ernest L. Stitzinger, P.E. NC Registration No. 25534 www,000lechpa.com w v'= o 4uno3 eauowory � Q i ? oui�ao� 4P-N W 1BU!Png �. r z z Z9 A-46!H ON 'S DW vVTM ¢ O U u RI z it=V)a€ fill °I Ell ILI r U° °i I .°ir tl g °!° tl; Py ' tl °aPt za°h i ° i s d � �• r�■ ! ! ri3� a tly i �� 1i1° it 1°�tl P # N 1 C" i,'�.i #it� •�++ )�)l1.5,11tlVly�;! !7+ �p•�!�+l,Il �;l� ��ip sm q Ill '1 ,�ee' ,1 I f:� a M C C 10 QQ 10 N U OC o iA y U N U Z a A2u u a v w N w N N N N V — f0 �p M 10 W m y a a a a a w a rn rn rn rn o J � 'x � �x 'x 'x N c� 0 N O CO — O in r ao to: a m w Q in O r N r Oy: W O 00 10: v/ w N O N w m qt /w V DO r r Q1 m L"7 :R N O DO r r 00: N et:, CO) 04 et m is N m f[� r 7 m V w C ed C asp 0 LL PI Q O N 10 co O r N r 1* <D r r Go r O N N N CL 0 0 0 Q a m DEPTH (FT.) 0.0 0.2 8.0 12.0 ` it d TEST BORING RECORD _] DESCRIPTION ELEVATION PENETRATION BLOWS PER (FT.) (BLOWS/FT.) SIX INCHES 6 10 20 40 60 100 Topsoil. 111T3 2-2-3 3-5-7 2-3-4 2-3-3 1-1-1 1-2-2 Firm to Stiff Orange Clayey SILT Firm Orange SILT ML Nil{ Very Soft to Soft Orange SILT �9I. Boring terminated at 20' Groundwater encountered at 12' at time of boring. JOB NUMBER 1-21-0288-EA BORING NUMBER B- 1 DATE 4-19-21 PAGE 1 OF 1 C;coTe,.hno1og1e-). 3200 Wellington Court, Ste 108 Raleigh, NC 27615 'U WATER QUALITY/QUANTITY SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Dollar General - Burlington 2,03 2 Project Area ac 3 Coastal Wetland Area ac - 4 Surface Water Area ac 5 Is this project High or Low Density? High No 6 Does this project use an off -site SCM? COMPLIANCE WITH 02H .1003(4 7 Width of vegetated setbacks.provided (feet) 8 Will the ve± etated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater. Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 1 Ba filter 0 26 IFilterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Organization: Street address: C4ty, State, Zip: Phone number(s): Email; Matt Lowder, PE 28 Triangle Site Design, PLLC 29 4004 Barrett Dr, Suite 101 30 Raleigh, NC 27609 31 919-553-6570 32 mlowder@trianglesitedesign.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here SEAL 24434 4-i4: f•��O�Fr�attftttt�e 5lpnafu of Designer �2 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area (sq ft 88448 48714 6 Onsite drainage area (sq ft 88448 48714 7 Offsite drainage area (sq ft 0 0 8 Total BUA in project (sq ft 38841 sf 38022 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft - 10permitting) New BUA not on subdivided lots (subject to s - 11 Offsite BUA (sq ft - 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 26385 sf 25566 sf Sidewalk (sq ft 1816 sf 1816 sf Roof (sq ft 10640 sf 10640 sf Roadway s ft Future (sq ft - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft - 15 Existing BUA that will remain (not subject to permitting) fsq ft - - 16 Existinq BUA that is already permitted (sq ft) - 17 Existing BUA that will be removed (sq ft - - 18 Percent BUA 44% 78% 19 Design storm inches 1.0 in 20 1 Design volume of SCM cu ft 3055 cf 21 lCalculation method for design volume Simple Method ADDITIONAL INFORIYIATf N ' Please use this space to provide any additional information about the 22 drainage area(s): A small portion of the area at the driveway entrance is not captured due to the elevations of the proposed site. This area was accounted for in the curve number calculations as bypass area in order to ensure post -developed peak flow run off does not exceed pre -developed levels. WET POND 1 Draiha ge area number Minimum required treatment volume cu ft 1 2 3055 cf GENERAL MDC FROM 02H AWO 3 1 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM H: ? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the desi n volume? Yes 9 What is the method for clewatering the SCM for maintenance? Pump referred 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC 8 ? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the devicespecific MDC? Yes 17 1 Was the SCM des!ned by an NC Ilcensedprofessional? Yes AM 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 650.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 651.00 22 Elevation of the bottom of the vegetated shelf fmsl 656.50 23 Elevation of the permanent pool (fmsl) 657.00 24 Elevation of the top of the vegetated shelf fmsl 657.50 25 Elevation of the temporary pool (fmsl) 658.00 26 Surface area of the main permanent poolAsquare feet 2012 27 Volume of the main permanent 2ool cubic feet) 4644 cf 28 Average depth of the main pool (feet) 3.06 ft 29 Average depth euation used Equation 3 30 If using equation 3, main pool perimeter feet 189.0 ft 31 If using equation 3, width of submerged veg. shelf feet 3.0 ft 32 Volume of the foreba cubic feet 821 cf 33 Is this 15-20% of the volume in the mainpool? Yes 34 Clean -out depth for forebainches 36in 35 Desi n volume of SCM cu ft 3055 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 0.75 in 38 If weir, weir height (inches) 39 If weir, weir length inches 40 Drawdown time for the temporary pool (days) 3.19 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flowpath? No 43 Depth of forebay at entrance (inches) 48 in 44 Depth of fo ebay at exit (inches) 42 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf feet 6 ft 47 Slope of vegetated shelf H: 6:1 48 Does the orifice drawdown from below the top surface of the permanentpool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1 r, 24-hr storm? Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. Yes 50 No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 S ecies of turf that will be used on the dam and embankment Hybrid Bermuda 54 Hasa planting plan been provided for the vegetated shelf? Yes Ap171iIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 1:08 PM 7/9/2021 Triangle Site Design, PLLC Curve Number Calculation (CN) Pre -Developed Conditions (Overall Site) Drainage Area (acres 2.03 Existing Soil Groins Soil Group Map Symbol Soil Description Acres Percent of DA B CnB2 Cullen clay loam 2.03 100% Proposed Land Uses: Land Use Description Existinq Soil Group Acres Curve # Weighted CN Open - Good B 2.03 61 61.0 Cumulative Curve # = 61.0 Triangle Site Design, PLLC Curve Number Calculation (CN) Post -Developed Conditions (Wet Pond) Drainage Area (acres): 1.12 Existing Soil Groups: Soil Grouv Map Symbol Soil Description Acres Percent of DA B CnB2 Cullen clay loam 1.12 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good B 0.25 61 13.6 Impervious Area - Building/Pavement B 0.87 98 76.1 Cumulative Curve # = 89.7 Triangle Site Design, PLLC Curve Number Calculation (CN) Post -Developed Bypass Conditions (Wet Pond) Drainage Area (acres Z 0.91 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA B CnB2 Cullen clay loam 0.91 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve # Weighted CN Open Space - Good B 0.89 61 59.7 Impervious Area - Building/Paveme B 0.02 98 2.2 Cumulative Curve # = 61.8 Proposed Wet Pond Project Information Project Name: Dollar General - Burlington Project #: Designed by: RG Date: 7/9/2021 Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 1.12 Acres 48,714 sf Impervious Area (IA) = 0.87 Acres 38,022 sf Percent Impervious (1) = % 78.05 % Required Surface Area Permament Pool Depth: 3.06 ft Non -Coastal County SA/DA = 2.81 Min Req'd Surface Area = 1,369 sf (at Permanent Pool) Required WQv Storage Volume Design Storm = inch Non -Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.752 in/in Storage Volume Required = 3,055 cf (above Permanent Pool) Elevations Top of Pond Elevation = 659.50 ft Temporary Pool Elevation = 658.00 ft Permanent Pool Elevation = 657.00 ft Shelf Begining Elevation = 657.50 ft Forebay Weir = 656.50 ft Shelf Ending Elevation = 656.50 ft Bottom Elevation = 651.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 2,012 sf Volume of Temporary Storage = 3,334 cf Is Permenant Pool Surface Area Sufficient (yes/no)? ( 2012 > 1369 ) sf Volume of Storage for Design Storm = ( 3334 > 3055 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD -Water Quality Volume Project Information Project Nar Dollar General - Burlington Project #: 9signed by: RG Date: 7/9/2021 iecked by: Date: Water Quality Orifice ' Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) _ Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Q3 = 0.0437 Cp' D2 (Z-D/24-Ei)AW2) Q2 = 0.372 CD * D"(Z-Ei)1(312) QJ=O 0.75 In 0.6 657 Orifice Inv. 0.00 to 657 657 to 657.1 657.1 to 657.9 Incremental Drawdown Method Countour Contour Area Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 657.00 2,675 0 0.00 2.00 0.000 -- 657.50 3407 1.521 0.50 3.00 0.010 2,510 658.00 3844 1.813 0.50 3.00 0.015 2,082 Total 3.334 Drawdown Time = Incremental Volume / Q / 60sec/min Summary Total Volume = 3,334 cf Total Time = 4,692 min Total Time = 3.19 days Between 2 & 5 7/9/2021 Prop Wet Pond- new design-Burlington.xls 1 of 1 Project: Pond #1 Date: 4/27/2021 Main -Pond Contours -Volumes Elevation Main -Pond Incremental Vol. Accumulated Vol. Description 657 2,012 871 4,644 A2 (Perm —Pool) 656.5 1,470 694 3,773 Al (Bottom —Shelf) 656 1,305 1,148 3,080 655 991 850 1,932 654 708 583 1,082 653 458 350 499 652 242 149 149 651 56 0 0 A3 (Bottom —Pond) Forebay Contours -Volumes Elevation FB1 FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 657 555 555 256 821 656.5 470 470 197 565 656 318 318 253 368 655 188 188 115 115 654 41 41 0 0 Forebay Volume Average Depth (Option 1) Average Depth Calculation (Option 2) Vpp permeter of shelf width of shelf Al (Bottom —Shelf): Average Depth = 17.7% *Between 15% & 20% 2.57 *At least 3' average depth 4,644 189 3 1,470 3.06 Proposed Wet Pond #1 Project Information Project Name: Dollar General - Burlington Project #: Designed by: RG Date: 7/9/2021 Revised by: Date: Checked by: Date Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 1.12 Acres Impervious Area (IA) = 0.87 Acres Percent Impervious (1) = 78.05 % (Drainage Area) Orifice Sizing Orifice Size = 0.75 in (Diameter) Drawdown Time = 3.19 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 136.0 cf Weight: 8486 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 10,184 Ibs Volume of Concrete Req'd: 67.9 cf (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) Volume Provided: 77.5 cf (4'x4' riser x 2.5' =40cf, 5'x5' footing x 1.5'=37.5cf) r i , IMPERV OUS AREA SUMMARY) ON -SITE AREA = 88 448SF 2.03AC AFTER R W DEDICATION BUILDINGS 10,640 SF 0.24 ACRE(S) 12.03 % OF AREA PAVEMENT 26,385 SF 0.61 ACRE(S) 29.83 % OF AREA SIDEWALK 19816 SF 0.04 ACRE(S) 2.05 % OF AREA TOTAL IMPERVIOUS AREA 389841 SF 0.89 ACRE(S) 43.91 % OF AREA GREEN/OPEN SPACE 499607 SF 1.14 ACRE(S) 56.09 % OF AREA INCREASE IN IMPERVIOUS AREA: 38,841 SF 0.89 ACRE(S) i C O I OI I OI Q W Y rNp C N y 3 o C W N J H H C'JP - _ C NNG O4Wry H V K H I r igr „r L j Y �Jr t34 co —" �, � 1 ❑ f It ID or -s 99 � x � a99 •s�9 - - 9 fiSg ' � � �_ � � r >ti• f � � � 1 ta � �� � 1 I U 11 ♦ .f •• (+�+ + jj+ f I 1 � 2 r 1 �STAGE/STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 657.0 2675 0 0 0.5 657.5 3407 1521 1521 1.0 658.0 3844 1813 3333 (WQv) 1.2 658.2 4069 791 4125 1.5 658.5 4387 1268 5393 2.0 659.0 4821 2302 7695 2.5 659.5 5270 2523 10218 §TOR�MW�ATER MANAGEMENT DESIGN WET DETENTION POND RIVER BASIN: CAPE FEAR RECEIVING STREAM: BIG ALAGANCE CREEK STREAM INDEX: 16-19-(2.5) STREAM CLASS: WS-IV;NSW;CA HUC: 0303000203 PROJECT COORDINATES: 36.013681'N,-79.511817'W POND DESIGN SUMMARY DRAINAGE AREA TO POND: 1.12 ACRES SITE IMPERVIOUS AREA TO POND: 0.87 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: 0.0 ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 0.87 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED TO POND TOP D THROUGH POND BYPASS M[INED DRAINAGE AREA: 2.03 AC 1.12 AC 0.91 AC CURVE NUMBER: 61.0 89.7 61.8 TIME OF CONCENTRATION: 13.2 MIN 5 MIN 10 MIN 1.0' STORM EVENT: 1-YEAR STORM EVENT: 2-YEAR STORM EVENT: 10-YEAR STORM EVENT: 100-YEAR STORM EVENT: 0.275 CFS 0.536 CFS 3.393 CFS 1.257 CFS 4.362 CFS 3.733 CFS 6.799 CFS 8.479 CFS 10.53 CFS 0.008 CFS 0.034 CFS 0.152 CFS 1.920 CFS 9.177 CFS 0.277 CFS 0.618 CFS 1.755 CFS 3.913 CFS 0.311 CFS 0.770 CFS 3.675 CFS 13.09 CFS ■ F §.§ ■ \. §■� k��■ § \ 7`x| . \ \ , «!2 2 § k2 § : 2 ■ \ , § § ■ a ! | / �■§ 2 \2 » LU m" p \\ \§ iz ■§ O■§ = <{ �.§ 2- §§jm 2 ■m k2§ ® \�2 � \ , er- 2�§ � § . p� � _ § 411 § %i mg <\`� §|& £■� $ � k ti 7e mB|] \§�)/ |\� B ! 4■® }» — I� (fwq\ \ . | ■ § 7�� \ 27$m �!7§zi § _� ■|�- ® ■,|m § k�■§@| R w- W 000 � w W M Nw — O W IIO _ w H x �tz 11 w r s o 0 � 3 f e � N i m r m rn �r o KN -11 -L TAD nr croUCTURE NOT SHOWN FOR CLARITY TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR KIWtK JIMAUM 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. EXTEND 4" PVC THROUGH RISER STRUCTURE 4"x4" PVC TEE PERM. POND ELEV.=657.0 12" MIN. 0.75"DU1. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET JSCALE:N.T.S. Pond Report 9 Hydraflow Hydrographs Extension for AUtoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, Jul 9, 2021 Pond No. 1 - BMP Pond Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 657.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 657.00 2,675 0 0 0.50 657.50 3,407 1,521 1,521 1.00 658.00 3,844 1,813 3,333 1.20 658.20 4,069 791 4,125 1.50 658.50 4,387 1,268 5,393 2.00 659.00 4,821 2,302 7,695 2.50 659.50 5,270 2,523 10,218 Culvert / Orifice Structures [A] [B] [C] [PrFRsr] Rise (in) = 15.00 0.75 0.00 0.00 Span (in) = 15.00 0.75 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft) = 657.00 657.00 0.00 0.00 Length (ft) = 22.00 0.50 0.00 0.00 Slope (%) = 2.27 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multistage = n/a Yes No No Stage (ft) 3.00 2.00 1.00 2.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 2.00 14.00 0.00 0.00 Crest El. (ft) = 658.60 659.00 0.00 0.00 Weir Coeff. = 3.33 2.60 3.33 3.33 Weir Type = Rect Broad --- --- Multistage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: CulvertfOrifice outflows are analyzed under inlet (ic) and outlet (oc) control Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge 4.00 6.00 8.00 Elev (ft) 660.00 659.00 658.00 657.00 10.00 12.00 14.00 16.00 18.00 20.00 Discharge (cfs) Hydrograph Summary Rep —I-fydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.536 2 724 2,380 -- - BMP Pre -Developed 2 SCS Runoff 3.393 2 716 6,979 ------ ------ BMP Post -Developed 3 Reservoir 0.034 2 1252 4,978 2 658.61 5,903 Post Through Pond 4 SCS Runoff 0.277 2 724 1,151 - - - - Post Developed - Pond Bypass 6 SCS Runoff 0.275 2 146 1,179 — - ------ BMP Post -Developed 7 Reservoir 0.008 2 366 1,103 6 657.36 1,088 1.0-in Storm Thru Pond Burlington_Pond.gpw Return Period: 1 Year Friday, Jul 9, 2021 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 2.030 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.86 in Storm duration = 24 hrs BMP Pre -Developed Friday, Jul 9, 2021 Peak discharge = 0.536 cfs Time to peak = 724 min Hyd. volume = 2,380 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 13.20 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 = 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 I 0.20 0.10 - 0.10 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 1.120 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.86 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 I of m BMP Post -Developed Hyd. No. 2 -- 1 Year Friday, Jul 9, 2021 Peak discharge = 3.393 cfs Time to peak = 716 min Hyd. volume = 6,979 cuft Curve number = 89.7 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 120 240 360 480 600 720 840 960 Hyd No. 2 Q (cfs) 4.00 4M 2.00 1.00 0.00 1080 1200 1320 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. 3.00 2.00 1.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Friday, Jul 9, 2021 = 0.034 cfs = 1252 min = 4,978 tuft = 658.61 ft = 5,903 tuft Post Through Pond Hyd. No. 3 -- 1 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 3 Hyd No. 2 ® Total storage used = 5,903 cult Q (cfs) 4.00 3.00 2.00 1.00 0.00 6000 Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3D®2009 byAutodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 0.277 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,151 cuft Drainage area = 0.910 ac Curve number = 61.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 2.86 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs 0.50 - - — 0.50 0.45 - - 0.45 0.40 0.40 0.35 - - 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 - 0.15 0.10 - 0.10 0.05 - — - 0.05 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 4 Post Developed - Pond Bypass Hyd. No. 4 -- 1 Year FA Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 6 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 0.275 cfs Storm frequency = 1 yrs Time to peak = 146 min Time interval = 2 min Hyd. volume = 1,179 cuft Drainage area = 1.120 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 BMP Post -Developed Hyd. No. 6 -- 1 Year 60 120 180 240 300 360 Hyd No. 6 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 420 Time (min) 0 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.008 cfs Storm frequency = 1 yrs Time to peak = 366 min Time interval = 2 min Hyd. volume = 1,103 cuft Inflow hyd. No. = 6 - BMP Post -Developed Max. Elevation = 657.36 ft Reservoir name = BMP Pond Max. Storage = 1,088 cuft Storage Indication method used. Q (cfs) 1.0-in Storm Thru Pond Hyd. No. 7 -- 1 Year Q (cfs) 0.50 0.45 0.50 - 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0 00 -T~ 0 00 0 480 960 1440 1920 2400 2880 3360 3840 Hyd No. 7 Hyd No. 6 ® Total storage used = 1,088 cuft 4320 Time (min) Hydrograph Summary Re PC Ffydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) 4,216 Inflow hyd(s) --- Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 1.257 2 722 --- — BMP Pre -Developed 2 SCS Runoff 4.362 2 716 9,084 --- - BMP Post -Developed 3 Reservoir 0.152 2 816 7,075 2 658.67 6,185 Post Through Pond 4 SCS Runoff 0.618 2 722 2,004 - ------ ------ Post Developed - Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ----- BMP Post -Developed 7 Reservoir 0.000 2 n/a 0 6 657.00 0.000 Friday, Jul 1.0-in Storm Thru Pond 9, 2021 Burl ington_Pond.gpw Return Period: 2 Year 11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 2.030 ac Basin Slope = 0.0 % Tc -method = USER Total precip. = 3.46 in Storm duration = 24 hrs Q (cfs) 2.00 J --I—. J 1.00 0.00 0 BMP Pre -Developed Hyd. No. 1 -- 2 Year 120 240 360 480 600 720 840 960 Hyd No. 1 Friday, Jul 9, 2021 Peak discharge = 1.257 cfs Time to peak = 722 min Hyd. volume = 4,216 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 13.20 min Distribution = Type II Shape factor = 484 Q (cfs) 2.00 1.00 - 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 1.120 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.46 in Storm duration = 24 hrs BMP Post -Developed 12 Friday, Jul 9, 2021 Peak discharge = 4.362 cfs Time to peak = 716 min Hyd. volume = 9,084 cuft Curve number = 89.7 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 5.00 5.00 4.00 - 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. 4.00 W1 2.00 W1111 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 13 Friday, Jul 9, 2021 = 0.152 cfs = 816 min = 7,075 cuft = 658.67 ft = 6,185 cuft Post Through Pond Hyd. No. 3 -- 2 Year 600 1200 1800 2400 3000 3600 4200 4800 5400 Hyd No. 3 - Hyd No. 2 FEEEM , Total storage used = 6,185 cuft Q (cfs) 5.00 4.00 K 11 2.00 WIjl] 0.00 6000 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.46 in Storm duration = 24 hrs Q (cfs 1.00 1.00 0.90 0.90 0.80 - 0.80 0.70 _1- 0.70 0.60 - - 0.60 0.50 - 0.50 0.40 0.40 0.30 - 0.30 0.20 0.20 0.10 0.10 0.00 0:00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Friday, Jul 9, 2021 Peak discharge = 0.618 cfs Time to peak = 722 min Hyd. volume = 2,004 cuft Curve number = 61.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Post Developed - Pond Bypass Hyd. No. 4 -- 2 Year 17 Hydrograph Summary Re PC I-fydraflow Hydrographs Extension for AUtoCADO Civil 3D8 2009 by Autodesk, Inc. v6.066 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum I Total Hydrograph No. type flow interval peak volume hyd(s) elevation f strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 3.733 2 722 10,267 — - - - BMP Pre -Developed 2 SCS Runoff 6.799 2 716 14,545 - -- BMP Post -Developed 3 Reservoir 1.920 2 724 12,523 2 659.02 7,770 Post Through Pond 4 SCS Runoff 1.755 2 722 4,790 ------ -- Post Developed - Pond Bypass 7 Re ervo Doff 0.000 2 n/a 0 6 657.00 0.000 BMP Post -Developed 1.0-in Storm Thru Pond Burlington_Pond.gpw Return Period: 10 Year Friday, Jul 9, 2021 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 2.030 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.97 in Storm duration = 24 hrs Q (cfs) 4.00 cM 2.00 1.00 0.00 0 120 240 Hyd No. 1 BMP Pre -Developed Hyd. No. 1 -- 10 Year 360 480 600 720 840 Friday, Jul 9, 2021 Peak discharge = 3.733 cfs Time to peak = 722 min Hyd. volume = 10,267 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 13.20 min Distribution = Type II Shape factor = 484 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 6.799 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 14,545 cuft Drainage area = 1.120 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 4.97 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 .M 5.00 4.00 3.00 2.00 1.00 BMP Post -Developed Hyd. No. 2 -- 10 Year 120 240 360 480 600 Hyd No. 2 Q (cfs) 7.00 .M 5.00 4.00 3.00 2.00 1.00 0.00 720 840 960 1080 1200 Time (min) Hydrograph Report 20 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 1.920 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 12,523 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 659.02 ft Reservoir name = BMP Pond Max. Storage = 7,770 cuft Storage Indication method used Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 Post Through Pond Hyd. No. 3 -- 10 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 3 — Hyd No. 2 FM i „� Total storage used = 7,770 cult 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.97 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Friday, Jul 9, 2021 Peak discharge = 1.755 cfs Time to peak 722 min Hyd. volume = 4,790 cuft Curve number = 61.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Post Developed - Pond Bypass Hyd. No. 4 -- 10 Year 120 240 360 480 600 720 840 960 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 24 Hydrograph Summary Rep 1 fydFaflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 8.479 2 722 22,249 ------ ------ BMP Pre -Developed 2 SCS Runoff 10.53 2 716 23,221 ----- - - BMP Post -Developed 3 Reservoir 9.177 2 718 21,185 2 659.29 9,110 Post Through Pond 4 SCS Runoff 3.913 2 722 10,254 - - ------ - — Post Developed - Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 -- - -- BMP Post -Developed 7 Reservoir 0.000 2 n/a 0 6 65700 0.000 1.0-in Storm Thru Pond Burl ington_Pond.gpw Return Period: 100 Year Friday, Jul 9, 2021 `ki Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 2.030 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 7.31 in Storm duration = 24 hrs Q (cfs) 10.00 1M N. 11 4.00 2.00 BMP Pre -Developed Hyd. No. 1 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 1 Friday, Jul 9, 2021 Peak discharge = 8.479 cfs Time to peak = 722 min Hyd. volume = 22,249 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 13.20 min Distribution = Type II Shape factor = 484 Q (cfs) 10.00 : es we] 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. v6.066 Friday, Jul 9, 2021 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Peak discharge = 10.53 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 23,221 cuft Drainage area = 1.120 ac Curve number = 89.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 7.31 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post -Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 12.00 — 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 2 41A Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. 10.00 es .M 4.00 2.00 Post Through Pond Hyd. No. 3 -- 100 Year 120 240 360 480 600 Hyd No. 3 Hyd No. 2 Friday, Jul 9, 2021 Peak discharge = 9.177 cfs Time to peak = 718 min Hyd. volume = 21,185 cuft Max. Elevation = 659.29 ft Max. Storage = 9,110 cuft Q (cfs) 12.00 10.00 W H. W 4.00 2.00 0.00 720 840 960 1080 1200 1320 1440 Time (min) ® Total storage used = 9,110 cult 28 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Autodesk, Inc. v6 066 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs 'Time interval = 2 min Drainage area = 0.910 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 7.31 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 1.00 w Friday, Jul 9, 2021 Peak discharge = 3.913 cfs Time to peak = 722 min Hyd. volume = 10,254 cuft Curve number = 61.8 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor - 484 Post Developed - Pond Bypass Hyd. No. 4 -- 100 Year 120 240 360 480 600 720 840 Hyd No. 4 Q (cfs) 4.00 3.00 2.00 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) I/ E kt 12 & ƒf � '^ ) f® § f# § | k | � 2� § i |z : k �%k!�■! I| � � | § � ■ S 2 7( ■ §� | � $�2 (` (| ■ § §�» k / � | �u Qr: p b oupaoo 41joH 'uong yg h*461H �N 'S OW r �h�� gg d d i N zo N 011 p gg co O pN N N O N J� 10 tL `Yr'J^1 V M W w 0 E Z N d CM 0 E U) 0 0 ui (D 0 IL d rn cc a p d C J N N N 4 O W o0 CDO C . (NO (NO (NO Q (O co (O 0 oY 0) CD u o o N M M M Z l0 C O O O > O O O a7 d ca M w Jt U U U p w � O y d d C N C Lo n L J y 7 a Z O d p o >> N c w ` V) v°i coo co co (o a� coo ti 0 J t/l ` 'i O C pO O C) 0�7 > p O U O W ` If u'> N (O to (O E'E o 0 0 _ .... to Lo ui o— c DU 0 0 0 p 3 o LL , E; O O 0 l p to — O O O C V O (oM c 0 CL _ nM 0)d ro 0 0 rn o> co ar C 0 N O M W E c M E a cc 00 0 a) J d ILO OOD 5 > co •' O 0 C Z W N O) I1 61 U N O J Z N M d 2 d rn cc IL It O ^ A W E E m r` cI L ^3 ♦W^ v / E L O -W / A c o i m d m n H C O CL O N N N N O C C Z W N Ul f0 C � C9 c �_ x (00 (00 (00 O O co N C N � f0 10 10 C C C J _ 0. - O M ((O, y = N (00 (0 CC) C O J C (00. O M 9 x a m ((°o (`°o z' d c 2 M J fA Q, rl-: O > J C W N IU)) ' ((00 co w (0 c CW L0 (O (tn f0D O O O C C O O O J LO 000 d C t U U U J N c E J VI D - II T L y C G w w lL C N (V O U N C J N E O 0 W u o N N - J U) a O C N U1 d' LL N U W c p a O z J Z N CO x & a U) c 0 . � m � CL E 0 � � � � V � CD m i � � � �(A M2 E (a 2 I q 7 § ■ 4 ° E S CN \ LU k \ \ \ \ 0 0 0 § § § § 2 3 0 0 0 0 » k G 3 Lu w . — 8 $ § coo 0 \ U £ % 2 » 6 a a \ \ \ r § m \ CL m 6 a o f p k 0 o 0 -J » 0 2 E m f E 0 0 o § _ § o CD — k \ B k _ § § 2 _ 0 0 0 ] £ 2 ) § @ 20 § / » G R k \ 02■ °°� § w co ._ W £ E § 0 / 6 6 6 / E ® E Q 2 » + a - w ■ ) ) . 4 k § § § - ( § cco o / / — - f _(D $ m coE§ ° k § 2 ��. 0 k \ / § @ S % o co 0 6 CY R R R / \ w w o e E . $ / f 9 » ƒ ) 2 § a n / k 5 , O O O O O O O (0 (V 00 0 0 N in �a U of M soul LO 0 N U 1 I in sU cc Z : U o � R' In UI inO l:u LO N 2 UI IIE4in 0 o 0 0 0 0 0 v V i O (o N CO 17 ((00 (r0 COO COO COO ((00 _N w Triangle Site Design, PLLC Dollar General Burlington, NC - Storm Drain "C" calculations Rational Runoff Coefficient "C" SD Cleanout#101 Drainage Area (ao cs1: 0 Parr posed Land Uses: Land Use Description Acres % Site Runoff "C" C. Roofs 0.00 #DIV/0! 0.95 #DIV/01 Asphalt/Concrete Pavement 0.00 #DIV/0! 0.95 #DIV/01 Lawn 0.00 #DIV/01 0.3 #DIV/0! Wooded 0.00 #DIV/01 0.2 #DIV/0! Tel al Area= 0.00 Cumulative "C" _ #DIVIO! 1 110= 7.09 Qio= #DIV/0! Drop Inlet#102 Drainage Area (acres) 0.20 Proposed Land Uses: Land Use Description Acres % Site Runoff "C" C. Roofs 0.13 65% 0.95 0.62 Asphalt/Concrete Pavement 0.06 30% 0.95 0.29 Lawn 0.01 5% 0.3 0.02 Wooded 0.00 0% 0.2 0.00 Total Area= 0.20 Cumulative "C" = 0.92 1 iio= 7.09 Qi o= 1.30 Drop Inlet# 103 Drainage Area (a Ms 0.23 Proposed Land Uses; Land Use Description Acres % Site Runoff "C" "C" Roofs 0.12 52% 0.95 0.50 Asphalt/Concrete Pavement 0.08 35% 0.95 0.33 Lawn 0.03 13% 0.3 0.04 Wooded 0.00 0% 0.2 0.00 Total Area= 0.23 Cumulative "C' = 0.87 1 no= 7.09 Q1 o= 1.41 W� �e o� 2�• '" c�.a Alunao eoucwM DUIIWPO 4NDN '"ouIVnB r [x'r 3 z = Z9 A-4BIH ONalry 'S O►►£ ¢ O U W � Ee �� y ■ '�Y Ig � � �■ 9 a � ��pp �s �€ �! Fg� P � @� HIM B �` ° .� I° 9 I !if if YI 1 py� IqE C •pY �IE gN" yp p+ I� I I i p r • • .c • R = tl ° ! ! r e R ! r e e r i e i 1 .s E " 9 g 9 r Z 1 Z � � z ID 5 Ira E ! € € 9 egl! q 11, 'if nul il I e e - - i EL O) O O N M 00 W C J I N N r N 4 _ O '7 17J OOD. W p 15 C I ; 0 ( (00 f00 c d) Cl) 'I o d M M M z o 0 0 > 0 0 0 W a co m J r U U U m y C_ O 10 0 N CN_ C a LO LO :3 a z a o >>_ �w.. 0 m can d coo LQ LO o J 1/1 v 0 O C O O O > O V 00 W " LO N N M M M d C c E 0 0 0 c oC) 0 0 0 G LL C y V O O O C m- O O O c ociw ro o uri � y c a a > a > a 5 w U U U d „ M co M to LO rn 0 c m � co m E c r — o 0 o E Q C C O O E OD a 0 C.E z W N N LL U N J z N M d E a It 0 CL � � � E E � cn � � � � cn E � 0 -W cn § N N N \ CLƒ ) ) � � � d \ ©. o£) U { a � 2 E_ k $ U I 2 S § c co co B■E § g e 2 - 6 6 2 d££ f & E co \ § $ § r k $ E z k § 2 § p c co c ; E § / § 2 2 - 6 6 )L § § § moo_ % 9 �w - § 7 § o e c = o ■ o 8 8 R o 8 § -i. ©°- §)£ » » 2 CL E $ § a # 7 $ ( LL n \ - § / E o CD CD 'ak k § \ ) ) A / 2p ƒ 2 = z n � � k; 2 6 a 2 0 7 0 ■ 4§ E u o § \ tm § Cl) L 2 \ � J § § \ f 60 0 3 § @ ® ) B @ R k — 0 0 0 L 2 g k) q w ©— 2 @ 2 c w c 6 6 6 § A k § § R E n n 5 $ J r G 2 k 6 6 0 E $ F co E k z c 6 6 0 -J > — co r- _ w £ § § § Gi c o c \ e $ c 0 0 § \ E § 9 § § Cl) § # E § \ 0 » _ �2■ E S 9 w e — § § § \ } £ @ 3 0 C) C) a k § § § § IV ¢ CA7 § \ § « £ a E F r $ E 0 — « _ 7 3 -)— co 9 @ © § § § § �■— $ k e E CD ` ° § ) § — E - / G ¢ k q § Cl) ^ 0 ) £ r LO 0 \ § ' z !_ a ( a n ƒ z 5 C Lb— O L CL L 3 cn E L O -W vI O O 0 O O 0 LO ((D ((O (NO (00 (�O (0 0 ln0 00'699 '13 'Aul 00'Z91 '13 w!2I £ :ul - 00'69+Z els LO CN 0 N N LO N N u1 0V999'13 'Aul ln0 0l'8S9 '13 'Aul 0919913 l3 wN 0 Z ul 00'ZO+Z elS N uO o L U O (0 In 0 of i N O O ul Ob'L99 '13 'Aul �1 ln0 Ob'LS9 '13 'Aul '13 09' l99 wN l :ul - 00'ZL+O els LO J 0 LO N = ul 0019913 'Aul OS'999 '13 'Pua0 Ilepn0 - 00,00+0 el5 0 0 0 0 0 0 0 _ > LOO LOO cr0 cr0 c(°O cCOo W Triangle Site Design, PLLC Dollar General Burlington, NC - Storm Drain "C" calculations Rational Runoff Coefficient "C" Catch Basin#201 Drainage Area (acres): 0.12 Proposed Land Uses: Land Use Description Acres % Site Runoff "C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 012 100% 0.95 0.95 Lawn 000 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.12 Cumulative "C" = 0.05 1 H O= 7.09 QIo= 0.81 Catch Basin#202 Drainage Area (acres). 0.16 Prgpased Land l es: Land Use Description Acres % Site Runoff "C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.16 100% 0.95 0.95 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.16 Cumulative "C" = 0:95 1 110= 7.09 Qic= 1.08 Catch Basin#203 Drainage Area (acres): 0.24 Proposed Land Uses: Land Use Description Acres % Site Runoff "C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.23 96% 0.95 0.91 Lawn 0.01 4% 0.3 0.01 Wooded 0.00 0% 0.2 0.00 Total Area= 0.24 Cumulative "C" = 0.92 1 no= 7.09 Qio= 1.57 w. J 4unoo eounworf omlao:) 4NM! •uolfiuIN^9 i F Yl z z Z9 A—gOIH 3H -S OM �' a dd8 9p o le 8 urrrga f`IA@liie5�i + 1 it ! ; -!i••"`aR aHIMiri����� = 1 iC Y E ulp 111H.1 11 P. I • d ! R R c R R R d R M A R ] Z Z Q gill evil i -• is j f @ it jig alr i111i Eli 3 \ NORTH AMERICAN GREEN CHANNEL ANALYSIS > > > rrasc Channelfll Name Grass Channel#1 Discharge 1.13 Channel Slope 0.0158 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density Good 65-79% Soil Type Clay Loam (CL) DS75 North American Green 5401 St. Wendel -Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECM DS v7.0 I Normal Permissible Calculated Safety Staple Phase Reach I Discharge I Velocity I I Mannings N I Remarks4 l J Depth Shear Stress Shear Stress Factor lPattern DS75 Straight 1.13 cfs 1.92 ft/s 0.35 ft 0.036 1.6 Ibs/ft2 0.34 Ibs/ft2 4.69 STABLE D Unvegetated Underlying Straight 1.13 cfs 1.92 ft/s 0.35 ft 0.036 1.74 Ibs/ft2 0.23 Ibs/ft2 7.69 STABLE D Substrate Triangle Site Design, PLLC Dollar General Burlington, NC - Grass Channel "C" calculations Rational Runoff Coefficient "C" SD Cleanout#101 Dralnage Area jacresl: 0.53 Pmvased Land Uses Land Use Des[riation Acres % site Runoff "C" 'C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.53 100% 0.3 0.30 Wooded 0.00 0% 0.2 0.00 Total Area= 0.53 Cumulative "C" = I ::(: 1 i1o= 7.09 Q10= 1.13 EROSION CONTROL CALCULATIONS EROSION CONTROL CALCS (RIP —RAP CALCULATIONS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Rio -Rap ADrD_a#1 Dollar General Pipe Diameter Pipe Slope Manning's number Flow Velocity Date: Date: Date: d= 15 s= 1.89 n= 0.013 Q= It 2 cfs V = 1.63 ff/s Dissipator Dimensions * Zone = Stone Filling Class = B Entry Width ( 3 X Do ) _ Length( 6 X Do ) _ Width (La + Do) _ Min. Thickness = Min. Stone Diameter= * All units are in feet ** Dissipator pad designed for full flow of pipe 3. 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches 41 7.5 * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Burlington 4/27/2021 Page 1 of 4 Rip —Rap Apron#2 Pipe Diameter Pipe Slope Manning's number Flow Velocity d= 15 s= 4.14 n= 0.013 Q= 2.71 cf s V = 4.12 ft/s Dissipator Dimensions * Zone = Stone Filling Class = Entry Width ( 3 X Do ) = Length ( 6 X Do ) = Width (La + Do) = Min. Thickness = Min. Stone Diameter= n 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches 7.5 0 1 * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Burlington 4/27/2021 Page 2 of 4 Rip -Rap Apron#3 Pipe Diameter Pipe Slope Manning's number Flow Velocity d= 15 s= 0.56 n= 0.013 Q= 3.46 cfs 4 V = 4.30 ft/s Dissipator Dimensions * Zone = Stone Filling Class = Entry Width ( 3 X Do ) _ Length ( 6 X Do ) _ Width (La + Do) _ Min. Thickness = Min. Stone Diameter= 3 B 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Burlington 4/27/2021 Page 3 of 4 Rip —Rap Apron#4 Pipe Diameter Pipe Slope Manning's number Flow Velocity d= 15 in s= 2.27 n= 0.013 Q= It 1.786 cfs 4 V = 1.46 ft/s Dissipator Dimensions * Zone = Stone Filling Class =: Entry Width ( 3 X Ao ) =- Length ( 6 X Ao ) Width (Lo + A,) Min. Thickness = Min. Stone Diameter= 2 3.8 ft 7.5 ft 8.8 ft 22 inches 6 inches 7.5 8.8 * All units are in feet ** Dissipator pad designed for full f RIP -RAP -Burlington 4/27/2021 Page 4 of 4 EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Skimmer Basin #1 Drainage Area 25-year Runoff (Qte) Surface Area Required Volume Required Sediment Trap Dimensions Dollar General RG Date: Date: Date: Total, AT= 1.56 Ac Disturbed, Ao= 156 AC C= 050 T. = 5 00 min I, = 774 in/hr 026 = 6.0 cfs SA = 325sf x 025 SA = 1,962 sf VR = 1800 cf/AC X Ao VR= 2,808 cf L = 75 ft (Spillway Length) W = 30 ft (Spillway Width) D = 2.0 ft (Depth of Storage) Side Slopes = 2 :1 L2 L,.= 83 ft Lb,t= 67 ft W� Vv_ W„P= 38 ft L,�= Wba= 22 ft L/W Ratio= 2 5 :1 (must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 361.00 (allow 1ft freeboard above spillway Flow height) Emergency Spillway 359.50 Sediment Storage 35900 Cleanout Mark 35800 (half of storage height) Bottom 357.00 Provided SAP= 2,250 sf > 1,962 VP = 3,724.0 cf > 2,808 Emergency Spillway - 25 Year Storm Iz, = 774 in/hr Q26 = 6.04 cfs h = 0.5 ft C. = 3 L.w= 10 It Calculate Skimmer Size Basin Volume in Cubic Feet 3,724Cu. Ft Skimmer Size 1.5 Inch Days to Drain* 3 Days Orifice Radius 0.6 Inch[es] Orifice Diameter 1.3 Inch[es] -in NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 75 30 Feet VOLUME 3724 Cu. Ft. Bottom dimensions in feet 67 22 Feet Depth in feet 1 2 Feet EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Project #: Designed by: Revised by: Checked by: Anti -Flotation Device Dollar General 4' x 4' Outlet Structure Area: 16.0 sf Top of Basin Elev.: 359.0 Bottom of Basin Elev.: 357.0 Volume: 32.0 cf Weight: 1997 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 2.396 Ibs Volume of Concrete Req'd: 16.0 cf Volume Provided: 69.5 cf Date: Date: Date: (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (4'x4' riser x 2.0' = 32cf, 5'x5' footing x 1.6=37.5cf) 4/27/2021 NORTH AMERICAN GREEN' CHANNEL ANALYSIS > > > Temporary Ditch#1 Name Temporary Ditch#1 Discharge 2.5 Channel Slope 0.0179 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Clay Loam (CL) DS75 ECMDS 7.0 North American Green 5401 St. Wend el -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Phase Reach Discharge Velocity Normal Mannings N Permissible Calculated Safety Remarks Staple Depth Shear Stress Shear Stress I Factor Pattern DS75 Straight 2.5 cfs 2.59 ft/s 0.49 ft 0.035 1.6 Ibs/ft2 0.55 Ibs/ft2 2.93 STABLE D Unvegetated Underlying Straight 2.5 cfs 2.59 ft/s 0.49 ft 0.035 1.74 Ibs/ft2 0.34 Ibs/ft2 5.15 STABLE D Substrate https://ecmds.com/projecVl39235/channel-analysis/202960/show 1 /1 4/27/2021 ECMDS 7.0 9 NORTH AMERICAN GREEN' CHANNEL ANALYSIS > > > Temporary Ditch#2 North American Green 5401 St. Wend el -Cynthia na Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 > Fax 812.867.0247 www.nagreen.com ECMDS v7.0 Name Temporary Ditch#2 Discharge 2.5 Channel Slope 0.0217 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Clay Loam (CL) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 2.5 cfs 2.82 ft/s 0.46 ft 0.034 1.6 Ibs/ft2 0.62 Ibs/ft2 2.57 STABLE D Unvegetated Underlying Straight 2.5 cfs 2.82 ft/s 0.46 ft 0.034 1.74 Ibs/ft2 0.39 Ibs/ft2 4.45 STABLE D Substrate https://ecmds.com/projecUl 39235/chan nel-analysis/202960/show# 1 /1