Loading...
HomeMy WebLinkAboutNCC214130_Site Plan or Location Map_20210715SW235g oaf bW a`;`QSOoS e° w o 0 0 SITE 3 c Aft L on a ne , 0( SR3R ; liar bI t ur Store rL Read d L�artO R r Aa SR 2759 r- S .lames Austin Road SR 2760 WL lbc Rom VICINITY MAP (NOT TO SCALE) o CONSTRUCTION SCHEDULE o �6� 1. Obtain all necessary permits and plan approvals. Erosion and Sediment Control a rJ{�r (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities i occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on site, preferably in a 4e���^Nti permits box, and accessible during inspection. 2. Install gravel construction entrances first, then silt fences, reinforced silt fence outlets and wattles. 3. Finish clearing and grubbing any necessary areas on the lots as they are started. 0 4. Begin lot grading and excavation activities 5. Begin or continue with house construction activities. a 6. Finish all rough grading and house construction. 7. Install driveways, walks and patios. z N S. Begin fine grading of lot areas � 9. Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot. g g, g g The silt fence will remain in lace until the lot is sodded or grassing is stabilized and takes hold. p g g 10. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and complete P p the following combined self -inspection form found on the DEMLR websitc https: //files.nc.gov/ncdeg/Energy%2OMineral%20and%2OLand%2OResources/Stormwater/NPDES%20 Genet-al%20Permits/DEMLR-CSW-Monitoring-Forms-Rev-August-S-2019.pdf. Twelve months of complete inspection forins shall be kept on site and available for inspection at all times. It is recommended a copy be kept in apermits box. (GS 113A-54.1 (e), 15A NCAC 0413.0131, NCGO1 Part III Sections A and B) 11. Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediatelv to maintain measures as designed. All ESC measures shall be maintained as specified in the pCIfUl et: Suall Visit, ueq.uc.g'UV/1N1_.lJV1 LU SUVIIIn all C1eU10I1101NUTACC 01 LCfll1111aL1011 (e-1NV l), A y)IVV annual general permit fee will be charged until the e-NOT has been filled out. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION Gravel Construction Entrance - The ravel ad should remain in a condition to prevent mud or sediment from leaving the construction site. This may require periodic to dressin with 2-inch stone. After each rainfall inspect an 9 p p 9 Y q p topdressing � p Y structure used to trapsediment and clean it out as necessary. Immediate) remove all objectionable materials spilled, washed or tracked onto public roadways. Y Y 1 p . . p Y Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly. Any sediment depose that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not wash back against the fence. Adequate storage volume should be provided for behind the fence at tall times. Take care to not undermine the fence during p cleanout operations. Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth and stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. Grassingand Mulching -The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been the area should be maintained a. g 9 9 9 p p Y Y p p p 9 9 placed, needed to insure that all areas are germinating properly. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass, then a temporary grassing should be used until the growing season permits the use of a permanent grass. General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect an of the installed erosion control measures. If lot construction dictates measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and ravel Y � p p 9 construction entrances will be maintained as suggested in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover. Wattles - Wattles shall be inspected after significant rainfall events. Rills or guillie upslope of the wattle and any undercutting is to be repaired. Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. Reinforced Silt Fence Outlet - Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet. Take care to avoid undermining the fence during cleanout. Remove and replace stone as necessary as it becomes clogged with sediment. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. 6'-0" MAXIMUM SILT FENCE FABRIC MINIMUM 10 GAUGE LINE WIRES INSTALLED TO SECOND 4WIRE MINIMUM 12-1/2 GAUGE FROM TOP INTERMEDIATE WIRES GRADE FRONT VIEW STEEL POST NOTE: WOVEN WARE FABRIC 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA SILT FENCE FABRIC DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. o 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO i� ILL SLOPE PROVIDE STORAGE VOLUME FOR THE NEXT RAIN N .r: AND TO REMOVE PRESSURE ON THE SILT i ;"' t' FENCE. •' n GRADE 6" MINIMUM COVER o OVER SKIRT * - I ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW A COUNT ORm CAROLIN STANDARD TEMPORARY SILT FENCE EFFECTIVE: O1/31/OS 4- MIN. SILT FENCE TOP OF SILT FENCE MUST BE AT LEAST t' ABODE WE TOP OF THE WASHED SttINE FRONT VIEW II BUTT WIRE FENCE. II D FILTER FMIRR�, AND STEEL FENCE POST IN TRRDWARE CLOTH W TRENCH STEEL FENCE POST SET MAX 2' MART WIRE FENCE ` HARDWARE CLOTH \\\\\ MIN. 1B' INTO SOn GROUND FILTER OF 5] WASHED S nLTER FABRIC $ ON GROUND pg° g �o o NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 0 I 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. BUM WIRE FENCE AND HARDWARE CLOTH I BUM , OF UPPER EOOE OF FILTER FABRIC IN TRENCH II D SECTION VIEW COUNTY ATH CARDIJN STANDARD SILT FENCE OUTLET EFFECTIVE: Ol/3l/OS TREE PROTECTION FENCE SII: L 1 F N CE (SEE NOTES) OUTLET SF SF t SILT FENCE l} 1} I 1 RIGHT OF WAY CONSTRUCTION ENTRANCE SILT FENCE OUTLET WATTLES TOP OF SWALE AS NEEDED ROADWAY i Nl ! Nl !� ��7RETURN SF-. - Dnn nTATnv EDGE OF TYPE A PAVEMENT OR CURB TYPE B LEGEND PLOW DIRECTION SF SILT FENCE T DIVERSION DITCH WATTLE TP TREE PROTECTION FENCE ® SILT FENCE OUTLET INLET PROTECTION DRIVEWAY PIPE CONSTRUCTION ENTRANCE AK couNT %F SF 1 1 boo 8' RLTURTN - SF- DnenwIv TYPE C ROADWAY TYPE D INLET N-/ it 4 W. 25' TREE AND VEGETATION PROTECTIO ONE � \ - / 17 1 7 DAY GROUND COVER --__ 1�64WHERE PIPES ---------- HAVE BEENyNSTALLED ry�� RIVEWAY`��``: N DITCH REINFORCED �x SILT FENCE OUTLET WATTLE I .. / CONSTRUCTION°o ENTRANCE M 'Y/,off 4L, S /Q90 16 J T r',q \ �� INFORCED Q �P S T FENCE CONSTRUC N OUTLET \ LIMITS WATTLE \ �O C NSTRUCTION� \QTTLE LIMITS \ 15 \ / o\ ® Q O��G� \ CONS RUCTION \O� ENTRA CE SILT FP� (TY P. f 6 + DRIVEWAY I SILT FENCE PIPE IN DITCH tit (TYP.) / WATTLE / \ t11 11t 111 1tt 11 111 1 i EXISTING ROADWAY i4bLIMlA� PINT 1Y WAK COUNTY VORI H (, ) I,, REVISED: 1/2/2020 / 111 I / 11 II 11 Itt CONSTRUCTION 111 / III III I III r\, LIMITS III III \ ROADSIDE iii I I I 5 DITCH \ III \ iii III \ D�/Nq III II DICHROADSIDE 14 III III III iii v0 iii `,Orp CONSTRUCTION / LIMITS \ �- III Lll III � III � O 111 Ill Z iii iii -20' DRAIN E ES MIT O 4 iii �, III / LULI / 7 DAY G UND COVER IN DITCH WHERE l i i ill x WATTLE E- PIPES HAV qZN INSTALLED0 11 I I CC3 III REINFORCED \ CONSTRUCTION iii I I 13 \SILT FENCOUTLET E A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1"IS AVAILABLE FOR USE. IT / CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT / SITE. RULE 15A NCAC 04B. 0131 STATES THAT "...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY / OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION / REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN." TYPE E INLET SODDING n» LAY SOD IN A STAGGERED PATTERN. BUTT THE STRIPS TIGHTLY AGAINST EACH OTHER. DO NOT LEAVE SPACES AND DO NOT OVERLAP. A SHARPENED BUTTING - ANGLED ENDS MASON'S TROWEL IS A HANDY INCORRECT CAUSED BY THE AUTO - TOOL FOR TUCKING DOWN THE MATIC SOD CUTTER MUST ENDS AND TRIMMING PIECES. BE MATCHED CORRECTLY. CORRECT 7y �\ I I I V�� I j y �� i I I hIIVI I I I III I. I III ROLL SOD IMMEDIATELY WATER TO A DEPTH MOW WHEN THE SOD IS TO ACHIEVE FIRM OF 4" AS NEEDED. ESTABLISHED - IN 2-3 CONTACT WITH THE SOIL WATER WELL AS SOON WEEKS. SET THE AS THE SOD IS LAID. MOWER HIGH (2"-3" ). APPEARANCE OF GOOD SOD SHOOTS - OR GRASS BLADES. GRASS SHOULD BE GREEN AND HEALTHY, MOWED AT A 2"-3" CUTTING HEIGHT. THATCH - GRASS CLIPPINGS AND DEAD LEAVES, UP TO 1/2" THICK. ROOT ZONE - SOIL AND ROOTS SHOULD BE 1/2" - 3/4" THICK, WITH DENSE ROOT MAT FOR STRENGTH. NOTES: I. If required by Wake County, tree protection fence shall be 6. These details are for only lots with disturbed area less than one installed along the rear property line when adjacent to riparian acre. buffer zones, wetlands and/or 25 ft. Tree and Vegetation 7. 1f the disturbed area is greater than one acre, a custom erosion Protection Zone. If the lot is subject to a municipal planning control plan should be submitted for the 15-day review cycle. The jurisdiction then the builder is responsible for verifying the plan should address berms/diversions and sediment traps and jurisdiction, p Y g P P applicable tree protection standards and for installation of tree basins. protection measures as required b the municipality. 8. If multi le lots share silt fence with none installed between the P q YP 2. Install silt fence on low elevation sides of each lot and install silt lots, a revised plan will be required. fence outlets shown on schematic/diagram and as needed. 9. Inlets downstream of disturbances should be protected, streets 3. Install required silt fence within 10 feet of property lines to should be swept as needed when sediment is present, and erosion ensure there is no conflict with septic system. It is the control measures removed or damaged by sub -contractors or responsibility of the builder to ensure septic system is not utilities shall be re -installed at the end of the work day. impacted by silt fence installation. 10. Details for silt fence, silt fence outlet, construction entrance and 4. It is the responsibility of the builder to ensure installation of other measures are provided on other sheets. erosion control measures does not impact septic system and 11. Erosion control details are not drawn to scale. repair areas. 12. If lots are contiguous and have different land owners, lots can not 5. Construction entrance should be installed for each lot and field share the silt fences. Each lot should have individual silt fences. located. �oRlllrneOLl' TYPICAL INDIVIDUAL LOT SEDIMENT & EROSION CONTROL MEASURES DETAIL EFFECTIVE: 4/15/19 LIMITS III O 006' DRIVEWAY III IL- iii CONSTRUCTION III X ENT NCE �TTLE \ PIPE IN DITCH iii IL REINFORCED w SILT FENCE SILT FENCE \ I > OUTLET TILE I x iii x (TYP.) iii w \ iii III x \ x�x� I w III / Q 3 III iii I WATTLE N II WATTLE \ REINFORCED / x iii III SILT FENCE / SILT FENCE CONSTRUCTION I iii III CONSTRUCTION OUTLET 12 x� x- (TYP.) ENTRANCE ENTRANCE \ x / - x x SILTCE z REINFORCED x� i i WATTLE O x SILT FENCE I I OUTLET WATTLE III III DRIVEWAY \ p I III III PIPE IN DITCH III III ji DAY GROUND COVER IN DITCH ERE _ 11 C)WATTLE I - iii III I �,7 IPES HAVE BEEN INSTALLED xJ w 2 i% I I I EW DRAY N a it it I/ IIIl PIPE IN DITCH 11 ~ O >1 /l i �x CO� STRUCTION LIMITS w SILT FENCE I/ ll �x (TYP.) �/ iii 7 DAY GR UND COVER IN DITCH WHERE PIPES HAV BEEN INSTALLED I LEI Q uJ w CONSTRUCTION ii iii if Z > \ ENTRANCE /ii z Q x /ii / LEI x } // (N LEI x\ /� CONSTRUCTION DITCH 0 LIMITS /i/ ' N DRIVEWAY PIPE IN DITCH 7 DAY GROUND ROADSIDE ��/ ;;' COVEIII IN DITCH WHERE 10 DITCH PIPES HAVE BEEN INS ALLED / DRIVEWAY PIPE IN DITCH 7 DAY GROUND COVER IN DI CH WHERE PIPES HAV BEEN INSTALLED 20DRAINAGE ' CONSTRUCTION 9 I ESM'T / �k` \ LIMITS DRIVEWAY /,� k PIPE IN DITCH 2 /ii' Rq/NgGFF 'GROUND COVER ENTRANCE CONSTRUCTION wo 'CH WHERE PIPES BEEN INSTALLED SILT FENCE if LINFORCED (TYP.) 7 ®k\SILT FENCE k OUTLET III x_ SILT FENCE WATTLE WATTL (TYP.) \x 111 � k J) iii 25 TREE AND VEGETAI7 �� x- WATTLE N PROTECx TION ZONE� III /III C) ROADSIDE CONSTRUCTION DITCH LIMITS 111111 Barbour Sure Road SR 2759 O N 'EINFORCE[ SILT FENCE OUTLET I I i BUT SUFFICIENT TO KEEP SEDIMENT ON SITE - N 2' ' 3" STONE TO BE USED i (SURGE STONE OR RAILROAD BALLAST) PLAN VIEW NOTES: L Install silt fence or tree protection fence adjacent to construction entrance to direct vehicles to drive on stone. 2. If mud is not removed from the vehicles traveling over the stone then the tires of the vehicles should be washed before entering e public ublic road or the construction entrance must be lengthened. Sweep streets immediately if mud is 10-FT MINIMUM OR tracked offsne onto public roads. WIDTH OF PROPOSED -v 3. Maintain construction entrance m a condition to prevent P DRIVEWAY WHICHEVER mud or sediment from leaving the site. Entrance will IS GREATER. require periodic removal of sediment -laden stone and replacement with fresh stone. hmnediately remove all mud/sediment/rock tracked offthe lot. 30'-0" MINIMUM NEW CONSTRUCTION CROSS SECTI❑N STANDARD RESIDENTIAL CONSTRUCTION ENTRANCE DETAIL GROUND STABILIZATION SITE AREA STABILIZATION EXCEPTIONS DESCRIPTION TIME FRAME PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES & SLOPES HIGH QUALITY 7 DAYS NONE WATER ZONES (HQW) SLOPES STEEPER 7 DAYS IF SLOPES ARE THAN 3:1 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 14 DAYS 7 DAYS FOR FLATTER SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) General Erosion Control Notes 1. Only the areas shown shall be disturbed. 2. All disturbed areas shall be grassed and mulched as soon as possible and maintained until pemanent cover is established. PAGE 1 of 2 \ TOTAL DISTURBED ACREAGE: 4.55 ACRES EROSION CONTROL FOR LOTS 2, 3, 6-8, 12, 13 & 15 5 IN T o J u"' AN S SUBDIVISION for Onsite Homes, LLC J MIDDLE CREEK TOWNSHIP WAKE CO., N.C. SCALE: 1 "= 100' MAY 2021 GRAPHIC SCALE 100 0 50 100 200 400 ENGINEERS PLANNERS IN I I I 'I 1 int h 100 H SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. MOORMAN, KIZER & REITZEL, INC. FAYETTEVILLE, N.C. PHONE (910) 484-5191 FAX (910) 484-0388 LICENSE #: F-0106 ST SAVED: 4/19/2021 5:07 PM LAST PLOTTED: 5/4/2021 9:20 AM PLOTTED BY: Dennis Gilbert FILENAME: G:\CURRENT JOBS\ONSITE HOMES\21-2724-02 ST JOANS-EC\PLANS\ST JOAN'S EC -LOTS 2, 3, 6-8, 12 & 13.DWG