HomeMy WebLinkAboutWQ0000889_Site Plans/Maps_20210714•
N 89+00
N 88+00
N 87+00
N 86+00
N 85+00
N 84+00
N 83+00
N 82+00
N 81+00
N 80+00
8
N
W
SPZ-4
SPZ-1
CPZ-lS
8
T
W
BARGE SUP
8
8
CPZ-2 ASPHALT
ROAD 1
\\ 1 WW- 6 SPZ-6
-5 B SPZ-5
8
8
r
T
W
CUT-OFF WALL
8
2
CIW-1 •
CWW-2
o• o �•SWW CWW4•
2B2C =CVYW3 i�_-
FERT-1
1
LI
S.P.A 11 0
PLANT 10
(REF) I 0
L _i L
I 1
OFFICE
CM1-2 •
00
0
ELI
8
A
W
• • sYyW-7-- 6SPZ-8
• o �
3A 3B3C
CWW-5 J OOCPW
CPZ-3
S SPZ-9
1
I s P.A . _�._�
1 PLANT
LJo
(REF)
CIW-3
CIW-4 •
O
CIW-5
•
1B 1A 1C
CIW-6 •
u
•CIW-7
0 \
-J ►
L
1
7
A.
8
W
8
W
0 100 200
SCALE 1 "=100'
LEGEND
• SWW CONFINED SAND LAYER WITHDRAWAL WELL
• CWW CROATAN FORMATION WITHDRAWAL WELL
• CIW CROATAN FORMATION INJECTION WELL
o EXISTING GROUNDWATER MONITORING WELL
0 EXISTING TEST WELL
di SPZ PROPOSED CONFINED SAND LAYER PIEZOMETER
CPZ PROPOSED CROATAN FORMATION PIEZOMETER
EXISTING CASTLE HAYNE AQUIFER UTILITY WELL
MONITOR WELL AND PIEZOMETER
LOCATION PLAN FOR PERFORMANCE
MONITORING OF REMEDIAL ACTION SYSTEM
Ardaman & Associates, Inc.
Consulting Engineers in Soils, Hydrogeology,
Foundations, and Materials Testing
TANK FARM REMEDIAL ACTION PLAN
Texasgulf Inc
eft aquitaine group
DRAWN BY:
FILE NO.
88-089
KJS CHECKED BY
APUEp BY:
DATE:
FIGURE
7-18-90
4-7
z/
N 89+00
N 88+00
N 87+00
N 86+00
N 85+00
N 84+00
N 83+00
N 82+00
(
N 81+00
N 80+00
N 79+00
N 78+00
N 77+00
i
8
N
T
W
BARGE SUP
ASPHALT
ROAD
CWW-4 • W-5
rc,5
PIPERACK SPILL CONTAINMENT PAD
S.P.A I 0 r -
(REF) 10
L-
L
8
8
T
W
8
IJJ
CROATAN FORMATION
WIT'FIDRAWAL WELL
(TYPICAL)
CWW-6 CWW-7
8
OFFICE
8
co
CROATAN FORMATION
INJECTION WELL
(TYPICAL)
0
0
CO
POTENTIOMETRIC SURFACE
ELEVATION IN CROATAN FORMATION
(FEET, MSL)
0
SCALE
100
200
1"=100'
PROJECTED POTENTIOMETRIC SURFACE MAP
OF CROATAN FORMATION DURING OPERATION
OF REMEDIAL ACTION SYSTEM
Ardaman & Associates, Inc.
Consulting Engineers in Soils, Hydrogeology,
Foundations, and Materials Testing
TANK FARM REMEDIAL ACTION PLAN
Texasgulf nc
elf aquitaine group
DRAWN BY:
FILE NO.
88-089
KJS I CHECKED BY141
APPROVED BY:
DATE: 7-18-90
FIGURE
4-5