Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20070808PCS Phosphate AURORA PCS PHOSPHATE COMPANY, INC. P.O. BOX 48, AURORA, NC U.S.A. 27806 August 3, 2007 Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management CERTIFIED MAIL Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report May 2007 — July 2007 Injection Well Permit #WI0700012 Tank Farm Remedial Action System Beaufort Co. Dear Qi: RECEIVED /DENR/DWQ AQUIFER PRnTPrTIC)N SECTION AUG 0 8 2007 Please find the subject groundwater monitoring report attached. This includes the sampling and reporting requirements of the above referenced permit, Part V, Section B 1 as well as the reporting requirements of the overall Tank Farm Remedial Action Plan. Enclosed are: a) Form GW-59 for injection well CIW7 and monitor well MWTF1 CR, b) piezometer level monitoring field sheet, and c) the summary operational and maintenance report. Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, D. Daniel Winstead Ill Environmental Engineer PCS Phosphate Attachments Pc: Will Hart — Aquifer Protection DWQ, WaRO (w/ attachments) R. M. Smith/12-07-02 (w/ attachments) T. S. Ingra - Ardaman & Assoc. (w/attachments) R. A. Allen (w/ attachments) W. A. Schimming (w/ attachments) Anthony Shrewsbury (w/ attachments) R. B. Lee (w/ attachments) i i Qw - C �r-F� e� f 1� Total Two Copies Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management \\aurdata2\users\AUR1DDW\Reports\2007\Quarterly\TFRAS Report Second Quarter 2007.doc 2 T GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. -Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled et. e.mn Well Identification Number (from Permit): MWTF1-CR Well Depth: 42.00 ft. Well Diamter: 2 inch Screened Interval: 38.70 ft. to 40.70 ft. Depth to Water Level: 14.19 ft below measuring point. For Groundwater Treatment - Sys erns Check One: Influent (98) Effluent (99? Measuring Point is 3.95 ft above land surface. MILILITERS of water pumped/bailed before sampling: 2100 Field Analysis: pH 7.1 , Specific Conductance 699 uMhos Temp. 25.4 oC, Odor NONE Appearance: CLEAR DEPARTMENT OF ENVIRONMENT'& NATURAL RESOURCES WATERQUALITY. DIVISION, GROUNDWATER, SECTION 1636 MaiIService Center' - RALEIGH'NC`2763� 1636 Phone (919)733-3221 PERMIT#: WI0700012 Non -Discharge X NPDES EXPIRATION DATE: UIC - 01/15/08 TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: 7/17/2007 7/17/2007 to 7/18/2007 . PCS PHOSPHATE and ENVIRONMENT 1 Certification No(s) 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A mg/I Coliform: MF Fecal N/A /100m1 Coliform: MF Total <1.0 /100ml (Note: Use MPN method for highly turbid samples) Dissolved Solids: Total N/A pH (when analyzed) TOC Chloride Arsenic Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A mgfl units mg/I mg/I mgfl mg/I mg/1 mg/I uMhos mgfl mgfl Yes Nitrite (NO2 as N) Nitrate (NO3 as N) Phosphorus: Total as P Orthophosphate Al - Aluminum Ba - Barium Ca - Calcium Cd- Cadmium Chromium: Total Cu - Copper Fe - Iron Hg - Mercury K- Potassium Mg - Magnesium Mn - Manganese n/a No and field acidified Yes n/a No ) N/A mgfl Ni - Nickel N/A ug/I N/A mg/I Pb - Lead N/A ug/I N/A mgfl Zn - Zinc N/A ug/I N/A mg/1 Ammonia Nitrogen mg/I N/A ug/I Other (Specify Compounds and Concentration Units) N/A ug/I Fluoride NIA mg/I N/A ug/I MIBK N/A ugA N/A ug/I Ag - Silver N/A ug/I N/A ug/I Se- Selenium N/A ug/I N/A ug/I Sodium N/A ug/I N/A ug/I Organics: (GC, GC/MS, HPLC) N/A ug/I (Specify test method #. Attach lab report.) N/A ug/I Report attached? Yes (1) No X. (2) N/A ug/I VOC method# N/A ug/I . method# method# I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 3/2000 Ross M. Smith - Manager, Environmental Affairs Permi (o ut onz Agent) and Title - Please type or t PP3/7 Signature of Permittee (or AuthoHzed Agent) (Date) GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 3 Well Identification Number (from Permit): Well Depth: 48.00 ft Well Diamter: CIW-7 Screened Interval: 31.00 ft. to 45.25 ft. 4 inch Depth to Water Level: N/A ft. below measuring point. Far Groundwater Treatment Sys ems Check One: NInfluent (98) Effluent (99) Measuring Point is N/A ft above land surface. GALLONS of water pumped/bailed before sampling: CONTINUOUS Field Analysis: pH 7.2 , Specific Conductance 647 uMhos Temp. 23.2 oC, Odor NONE Appearance: CLEAR DEPARTMENT OF ENVIRONMENT 8,NATURAL RESOURCES tWATER QUALITY DIVISION, GROUNDWATER SECTION 1636 Mail iService Center RALEIGH; NC 27699 1636 : PERMIT #: WI0700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation lone (919)733 322i EXPIRATION DATE: UIC X 01/15/08 Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: 7/17/2007 Date sample analyzed: 7/17/2007 to 7/18/2007 Laboratory Name: PCS PHOSPHATE and ENVIRONMENT 1 Certification No(s) 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A mg/I Nitrite (NO2 as N) Coliform: MF Fecal N/A /10om1 Nitrate (NO3 as N) Coliform: MF Total <1.0 /100m1 Phosphorus: Total as P (Note: Use MPN method far highly turbid samples) Orthophosphate Dissolved Solids: Total N/A mg/I Al - Aluminum pH (when analyzed) N/A units Ba - Barium TOC N/A mg/I Ca - Calcium Chloride N/A mg/I Arsenic N/A mg/I Grease and Oils N/A mg/I Phenol N/A - mg/I Fe - Iron Sulfate Specific Conductance Total Ammonia TKN as N Cd- Cadmium Chromium: Total Cu - Copper N/A mg/I Hg - Mercury N/A uMhos K- Potassium N/A mg/I Mg - Magnesium N/A mg/I Mn - Manganese • Yes n/a No and field acidified Yes n/a No ) N/A mg/I N/A mg/I N/A mg/I N/A mg/I Ammonia Nitrogen N/A ug/I Other (Specify Compounds and Concentration Units) N/A ug/I Fluoride N/A ug/I MIRK N/A ug/I Ag - Silver N/A ug/I Se- Selenium N/A ug/I Sodium N/A ug/I Organics: (GC, GC/MS, HPLC) N/A ugA (Specify test method #. Attach lab report) N/A ug/I Report attached? Yes (1) No X (2) N/A ug/I VOC method# N/A ug/I method# . method# Ni - Nickel N/A Pb - Lead N/A Zn - Zinc N/A N/A N/A N/A N/A N/A ug/I ug/I ug/I mg/I mg/I ug/I ug/I ug/I ugA I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 3/2000 Ross M. Smith - Manager. Environmental Affairs Permitte .ff Auutthoorizedd ent) Naammy,(a9Q Titles- Please type or opt Signature of Permittee (or Authorize Agent) (Date) PCS Phosphate Co., Inc. - Tank Farm Remediation System Quarterly Monitoring Date: 17//6147 Time: Tech: 73/ee System Oauge Pressures sW W-1 . T74767. sW W-7 ..L170t- CWW-1 �i JO29.. CW W-7 -7724a.. Fle:12-07-02 pe: TLB Re/ewce Pohl I. Lead Rel to k6L Ditch 12.81 Barge Slip 10.59 D-68 Water Level Control Tank % = MSL .�12efff.. Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOO Ste Wtr Level' -J Level Relative To MSL Ft Well ID TOC Elevation MSL' TOC Stc VW Level' Level Relative To MSL FL ' Spz-1 10.47 . g. 94 / , 7 1 Cpz-1 10.51 /of. t?g e% ._ /�3 Spz-2 1121 h; nG, a �s Cpz-2 10.25 /t�f. vb -a. 0S Spz3 11.87 (720 //, 6 7 Cpz3 11.12 O. /S ' / o Spz-4 11.45 //J, r4la . h-:, CPW 9.65 // fl -a. /8 Spz-5 11.45 9, 30? 0,1. //3 MWTF-1A• 14.35 C . 9 a / Spz-6 1123 /,�.aR Lam .9.5 MWTF-1B• 14.36 //j7 J.7D CS,96, 6pz-7 11.59 9 9/ 7.. 68 MwTF-1C• 14.44 /4/Q. 0, s Spz-8 11.57 Q.1z , . 1/4J-Y MWTF-2A 14.05 �J 586 g ✓y spz-9 11.01 '3 7, A14" (.3, /7 MWTF-2B 14.02 //)./O/J '// d Spz-10 12.16 (!/, 9L) 6:,.,2lG? MWTF-2C 14.08 /6./5- -4D9 SPw 9.95 7F6 og.5'9 MWTF3A 1221 d�j/7/, 879 _ - - - MWTF3B _. / -9t 477,296? 12.18 MWTF-3C 12.19 /`T. ga -,7O/ Sand Layer And. Croatan Formation Withdrawal Wells Well ID TOC Elevation MSL' Max Ste _.. Wtr Level Ft. Pump Activation Depth Rel MSL Max Level Relative To MSL Ft. Control Point MSL' Is Well Pumping? (Y)ess/(N)o Comments SWW-1 10.70 //."5 s 3•86 +1'to+2' Ye. cwW-1 10.60 y,&S 9' -y %S -2'to -1' SWW-2 9.99 3 6' .� C ? +1'to+2' re YP°/ CWW-2 1023 l9- `Y . A�/ 9' -Lf�/9 -2'to-1' /1)0 sww3 9.97 ''7/ /y9� 6' f/ , +1 'to+2' Yleo CWW3 9.95 y.o/O 9' -'y. %rR -2'to-1' NO SwW-4 1on 9,09 e 09 +1'to+2' lie e/ CWW-4 10.73 /o .03 9' -2'to-1' NO Lase/Z;„GFrefeQ SWW-5 10.80 /i .Det 6' +1 ' to+2' }9(' S LI'e//i e /PO,t. CWW-5 10.74 r./o 9' -2'to-1' //00 lege/ /hz, /cot sWw-6 10.66 g: 99 e -0. 0/ +1'to+2' YP% CWW-6 9.92 /?? •eg 9' -2'to-1' lOe /e e//4-E/49/ug996o/ SWW-7 10.70 6. /8 6' D, ../O +1'to+2' Gt2o CWW-7 9.95 Y. 6,�c 9' -4/36' -2'to-1' M?O Revised 729/02 • Riser length added to TOC elevation 1/24/97 D:\Data%Foens Well Fotm\TankPann Remed Welislds PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN OUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS May 2007 — July 2007 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Infection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: R Y V 'yct: f� k p,^, ✓N� y 1�? try M e Vy "+. S2 \, DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL May 1,128,870 0 1,128,870 25.3 15.0 June 1,246,822 0 1,246,822 28.9- 15.0 July 1,062,026 0 1,062,026 29.5 15.0 TOTALS 3,437,718 0 3,437,718 \\aurdata2\users\ADR1DDW\Reports\2007\Quarterly\TFRAS Report Second Quarter 2007.doc 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: fi=C'n.6 5kl Y .� ' ;Yf i YV. £S R YT M RS'F �,PYjs .Y Y.FeI C t i>I 5 Ii SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM May 250,400 17,691 268,091 6.0 June 259,820 14,709 274,529 6.6 July 273,084 13,033 286,117 6.4 TOTALS 783,304 45,433 828,737 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the fourteen well system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps All Pumps were flushed on 5/1, 5/11, 5/25, 5/30, 6/29, 7/10, 7/18 and 7/26. SWW-1: On 6/30 reset counter. On 7/11 reset counter. On 7/17 rebuilt pump. S W W-2: On 7/6 rebuilt pump. SWW-3: SWW-4: On 5/21 back washed. On 5/29 changed pump. On 7/19 reset head. SWW-5: On 5/17 changed counter. On 7/12 cleaned pump. SWW-6: SWW-7: \\aurdata2\users\AUR1DDW\Reports\2007\Quarterly\TFRAS Report Second Quarter 2007.doc 4 • • Croatan Formation Withdrawal Well (CWW) Pumps CWW-1: CWW-2: CWW-3: CWW-4: CWW-5: CWW-6: CWW-7: \\aurdata2\users\AUR1DDW\Reports\2007\Quarterly\TFRAS Report Second Quarter 2007.doc 5