Loading...
HomeMy WebLinkAboutWQ0042500_Application (FTSE)_20210525Central FileS AP5 — SV P 516l2021 Pt4tmlt �iurjber VVQ0042500 Permit Tracking Slip Program Category status Project Type Nan-dlscha,qg In review New P(OlOCt permit Typs Version Permit CiassHicatlon raw"ty gar Extension Pump Statons & Pressure Sewer Extensions A lndivrduai PrirWry Raviewar hrler taenson Cciastal sWRule Permitted Flow Facility Permit Contact Affiliation Facility Name Major+Minor Region Old MIIi 5ubdivisian Minor WIrnmgVr County Location Address Brunswick Facility Contact APfilration CWTIer Owner Name Owner Type 9runswicic Regronal Waver and Sewer H290 Government - County Owner Affiliatiorl RoWrt Walker PO Box 2230 Dates'Events Leland NC 284S'22 Scheduled Ortg Issue App Received Draft Initiated Issuance Public Notice lssue Effective Expiration 5+5i?'02t - - -. ._. Go.,.x*nri il7arniutart FvarttR _ W Coastal Land Design, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management P.O. Sox 1172 Phone: 910-254.9333 Wilmington, NC 211402 Fey: 910-254-OS02 www.cldeng.ccm To; NCi)FQ-D WR 127 Cardinal Drive Extension Wilmington, NC 28405 (910)796-7216 Attu: Dean Huakele CGEIV MAY 0 5 2021 r Date: May 5, 2021 File; 986-02 Subject: Fast Track rApplicatians Old Mill Subdivision ❑ As Requesled ❑ For Your Files ❑ For Distribution ®For your Review f Action! Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. ilewription 1 Original Submittal Cover Latter T Check In the Amount of $480,p4 1 Original Fast Track Sewer System Extension Application (PTA-04-16) t Original Flow Tracking/Acceptancc for Sewer Extension Application (FTSE 10-18) Signed by Brunwick Regional Water and Sewer l Original Flow TrackinglAceeptance for Sewer Extension Application (FTSE 10-18) Signed by Brunswick County Original Supplemental USGS and Street Level Maps 1 Copy All Items Listed Above Remarks Please contact our office should you have any questions or concerns. 'Thank you. CC: File C a Design, PLLC Client Signed lay R. Carmine„ P> Coastal Land Design, PLLC Civil Engineering;Landscape Architecture Land Planning?Construction Management May S. 2021 NCDtQ 127 Cardinal Drive Extension Wiltnington, NC 28405 (910) 796 — 7216 Re- Fast Track Sewer System Extension Application for the Old Mill Subdivision Old Mill Subdivision is a planned subdivision located on approximately 44-acres in Brunswick County, North Carolina. This project is proposed to contain 68 single-family residential lots: each with the NCDEQ-approved flow reduction allocation of 210 gallons per day (gpd). The total daily design flow is 14,280 gpd_ This project will be serviced by the extension of gravity sewer system and one centralized pump station that will discharge sewer into an existing Brunswick Regional Water and Sewer (H2GO) sewer manhole located on the east side of Nester Court. The proposed pump station is designed to service all the residential Lots at 210 GPD. Included with this submittal are provided below. The application fee was submitted with the original submittal. + H. Cover Letter (This Sheet) * C. Application Fee ($480.00) • D. Fast Tracts Application (Farm: FTA 44-16) • E. Flow Tracking/Acceptance Form- FTSE ]0-18) + F. Site Maps (USG5 Topographic Map and Street Level) If you have any questions or need any additional information, please feel free to contact our office. Very Respectfully, ti,tll±,�yi1�1f/ Z-.�'O� ?..7 19 f �rj� IWC Jay Carmine, P.E. Project Manager cc: File P.O. Box 1172 Wilminglon, NC 28402 Phone 7910-254-9333 Fax;910-254-4542 ww►y.CLDeng_com Male of North ('arrolina DWR Department of Environmental Quality Division of Water Remources IiA NCAC 02T.0300 — FAST TRACK SEWER SVS't'I'.M 1EXTE NSION AP111,11 'ATIUN D41,1I10on of Ulster R[LOrIKES I'1'h 04-16de SUPPORTING [IUCUM!':N'1'A'f'I{}N Application Number Ionhc cnpnpar,rd by DWRI All Yerns must be om I t d or 1bg apullication will he returned I. APPLICANT INFORMATION: I. ApplicanPs name: Brunswick Resdonal WaLer mind cwcr i1I2601(company, municipality, IIDA, utility, etc.) 2. Applicant type: ❑ Individunl ❑ Corporation ❑ General Partnership ❑ PrivntelyOwned Public Utility ❑ Federal ❑ Statdcounty ❑ Municipal ® Olhcr 3. Signature authority's namc: Bob Walker. per 15A NCAC QT A 1061 a} Title: Exmufive 4• Applicant's mailing address: P.Q. Box 223 City: Ian State: a. Zip: 2$45I ., 5. Applicant's contact information: Phone number: (910) DI-24 Email Address; walkcr(rt)h2gvoalinc.wm H. PROJECT INFORMATION: 1, Pwiect name: Old Mill Subdivision 2. Application-+Projcct status: ® Proposed (New Permit) ❑ Existing Permit/Proicct If a modification, provide the cxiscing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQDO 3. County where project is located: f unswick 4. Approximate Coordinates (Decimal Degrecs): Latitude: 24.2578° Longitude: -78.019h° 5. Parcel ID (if applicable): 0290012901 (or Parcel ID to closest downstream sewer) IIL CONSULTANT I-NFORMATION: 1. Professional Engineer Jason R_ Carmine License plumber- 033196 Firm: Coastal Land Nsi n PLLC Mailing address: P.O. Box 117d City: Wilminfacn State: hC Zip: 28402-_ Phone number: (2LO) 254-2131 Email Address: icarminc u.cldeng_comm IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: L Facility Name: " e'-si l W wT Permit Number; Ak Uo$ (a !B 19 Owner Name: 3—B&Swlcf w Y V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): L Permit Numbcr(s): WQ 001W5w(K.) Downstream (Receiving) Sewer Size: 8_ inch Systcm Wide Collection Sysiesn Permit Number(s) (if applicable): WWS c)O.W2 Owner N amc(s): 5G-o FORMFTA U 16 Page 1 of 5 GENEPAL REQVIREMENTS 1. lfthe Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ❑NIA If the Applicant is a Developer of tots to be sold, has a 20SJopj;f s Operslional. Aurcemcott. [FORM: DE VD been attached? ❑ Yes [:]No ®NIA If the Applicant is a H m f}wn rs' eiatiMAas a ti nal A reemcnl I F 10A been attached" ❑ Yes []No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential OAmcd ❑ Rcuil (stores, centers, malls) ❑ car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool I day care ❑ Medical / dental / veterinary facilities El5wimming Pool !Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Fitter Backwash ❑ Businesses I offices I factories ❑ Nursing Home [] Other (Explain in Attachment) S. Nature ofwastewater : 1Q°Ao Domeslic/Commercial °Y4 Commerciat _ % Industrial A 03 0 } "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow rc"clion been approved under 15A NCAC 02T .4114if1? ® Yes ❑ No Y if Yes, provide a cour of flog►• reduction xnoroval letter 7. Summarize wastewater generated by project: Establishment Type (see t12T.0 Ill 4a Daily Design Flow" 140, of Units Flow Old Mill Subdivision 210 gallday 68 E4,290 GPD gall GPD gal/ GPD gaff GPD gall GPD gau GPD Taro! 14,280 GPD a See 15A NCAC 02T .0114ib1- (d). (c)(1) and fe3(2) for caveats to wastewater design flow rates (i,e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or cast of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G-S_.42A }. b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NC.A(7 i12T,01 141 shall be determined using available flew data, water using fixtures, occupancy oroperation patterns, and other measured data. R. Wastewater generated by project: 14,28fi GPI? (per l iA N `AC 02T .0114 Y Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this Zinc ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or reptacement of existing sewer with no new flow expected ❑ Other (Explain). FORM: FTA 04- l6 Page 2 ors Vlt. GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02T .0305 & ti1DC Gravity- Sewers 1, 5ummarixc gravity sewer to be permitted: Size (inches) Length (feet) Material 8 3,254 PVC > Section Il & III of the IVIDC for Permitting of Gravity Sewers contains information related to design cntena > Section III contains information rclaied to minimum slopes for gravity scwer(s) Y Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PIMP STATION DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC jPump StationslForce Mains COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: I 2. Approximate Coordinates (Decimal Degrees): Latitude: 34,2548' Longitude: -780217' 3. Design flow of the pump station: 0.01428 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 142 gallons per minute at 24 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 4 261 PVC G. Power reliability in accordance with l5A NCAC 02T .0305(h)(11: ® Standby power source or pump with automatic activation and telemetry -I SA NCAC 02T ,0305(b)(l)(H)_ > Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - I SA NCAC 02T .0305(h)(1 )(c) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1 (C"). It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. i> If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of5 SETBACKS & SEPARATIONS — (02H .02110 & 15A (NCAC 02T .0305(i)]: 00 1. floes the project comply with all separations found in 15A NCAC 02T .0305 Y 15A NCAC 02T 0305 costa' ® Yes ❑ No ins minimum se orations that shall be provided for sewer Setback Parameter* systems: Se aration Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines Ivertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including arty wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet "'Waters classified WS {except WS-1 or WS-V), B, SA, ORW, HQW, or SU from normal high water or tide elevation and wetlands see item IX.2 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches Any building foundation 10 feet 5 feet Any basement 1 a feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vcrticall 36 inches > 15A NCAC 02T.0305contains alternatives where separations in 02T-0305(f) cannot be achieved. A "Stream classifications can be identified using the Division's NC Surface Water Classifications wcb a e ➢ If noncompliance with 02T.0305(f) or-W. see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ➢ See the Diviision's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction 9 As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per I5A NCA0_0.28_,0200? ® Yes ❑ No Y This would include Trout Buffered Stt+eams per I SA NCAC 213.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? G] fires [] No > Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ]• Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c){6l (additional permnitslcetliftcations)? ® Yes ❑ No Per 15A NCAC 02T.0105L IL6_), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). G. Does this project include any sewer collection lines that arc deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No Y if yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall he inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04- 1 b Page 4 of 5 CERTIFICATION& I Does the submitted system comply with .l S� O2i, the Minimum Design Crileria I'M Ih I Pc tti f m t� n and Force Mains flatest version), and the Gravit vcr Minimum Dcsi n Criteria lac t Ve i as applicahle? Yes No If No, complete and Submit the Variance/Alternative Design Request application (VARC I n-14) and supporting documents for review_ Apwroval. of the reguest is re ulred prior to submittal of the F>tst Track A ticatia, and su nrtin documents. 2. Professional Fnginoer's Certification: Jason R. cisZrmlll P attest that this appli"ion for T {Professional Engineer's name from Application Item rpi has been reviewed by me and is accurate, complete and consistent with the info rrnatiosr supplied in the plans, .hat to the best enginrmeting caleulalions, and all other supporting documcntation to the best of my knowled fu her tGtavi y�Sewcr of my knowledge the proposed design has been prepared in accordance with the applicable Minimum Design Criteria for Gravity Sewers (latest vcrsion), and the Minimum f}csign Criteria for the Fasten portion�f (his of pump Stations and Force Mains (latest version). Although other prOfcssianals may have developed certain portions submittal package, inclusion of these materials under my signature and sea] signifies that r have reviewed this material and have judged it to be consistent with the proposed design, any person who knowingly makes any false NOTE — In accordance with General Statutes 14 - and l4 2 6 statement, representation, or ccrtification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine nut to exceed S 10,000, as well as civil penalties up to s25,000 per Violation. North Carolina Professional Engineer's seal. signature, and date: 3. Applicant's Cenifi ation per 15A NCAC 02T .01 t}4(b}: {Signature Autharir or 's name & title from Application Item 1.3_) �uII, I NI,rll,t fti CAR SEu = � 4r ate: �62'i'�4.22 09:28:11.04'0o' ......... that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. [ understand that any discharge of wastewater from this non discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - [n accordance with Caeneral Statutes 143-215.6A and 143-215.6B, any pemn who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000 as well as civil penalties up to $25,000 per violation, Si�aiurc: r _ FORM: F'TA 04-16 Date: S" 3 r 2' 1 Page 5 of 5 I I'1`3L IU-1K Stale of North ('arvelina (<wcr Extension ply Mp:trlinrnl of Eavironnienial Qtjalits Division of Water lies❑urce WR t3tvi41an of Water Resources rt Flow Trackingfor SExtiApplications I'muly Requesting Allocation: Brunswick Regional Water & Sewer Project name for which flow is being requested: [old Mill `subdivision ,Hare than one F UE treat' be required for a xrugle praferr tf race owner of roe Ft 117f A nor responsible fur all pump srarlom along the roure of the proposed wastewater flow, L Complete this section only ifyou are the owner of"the ►vaslewatcr trealntent plant. a. WWTP 1=acility Name: northeast Rc ional WW-1 P b. WWTII Facility Pemtit #: NCO086819 Aft lows are in MGD C. W'NVVP facility's perntiticd flow d. Estimated obligated flow not yet tributary to the WWTP c. WWTI' facility's actual avg. flow f. Total flow for lhis specific request 0,014280 g. Total actual and obligated flows to the facility h. Percent ofpermilted now used I1. Complete this section for each pump station you are responsible For along the route of this proposed wastewater now. List pump stations located between the project connection point and the WWTP: Pump Pump Station Station Firm (Name or Permit Capacity,' Number) No. MGD 701dMill nOO16854(M) .605 (A) (11) W1 ID}=[8fC] (EMA-D) Design Approx. Average Current Obligated. Total Daily Avg. Not Yet Current Flow" Daily Tributary Flow Plus (Firm I pf), Flow. Daily Flow, Obligated Available MGD MGD MGD Flow Capacity"" ,242 034 .031 .065 .177 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pr) not less than Z S, per Section 2.02(A)(4)(c) of (lee Minimum Design Criteria. *** A Planning Assemment Addendum shall be attached for each puttip station located between the project connection point and the V4'4 TJ1 where the Available Capacity is r U. Downstream Facility Name (Sewer): Brunswick Rc Tonal Water Sewer Downstream Permit Number: WQ0016854(M) Page I of 6 FTSE 14-18 ■ IIL Certification Statement: 1=30b Walker _ certify to the hest of"my knowledge that the addition of the -valtrme o1`wwastewater to be perrnitted in this project has beCtt evaluated along the Toole to the receiving* waste,w-ater trcatmem facility and that the flow front this prod ct is not anticipaled to cause any capacil}, related sanitary sewver overflows or overhurden any dowvnstrcam Pump station cu route to the receiving treatment plant under normal circuntsiances, given the implentcntation of the planned improvements identified In the Planning assessment where applicable. This analysis has been perforined in accordance Willy local established petlicics and procedures using the heist aivailabic data. This certification applies to those items fisted above in Sections 1 and 11 plus all altached planning assessment addendurns 1'or which f am the responsible party. Signature of this form cerlifics that the receiving collection system or treatment works has adequate capacity to transport and treat the pmpowd new wastewater. 4 Sfgrttr� C]It•ral �t�rlrt� G Title of Signing l)ffidol Page ? o f 6 S-atet Mitre' FTSE 10-18 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSL, 10-18) Entity Requesting Allocation: Brunswick Regional Water & Sewer Project Name for which flow is being requested: Old Mill Subdivision More than one FTSE trray he required for a single project if tfre owner of Me WWTP is not responsible for all pump stadotes along the route of the proposed wmlewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: NORTHEAST BRl1NSWK:K REGIONAL WWTF b. WWTP Facility Permit #: —WQ 0086819 Alf flows are in AfGD c. WWTP facility's permitted flow 2.475 d. Estimated obligated flow not yet tribulary to the WWTP 1,08063 e. WWTP facility's actual avg. flow 2.014 f, Total flow for this specific request 0.014280 g. Total actual and obligated flows to the facility 3.1099 h. Percent of permitted flow used 125.6% — Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (g) (C) (D)=(H+C1 (E)-(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow" Current 'Tributary Flow Plus (Name or Permit Capacity,(Firm 1pf), Avg, Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MOD MGD Flow Capacity`** * The Firm Capacity (design flow) of any pump statinn is defined as the maximum pumped fllrn that can he achieved with the largest pump taken out ofscivice. ** Dcsign Average Daily Flow is the Firm capacity of Ilie pump station divided by a pealing factor (pf) not less than 2.5, per Section 2.t12(A)(4)(c) of the Minimum Resign Criteria. "** A Planning AssesRment Addendum shall he attached for each pump station located between the project connection point and t1le W W'rP where the Availabic Capacity is < b. Downstream Facility Name (Sewer): Northwest Regional WWTP Downstream Permit Number: WQ0086819 - Page l of 6 FTSE 10-18 III. Certification Statement: I Witham L. Pinnix, PIJ_ certify to the best of my knowledge that the addition of the volume of wastewater to be permitted -in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any caPitY related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances given the implementation of the planned imProvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies tc those items listed above in Sections I and II plus all attached planning assessment addendums for which 1 am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater_ Signing Official Signallire Title of Signing Official Page 2 of 5 FTSE 10-18 ZI Untitled Map y ar 62 IZ �► �r\'• Old MW Subdivision Ir ..id r � -- -�, � .� .�_ - yi• tie - � �,' Ya`y �' 1,� f *. ` - y ��14 �. • .�• , co r Earth '� lV