Loading...
HomeMy WebLinkAbout20071105 Ver 3_Staff Comments_20130530Strickland Bev From: Sent To: Cc: Subject: Attachments Cherri, Two conditions attached. Lucas, Annette Thunsdoy, May 30, 20132:48PK4 Smith, CheniL Strickland, Bev 07-1105v3 River Oaks Commercial Park — Son Lan Parkway Roadway Extension 07-1105v3 River Oaks Commercial Park — Son Lan Parkway Roadway Extension.docx Annette M. Lucas, PE Environmental Engineer lVCI}IClVR I DW() I Wetlands and BtorcuwaterBranch I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail) 512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels) Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email: Weboite: A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 07- 1105v3 River Oaks Commercial Park — Son Lan Parkway Roadway Extension AML comments May 30, 2013 1. Diffuse Flow Plan: Submittal of Local Government Approval Reauired Because the stormwater management plan approved by Johnston County is being used to meet diffuse flow requirements on this project, you are required to provide one copy of the approved SMP, including plan details on full -sized plan sheets, with proof of Johnston County's approval. The approved SMP shall be submitted to the DWQ Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any impacts authorized in this certification occur. The following requirements also apply: • The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. • The approved SMP as well as drainage patterns shall be maintained in perpetuity. • The SMP may not be modified without prior written authorization from Johnston County. A copy of the approval letter and the modified SMP shall be submitted to the DWQ Webscape Unit prior to the commencement of the modifications. 2. Stormwater Management Plan (SMP) Approval from Local Community for Future Phase(s) Required You are required to provide one copy of the approved SMP for the future phase(s), including plan details on full -sized plan sheets, with proof of Johnston County's approval. The approved SMP shall be submitted to the DWQ Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any land disturbance associated with that phase may occur. The following requirements also apply: • The approved SMP for the future phase(s) shall be constructed and operational before any permanent building or other structure is occupied at the site. • The approved SMP for the future phases(s) as well as drainage patterns shall be maintained in perpetuity. The SMP may not be modified without prior written authorization from Johnston County. A copy of the approval letter and the modified SMP shall be submitted to the DWQ Webscape Unit prior to the commencement of the modifications.