Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20080821PCS Phosphate AURORA SEP 2 6 n PCS PHOSPHATE COMPANY, INC. P.O. BOX 48, AURORA, NC U.S.A. 27806 August 21, 2008 Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management CERTIFIED MAIL Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report May 2008 — July 2008 Injection Well Permit #WI0700012 Tank Farm Remedial Action System Beaufort Co. Dear Qi: Ktv:JVED / DENR' ^l; AQUIFFR'PROTECTION SECT04 Please find the subject groundwater monitoring report attached. This includes the sampling and reporting requirements of the above referenced permit, Part V, Section B 1 as well as the reporting requirements of the overall Tank Farm Remedial Action Plan. Enclosed are: a) Form GW-59 for injection well CIW7 and monitor well MWTF 1 CR, b) piezometer level monitoring field sheet, and c) the summary operational and maintenance report. Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, W„-u-A-7t2_,,_d D. Daniel Winstead III Environmental Engineer PCS Phosphate Attachments RECEIVE A U G 2 6 2008 Inform t:o1 *'f0,c€_:;Sifg tiro JV'Q.f.:;O pc: Will Hart — Aquifer Protection DWQ, WaRO (w/ attachments) R. M. Smith/12-07-02 (w/ attachments) T. S. Ingra - Ardaman & Assoc. (w/attachments) R. A. Allen (w/ attachments) Mike Brom (w/ attachments) Anthony Shrewsbury (w/ attachments) R. B. Lee (w/ attachments) Total Two Copies Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management \\aurdata2\users\AUR1DDW\Reports\2008\Quarterly\TFRAS Report Second Quarter 2008.doc 2 GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 3 Well Identification Number (from Permit): MWTF1-CR Well Depth: 42.00 ft. Well Diamter: Screened Interval: 38.70 ft. to 40.70 ft. Depth to Water Level: 14.50 ft. below measuring point. Measuring Point is 3.95 ft above land surface. MILILITERS of water pumped/bailed before sampling: 2 inch For Groundwater Treatment Systems Check One: Influent (98) Effluent (99) 2100 Field Analysis: pH 7.1 , Specific Conductance 700 uMhos Temp. 23.6 oC, Odor NONE Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 Mail Service Center RALEIGH, NC 27699-1636 Phone' (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : EXPIRATION DATE: UIC X 01/31/13 Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: Certification No(s) 7/10/2008 7/10/2008 to 7/11/2008 PCS PHOSPHATE and ENVIRONMENT 1 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A Coliform: MF Fecal N/A Coliform: MF Total <1.0 (Note: Use MPN method for highly turbid samples) Dissolved Solids: Total pH (when analyzed) TOC Chloride Arsenic Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A mg/I /100m1 /100m1 mg/I units mg/I mg/I mg/I mg/I mg/I mgll uMhos mg/I mg/I Nitrite (NO2 as N) Nitrate (NO3 as N) Yes n/a Phosphorus: Total as P Orthophosphate Al - Aluminum Ba - Barium Ca - Calcium Cd- Cadmium Chromium: Total Cu - Copper Fe - Iron Hg - Mercury K- Potassium Mg - Magnesium Mn - Manganese No and field acidified N/A mg/I N/A mg/I Ni - Nickel Pb - Lead N/A mg/l Zn - Zinc Yes n/a No ) N/A mg/I Ammonia Nitrogen N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/l N/A ug/I N/A ug/l N/A ug/I Other (Specify Compounds and Concentration Units) Fluoride MIBK Ag - Silver Se- Selenium mg/I N/A mg/I N/A ug/I N/A ug/I N/A ug/I Sodium N/A ug/I Organics: (GC, GC/MS, HPLC) (Specify test method #. Attach lab report.) Report attached? Yes (1) No X (2) VOC method# method# method# certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 3/2000 E I ED AUG 2 8 2008 Information Processing Unit DWQ/BOG Ross M. Smith - Manager Environmental Affairs Permittee (of Authorizedpgent) Name and Title - Please type or print /(11,-.7S Signature of Permittee (or Authorizes' Agent) Ell (D e) GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 3 Well Identification Number (from Permit): Well Depth: 48.00 ft. Well Diamter: CIW-7 Screened Interval: 31.00 ft. to 45.25 ft. Depth to Water Level: Measuring Point is 4 inch N/A ft. below measuring point. N/A ft above land surface. For Groundwater Treatment Systems Check One: Influent (98) Effluent (99) GALLONS of water pumped/bailed before sampling: 0 Field Analysis: pH 7.0 , Specific Conductance 690 uMhos Temp. 24.6 oC, Odor NONE Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 Mail Service Center RALEIGH, NC 27699-1636 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : EXPIRATION DATE: UIC X 01/31/13 Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: 7/22/2008 Date sample analyzed: 7/22/2008 to 7/23/2008 Laboratory Name: PCS PHOSPHATE and ENVIRONMENT 1 Certification No(s) 330 10 PARAMETERS: (Samples for metals were collected unfiltered Yes COD Coliform: MF Fecal Coliform: MF Total N/A N/A <1.0 mg/I /100m1 /100m1 (Note. Use MPN method for highly turbid samples) Dissolved Solids: Total N/A mg/I pH (when analyzed) N/A units TOC N/A mg/I Chloride N/A mg/I Arsenic N/A mg/I Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A mg/I N/A mg/1 N/A mg/I N/A uMhos N/A mg/1 N/A mg/I Nitrite (NO2 as N) Nitrate (NO3 as N) Phosphorus: Total as P Orthophosphate Al - Aluminum Ba - Barium Ca - Calcium Cd- Cadmium Chromium: Total Cu - Copper Fe - Iron Hg - Mercury K- Potassium Mg - Magnesium Mn - Manganese nla Se- Selenium Sodium No and field acidified Yes n/a No ) N/A mg/I Ni - Nickel N/A ug/I ug/I ug/I N/A mg/I Ammonia Nitrogen mg/I N/A ug/I Other (Specify Compounds and Concentration Units) N/A ug/I Fluoride N/A mg/I N/A ug/I MIBK N/A ug/I N/A ug/I Ag - Silver N/A ug/I N/A ug/I N/A ug/I N/A ug/I Organics: (GC, GC/MS, HPLC) N/A ug/I (Specify test method #. Attach lab report.) N/A ug/I Report attached? Yes (1) No X (2) N/A mg/I Pb - Lead N/A N/A mg/I Zn - Zinc N/A N/A ug/I N/A ug/I N/A ug/I VOC : method# method# method# N/A ug/I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 3/2000 AUG Z 6 2008 nformat,on Processing Unit DWQ/BOG ELJ SEP 1 5 2008 Ross M. Smith - Manager, Environmental Affairs Permittee (of Authorized Agent) Name and Title - Please type «(/ 61%-� -4 r- 2�s C Signature of Permittee (or Autkforized Agent) (Date) PCS Phosphate Co., Inc. - Tank Farm Remediation System Quarterly Monitoring Date: 7///1/4 K Time: Tech: System Gauge Pressures SWw-1 SW W-7 cwW-1 CW W-7 File: 12-07-02 pe: TLB Reference Point MSL Level Rel to MSL Ditch 12.91 Boy Barge Slip Water Level Control Tank %= MSL 10.59 0.9,9 Sand Layer Peizometers Level Indicators Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. _ Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. Spz-1 10.47 7, (p/ V° -go, Cpz-1 10.51 io?' 522 -/. 99' Spz-2 11.21 B, 3 z276-le,n Cpz-2 10.25 /,�-VLS" - °" ?O Spz-3 11.87 O. /0 /'//, / 7 Cpz-3 11.12 /t ..5 7 - / 4'< Spz-4 11.45 6-2.7,A '/7' 73 CPW 9.65 /4•V7 oo-86 Spz-5 11.45 960 /t7�zs MWTF-IA' 14.35 6 •/7 A -it Spz-6 11.23 0 /_5 MWTF-1B • 14.36 5: 7a �9. B 0e p� /D.vj70 Spz-7 11.59 /0•a/ /3a MWTF-1C• 14.44 /-/.,50 -004° Spz-8 11.57 6p.0/ `L7 , s b W MTF-2A 14.05 6, 3/ 779 at ea g Spz-9 11.01 0..5/ a, bO MTF-2B W 14.02 //„ �3 Spz-10 12.16 /� / • 5-6) 7 4,0 MWTF-2C 14.08 /6,,3b S .8/, 07.30 1 S.S SPW 9.95 eC0/ /i 91/ W MTF-3A 12.21 MWTF-3B 12.18 /09- 4%p / 70 MWTF-3C 219 / /5 /0 4 9/ Sand Layer And Croatan Formation Withdrawal Wells Well ID TOC Elevation MSL' Max Ste Wtr Level Ft. Pump Activation Depth Rel MSL Max Level Relative To MSL Ft. Control Point MSL' Is Well Pumping? (Y)es/(N)o Comments SWW-1 10.70 7',/ (p(p 6' /'/66 +1'to+2' ,ye✓` - W CW-1 10.60 , , 0� 9' - 71 9g -2'to-1' SWW-2 9.99 t',�/at 6' D. lot. +1. to +2' yes y l.$ W CW-2 10.23 / 9 9' - 7• o�� -2'to-1' W SW-3 9.97 N•llR 6' -71/8 +1. to+2' yf�` Vej CINW-3 9.95 (0.217 9' 2.53 -2'to-1' Ye-5 SWW-4 10.73 ,5.06 6' - O. 9,Z +1 ' to+2' Ejr CW-4 W 10.73 5371 9' -�: d'ee, -2'to-1' /y<s swW-s 10.80 028 6' //.ge +1' to +2' e_s CWW-5 10.74 �D,,o2 9' oi,491 -2to-1 y" SWW-6 10.66 3t 75Y 6' - 0. o2SS +1' to +2' 7e5 CWW-6 9.92 (O-/. 9' .2,81j -2'to-1' SWW-7 10.70 5 l00 6' -0.. 4/0 +1' to +2' y" yes CWW-7 9.95 11.351 9' -71104, -2'to-l' tics Revised 7/29/02 • Riser length added to TOC elevation 1/24/97 D:\Data\Fomis\Well Form\Tank Fann Ramer] Wellsxis PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS May 2008 — July 2008 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Injection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL May 1,102,806 0 1,102,806 24.7 15.0 June 1,028,944 0 1,028,944 23.8 15.0 July 976,650 0 976,650 22.6 15.0 TOTALS 3,108,400 0 3,108,400 \\aurdata2\users\AUR1DDW\Reports\2008\Quarterly\TFRAS Report Second Quarter 2008.doc 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS _ TOTAL GALLONS AVERAGE GPM May 127,039 12,626 139,665 3.2 June 234,024 0 234,024 5.4 July • 90,998 0 90,998 2.1 TOTALS 452,060 12,626 464,687 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the fourteen well system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps On 6/19 replaced drive belts on compressor. SWW-1: On 5/15 changed pump. SWW-2: On 5/21 changed pump. On 5/26 replaced counter. On 7/9 changed pump. SWW-3: On 5/21 reset counter. SWW-4: On 5/12 changed counter. On 7/25 replaced pump. SWW-5: On 5/15 replaced pump. On 7/22 reset head. On 7/31 replaced pump. SWW-6: SWW-7: On 5/28 flushed well. \\aurdata2\users\AUR1DDW\Reports\2008\Quarterly\TFRAS Report Second Quarter 2008.doc 4 Croatan Formation Withdrawal Well (CWW) Pumps CWW-1: CWW-2: CWW-3: On 5/28 flushed well. CWW-4: CWW-5: CWW-6: CWW-7: On 5/28 flushed pump. \\aurdata2\users\AUR1DDW\Reports\2008\Quarterly\TFRAS Report Second Quarter 2008.doc 5