Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20060202• PCS Phosphate AURORA PCS PHOSPHATE COMPANY, INC. P.O. BOX 48, AURORA, NC U.S.A. 27806 February 2, 2006 EVAN O. KANE GROUND WATER DENR 1636 MAIL SERVICE CENTER RALEIGH, NC 27699-1636 CERTIFIED MAIL Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report November 2005 — January 2006 Injection Well Permit #WI0700012 Tank Farm Remedial Action System Beaufort Co. Dear Evan: RECEIVED/ DEJRI DWQ AQUIFER PROTECTION SECTION FEB 0 9 2006 Please find the subject groundwater monitoring report attached. This includes the sampling and reporting requirements of the above referenced permit, Part V, Section B 1 as well as the reporting requirements of the overall Tank Farm Remedial Action Plan. Enclosed are: a) Form GW-59 for injection well CIW7 and monitor well MWTF 1 CR, b) piezometer level monitoring field sheet, and c) the summary operational and maintenance report. Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, A. GJj2a D. Daniel Winstead III Environmental Engineer PCS Phosphate Attachments pc: Annalee Harris — Aquifer Protection DWQ, WaRO (w/ attachments) R. M. Smith/12-07-02 (w/ attachments) T. S. Ingra - Ardaman & Assoc. (w/attachments) R. A. Allen (w/ attachments) W. A. Schimming (w/ attachments) Two Copies — Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management E-Mail: M. D. Johnson Nubia Guzman R. B. Lee \\aurdata2\users\AUR1DDW\Reports\2006\Quarterly\TFRAS Report First Quarter 2006.doc 2 GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 Contact Person: Jack H. Taylor, Jr. County: Beaufort Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 18 Well Identification Number (from Permit): CIW-7 Well Depth: 48.00 ft. Well Diamter: 4 inch Screened Interval: 31.00 ft. to 45.25 ft. Depth to Water Level: N/A ft. below measuring point. Measuring Point is N/A ft above land surface. GALLONS of water pumped/bailed before sampling: For Groundwater Treatment Sys ems Check One: X Influent (98) Effluent (99) N/A Field Analysis: pH 6.9 , Specific Conductance 583 uMhos Temp. 17.5 oC, Odor NONE Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 MAIL SERVICE CENTER RALEIGH. NC 27699-1636 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : EXPIRATION DATE: UIC X 01/15/08 Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: Certification No(s) • 1/24/06 1 /24/06 to 1 /25/06 PCS PHOSPHATE and ENVIRONMENT 1 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A mg/1 Nitrite (NO2 as N) Coliform: MF Fecal N/A /100m1 Nitrate (NO3 as N) Coliform: MF Total <1.0 /100m1 Phosphorus: Total as P (Note: Use MPN method for highly turbid samples) Orthophosphate Dissolved Solids: Total N/A mg/I Al - Aluminum pH (when analyzed) N/A units Ba - Barium TOC N/A mg/I Ca - Calcium Chloride N/A mg/I Cd- Cadmium Arsenic N/A mg/I Chromium: Total Grease and Oils N/A mg/I Cu - Copper Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A mg/I Fe - Iron N/A mg/I Hg - Mercury N/A uMhos K- Potassium N/A mg/I Mg - Magnesium N/A mg/I Mn - Manganese Yes n/a No and field acidified N/A mg/I N/A mg/1 N/A mg/I N/A mg/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I Ni - Nickel Pb - Lead Yes n/a No ) Zn - Zinc Ammonia Nitrogen N/A N/A N/A Other (Specify Compounds and Concentration Units) Fluoride MIBK Ag - Silver Se- Selenium N/A N/A N/A N/A N/A ug/I Sodium N/A N/A ug/I Organics: (GC, GC/MS, HPLC) N/A ug/I (Specify test method #. Attach lab report.) N/A ug/I Report attached? Yes (1) No X : method# N/A ug/I N/A ug/I VOC method# : method# ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I (2) I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 03/2000 Ross .Smith - M a on •.e I e ittee or r, vironmental Affairs Perttee (of nt =me and Title - Please type or, print Signat re of P ( Authorized Agent) (Date) GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: P.O. Box 48 Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 18 Orr Pf, Well Identification Number (from Permit): MWTF1-CR Well Depth: 42.00 ft. Well Diamter: 2 inch Screened Interval: 38.70 ft. to 40.70 ft. Depth to Water Level: 10.32 ft. below measuring point. Measuring Point is 3.95 ft above land surface. MILILITERS of water pumped/bailed before sampling: For Groundwater Treatment Sys ems Check One: X Influent (98) Effluent (99) 2100 Field Analysis: pH 6.8 , Specific Conductance 645 uMhos Temp. 20.3 oC, Odor NONE Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 MAIL SERVICE CENTER RALEIGH, NC 27699-1636 Phone: (919)733-3221 PERMIT #: W10700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery EXPIRATION DATE: UIC X 01/15/08 Spray Field X Remediation : Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: Certification No(s) • 1/19/06 1/19/06 to 1/20/06 PCS PHOSPHATE and ENVIRONMENT 1 330 10 PARAMETERS: (Samples for metals were collected unfiltered Yes n/a COD Coliform: MF Fecal Coliform: MF Total N/A N/A <1.0 (Note: Use MPN method for highly turbid samples) Dissolved Solids: Total pH (when analyzed) TOC Chloride Arsenic Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A mg/I Nitrite (NO2 as N) /100m1 Nitrate (NO3 as N) No and field acidified Yes n/a No ) N/A mg/I Ni - Nickel /100m1 Phosphorus: Total as P Orthophosphate mg/I Al - Aluminum units Ba - Barium mg/1 Ca - Calcium mg/I Cd- Cadmium mg/I Chromium: Total mg/1 Cu - Copper mg/I Fe - Iron mg/1 Hg - Mercury N/A mg/I Pb - Lead N/A mg/I Zn - Zinc N/A mg/I Ammonia Nitrogen N/A ug/I N/A ug/1 N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I uMhos K- Potassium mg/1 Mg - Magnesium mg/1 Mn - Manganese N/A ug/I N/A N/A N/A Other (Specify Compounds and Concentration Units) Fluoride MIBK Ag - Silver Se- Selenium Sodium Organics: (GC, GC/MS, HPLC) (Specify test method #. Attach lab report) Report attached? Yes (1) No X N/A N/A N/A N/A N/A N/A ug/I VOC N/A ug/I method# method# method# ug/I ug/I ug/I ug/I mg/I ug/I ug/I ug/I ug/I (2) I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 03/2000 Ros mI na Env ronmental Affairs Pe ittee f o ed Ag7;y � - Signat re of POrmittee (or Authorized Agent) and Title - Please type or p t D4 (Date) PCS Phosphate Co., In Tank Farm Remediation Sy m Quarterly Monitoring Date: Time: Tech: /-S-o ff System Gauge Pressures sww-1 Xn7 i;y 445 o' / SWW-7 a i cWW-1 'r r' C1NW-7 rr ri File: 12-07-02 pc TLB Rae.e. Point Level Rel to k9L Ditch 12.91 729/ Barge Slip Water Level Control Tank %= MSL 10.69 ZNoP All Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To Ft. Well ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. • Spz-1 1047 .. to ' . //MSL 6. 4 7 Cpz-1 10.51 9O. -- /-a ' Spz-2 1121 7 94 .J.' 9 Cpz-2 10.25 /0. 99 - a• / 9 Spz-3 11.87 , 3. In 3 C� •,,? Cpz-3 11.12 9 /4 a.ao Spz-4 11.45 6,3o3 (5%/33 CPW 9.65 /O 05 -e.4O Spz-5 11.45 B 87 �.5 MWTF-1A• 14.35 y' you' /• 95 Spz-6 11.23 9/c5' -L6 MWTF-1B• 14.36 17/.90 9 sib Spz-7 11.59 9Bo / 79, MWTF-1C• 14.44 9 o4/ l/%Voo Spz-8 11.57 AA° V. 97 MWTF-2A 14.05 a 4/0/•0 ✓ Spz-9 11.01 760 .l o?/ MWTF-2B 14.02 JQ. V7 SASS - Spz-10 12.16 (Y-//1. / / .O9/ MWTF-2C 14.08 /4< Sg -0•a_4/ SPW 9.95 7,CS3 a,lppl MWTF3A- 12.21 _ Sajp -a`v33 MWTF-3B 12.18 9 70 02'ij MWTF-3C 12.19 /S../(% -0.9/ Sand Layer And Croatan Formation Withdrawal Wells Well ID TOC Elevation MSL' Max Stc Wtr Level/��Ft. Pump Activation Depth Rel MSL Max Level Relative To MSL Ft. Control Point MSL' Is Well Pumping? es/(N)2 Comments SWW-1 10.70 9;AV 6' S,c9 +1 'to+2' y/4 CWW-1 10.60 Ui,3�Y1 If1' -2'to- Yeti4' SWW-2 9.99 8/n 6' 02, //3 +1'to+2' /ej CWW-2 1023 5, 79 9' ..94a -2'to-1' ✓ 93 SWW3 9.97 7 97 6' / 4/9 +1'to+2' !ra3 CWW-3 9.95 6.96 9' a.09' -2'to-1' 7r5 W SW-4 10.73 7, '76 6' /, 747 +1 ' to+2' re3 CW W-4 10.73 y, -6 9' ^ y 4/41 -2'to -1' ye".1 SWW-5 10.80 767g 6' /, 5 +1'to+2' lies CWW-5 10.74 6.7g 9' -" .0/ -2'to-1' 9" SWw-6 10.66 9,,-8/ 6' /. B/ +1'to+2' GJeS CWW-6 9.92 769 9' -/.9/ -2'to-1'yef Sw 10.70 7w-7 2 6' /.. a r/ +1, to+2' y's CWW-7 9.95 6./9 6' 4.6/ -2'to-1' y ers Revised 729102 • Riser length added to TOC elevation 124/97 P.1Datawom ssWell Fonn\TenkFarm Remed Wells.tls svz SPZ-1 '® CPZ-1 c0.1 cIW-1 OFFICE CUT-OFF WALL SWw,a art2 1 ASPHALT ROAD SCVAY-2 WEIV/1V� CWW& SPZ- SWW4 CVAV-2 MWTF-2 CLUSTER ! DRAINAGE DITCH S.P.A PLANT 0 0 MWTE4 CLUSTER SPZ-5 SPZ-7 \ i S6 PZ-6 • SWwa CP SPW cwW-S Swwa WITHDRAWAL WELL TOTALIZERSFLOW CONTROL VALVES 005 CPZ-3 Z SPZ-9 X PIPERACK SPILL CONTAINMENT PAD S.P.A PLANT WATER LEVEL CONTROL TAPER MWTFI CLUSTER SPZ-S 1 . T 002 004 Z-_ 1 T _T -0 SPZ-1D J -- 1 T (II ND GYMII01 RI R. HIP IIUN 1,11••61111111111 • r..«a..n w,, • ...,.•.w,.snarl .., n w,o,un.wAl WI 11 • . a...•u, •...M., wax «, II.un.a will L- Ell ,.., hell *I I I ,,hell, n..tt, (� WIM.,..M ,hell ...,.Y «.Nell ,IA% LOCATION PLAN FOR TANK FAIIM: AREA REMEDIAL ACTION SYS I I M WELLS AND PIEZOME1I II' FIGURE 1 PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS November 2005 — January 2006 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Injection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL Nov 895,292 0 895,292 20.7 15.0 Dec 962,394 0 962,394 21.6 15.0 Jan 707,074 0 707,074 19.6 15.0 TOTALS 2,564,760 0 2,564,760 \\aurdata2\users\AUR1DDW\Reports\2006\Quarterly\TFRAS Report First Quarter 2006.doc 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM Nov 257,915 84,868 342,784 7.9 Dec 357,876 93,620 451,496 10.5 Jan 333,661 100,221 433,882 9.7 TOTALS 949,452 278,709 1,228,161 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the fourteen well system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps SWW-1: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flushed lines. On 12/5, 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flushed out pumps and lines. On 12/19 Replaced pumps. SWW-2: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flushed lines. On 12/5, 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flushed out pumps and lines. On 1/3 replaced counter. On 1/13 replaced counter. On 1/18 adjusted counter. SWW-3: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flush 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flush lines. SWW-4: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flus 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flus lines. On 11/29 replaced counter. SWW-5: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flus 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flus lines. \\aurdata2\users\AUR1DDW\Reports\2006\Quarterly\TFRAS Report First Quarter 2006.doc ed lines. On 12/5, ed out pumps and hed lines. On 12/5, hed out pumps and hed lines. On 12/5, hed out pumps and 4 SWW-6: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flushed lines. On 12/5, 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flushed out pumps and lines. SWW-7: On 11/2, 11/8, 11/16 and 11/30 flushed out pumps. On 11/16 and 11/30 flushed lines. On 12/5, 12/15, 12/20 and 12/27 flushed out pumps and lines. On 1/11, 1/17, 1/24 and 1/30 flushed out pumps and lines. On 1/19 replaced counter. Croatan Formation Withdrawal Well (CWW) Pumps CWW-1: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. CWW-2: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. CWW-3: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. On 11/28 replaced counter. On 1/6 replaced p pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and ump. CWW-4: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. On 1/10 replaced lines. CWW-5: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. On 12/12 replaced counter. CWW-6: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. CWW-7: On 11/2, 11/8, 11/16 and 11/30 flushed out 12/15, 12/20 and 12/27 flushed out pumps and lines. lines. On 1/9 replaced pump and lines. pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and pumps. On 11/16 and 1 On 1/11, 1/17, 1/24 and 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed 1/30 flushed \\aurdata2\users\AUR1DDW\Reports\2006\Quarterly\TFRAS Report First Quarter 2006.doc lines. On 12/5, out pumps and lines. On 12/5, out pumps and lines. On 12/5, out pumps and lines. On 12/5, out pumps and lines. On 12/5, out pumps and lines. On 12/5, out pumps and lines. On 12/5, out pumps and 5