Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20120203PotashCorp' Helping Nature Provide February 3, 2012 FEB 2420/2 Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 RECEIVED Attn: Information Management FEB 1 4 2012 WATER QUALITY SECTION CERTIFIED MAIL INFORMATION PROCESSING UNIT Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report November 2011— January 2012 Injection Well Permit #WIO700012 Tank Farm Remedial Action System Beaufort Co. Dear Qi: Please find the subject groundwater monitoring report attached. This includes the sampling and reporting requirements of the above referenced permit, Part V, Section B 1 as well as the reporting requirements of the overall Tank Farm Remedial Action Plan. Enclosed are: a) Form GW-59 for injection well C1W7 and Form GW-59 for monitor well MWTF I CR, b) piezometer level monitoring field sheet, and c) the summary operational and maintenance report. Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, Liz,v1A-r2-0 D. Daniel Winstead III Environmental Engineer PCS Phosphate Attachments 1530 NC Hwy 306 South, Aurora, NC USA 27806 T (252) 322-4111 PCS Phosphate I www.potashcorp.com pc: Will Hart — Aquifer Protection DWQ, WaRO (w/ attachments) R. M. Smith/12-07-02 (w/ attachments) Mike Brom (w/ attachments) David Harmon (w/ attachments) R. B. Lee (w/ attachments) Total Two Copies Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management (A) f H:\Reports\2012\Quarterly\TFRAS Report First Quarter 2012.docx 2 GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: 1530 NC Hwy 306 South Aurora, NC 27806 Contact Person: Jack H. Taylor, Jr. Well Locations/Site Name: Tank Farm County: Beaufort Telephone: (252)322-8155 No. of Wells to be Sampled 3 Oran Well Identification Number (from Permit): CIW-7 Well Depth: 48.00 ft. Well Diamter: 4 inch Screened Interval: 31.00 ft. to 45.25 ft. Depth to Water Level: N/A ft. below measuring point. Measuring Point is NIA ft above land surface. GALLONS of water pumped/bailed before sampling: Field Analysis: pH 6.9 , Specific Conductance Temp. 18.2 oC, Odor NONE For Groundwater Treatment Systems Check One: Influent (98) Effluent (99) CONTINUOUS 692 uMhos Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 Mail Service Center RALEIGH, NC 27699-1636 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : EXPIRATION DATE: UIC X 01/31/13 Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: Certification No(s) 1/10/2012 1/10/2012 to 1/11/2012 PCS PHOSPHATE 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A mg/I Nitrite (NO2 as N) Coliform: MF Fecal Coliform: MF Total N/A /100m1 Nitrate (NO3 as N) Yes n/a No <1.0 /100m1 Phosphorus: Total as P (Note: Use MPN method for highly turbid samples) Orthophosphate Dissolved Solids: Total pH (when analyzed) TOC Chloride Arsenic Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A mg/I Al - Aluminum units Ba - Barium mg/1 Ca - Calcium mg/I Cd- Cadmium mg/I Chromium: Total mg/I Cu - Copper mg/1 Fe - Iron mg/I Hg - Mercury uMhos K- Potassium mg/l Mg - Magnesium mg/I Mn - Manganese and field acidified Yes n/z- No ) N/A mg/I Ni - Nickel N/A mg/I Pb - Lead N/A mg/I Zn - Zinc N/A mg/I Ammonia Nitrogen N/A ug/l N/A ug/I N/A ug/I Other (Specify Compounds and Concentration Units) Fluoride MIBK N/A ug/I Ag - Silver N/A ug/I Se- Selenium N/A ug/I Sodium N/A ug/I Organics: (GC, GC/MS N/A ug/I (Specify test method # N/A ug/I Report attached? Yes N/A ug/I VOC N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A mg/I N/A mg/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I HPLC) Attach lab report.) (1) No X (2) method# method# method# I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information. including the possibility of fines and imprisonment for knowing violations. NOTE: CO z- 8\1Vi Z 1 GW-59 Rev 3/2000 Steven Beckel, General Manager thorized - - - nd Title - Signature of Permittee (or Authorized Agent) (. =te) GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: 1530 NC Hwy 306 South Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled Well Identification Number (from Permit): MWTF1-CR Well Depth: 42.00 ft. Well Diamter: 2 inch Screened Interval: 38.70 ft. to 40.70 ft. Depth to Water Level: 22.45 ft. below measuring point. Measuring Point is 3.95 ft above land surface. MILILITERS of water pumped/bailed before sampling: 7000 For Groundwater Treatment Sys ems Check One: Influent (98) Effluent (99) Field Analysis: pH 6.9 , Specific Conductance 753 uMhos Temp. 20.2 oC, Odor NONE Appearance: CLEAR Mail Original to: DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES WATER QUALITY DIVISION, GROUNDWATER SECTION 1636 Mail Service Center RALEIGH, NC 27699-1636 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES EXPIRATION DATE: UIC X 01/31/13 TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: 1/10/2012 1/10/2012 to 1/11/2012 PCS PHOSPHATE Certification No(s) 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A mg/I Coliform: MF Fecal N/A /100m1 Coliform: MF Total <1.0 /100m1 (Note: Use MPN method for highly turbid samples) Dissolved Solids: Total N/A pH (when analyzed) N/A TOC Chloride Arsenic Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A N/A N/A N/A N/A N/A N/A Yes n/a Nitrite (NO2 as N) Nitrate (NO3 as N) Phosphorus: Total as P Orthophosphate mg/I Al - Aluminum units Ba - Barium mg/I Ca - Calcium mg/I Cd- Cadmium mg/I mg/l mg/I Fe - Iron mg/1 Hg - Mercury uMhos K- Potassium mg/I mg/I Chromium: Total Cu - Copper Mg - Magnesium Mn - Manganese No and field acidified Yes n/k No ) N/A mg/1 N/A mg/I N/A mg/1 N/A mg/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I Ni - Nickel Pb - Lead Zn - Zinc Ammonia Nitrogen Other (Specify Compounds and Concentration Units) Fluoride MIBK Ag - Silver Se- Selenium Sodium Organics: (GC, GC/MS, (Specify test method #. Report attached? Yes N/A ug/I VOC N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A mg/I N/A mg/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I HPLC) Attach lab report.) (1) No X (2) • method# method# method# I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. NOTE: GW-59 Rev 3/2000 Steven A. Beckel, General Manager Permi . •_ - ed • e = t) Nary and Title Signature of Permittee (or Authored Agent) eas pe or rint !/ Z- ( ate) Date: Time: Tech: PCS Phosphate Co., Ir - Tank Farm Remediation S_. :'em Quarterly Monitoring ///o/a System Gauge Pressures SWW-1 T���, ne5.0. SWW-7 CWW4 ��l©.d - cww-7 L op. File: 12-07-02 pc: TLB Reraronce PoInt MSL Level Rai to MSL Ditch 12.91 e9// Barge Slip 10.59 as9 Water Level Control Tank % MSL Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOC Ste Wtr Level • Level Relative To MSL''/Ft. Well ID TOC Elevation MSL' TOC Stc Wtr Level Level Relative To MSL Ft. Spz-1 10.47 S760 y'B 7 Cpz-1 10.51 l�erj' /7L95 -6SA Spz-2 11.21 9g7 Cpz-2 10.25 /5 7 ' 'VL- Spz-3 11.87 0�, t30 /,�1/ J /V` Cpz-3 11.12 /9 9? ,g/ Spz-4 11.45 / a'/ '7 M 7. CPW - 9.65 75/ 75' -/c /0 Spz-5 11A5 /�C./ 97 / , .. 7 MWTF-1A• 14.35 (coo 9, Ls"' Spz-6 11.23 ram , 0/ -te).7 MWTF-1B • 14.36 6,99 097 Spz-7 11.59 9,Cd< -/. y._9 MWTF-1C • 14.44 07�74/5- ,4 0/ Spz-8 11.57 /c c4/ --04'7 MWTF-2A 14.05 i »5 / /5. y Spz-9 11.01 7. ✓/T' / ij6 MWTF-28 14.02 //geQ 07/91 Spz-10 12.16 /C.902 /V MWTF-2C 14.08 �/�. 8/ 6,/ SPW 9.95 9a ///7 _ F/,7 MWTF-3A 12.21 .7, 8,p?9 MWTF-3B 12.18 , /'',//�j,'�/j6/� 0, 70 MWTF-iC 12.19 �y,Otp /0,67 Sand Layer And Croatan Formation Withdrawal Wells Well ID TOC Elevation MSL' Max Ste Wtr Level t. Pump Activation Depth Rel MSL Max Level Relative To MSLFt. Control Point MSL' Is Well Pumping? U esl N o Comments SWIM-1 10.70 /t /9 6' p!/ j9' +1• to+2' N CWW-1-, 10.60 9' -2 • to -1' SWW-2 9.99 6' +1 ' to+2' CWW-2 10.23 9' -2' to -1' SWW-3 9.97 6' +1 'to+2' CWW-3 9.95 9' -2'to-1' SWW-4 10.73 6' +1 'to+2' CW W4 10.73 9' -2' to -1' SWW-5 10.80 6' +1 'to+2' CW W-5 10.74 9' -2' to -1' SW W-6 10.66 6' +1 'to +2' CWW-6 9.92 9' -2'to-0' SWW-7 10.70 6' +1 'to+2' CW W-7 9.95 9' -2 • to -1' Revised 7/29/02 Riser length added to TOC elevation 1/24/97 DAData\Fomu\Weli Form\Tank Fenn Remed Wellsals sri SPZ-T CPz,I OFFICE CUT—OFF WALL aWw4 CPZ-2 ASPHALT ROAD cww4 'aww4N CWW4 sp2-a • STANG W `' cvM.a IIwwF4 CLUSTER DRAINAGE DITCH S.P.A PLANT WTMDRAWAL WELL FLOWTOTALOSNS AND CONTROL VALVES 005• SPZ-S SPZ-7 • ,C0Z-3 sPZA b PIPERACK SPILL CONTAINMENT PAD WATER LEVEL CONTROL TANK CIW4 CM-410 01 0 O MWTF4 CLUSTER - SPW JenM. SWAT cMN? SWW4 SPZ-ID snz•E 1 T 002 064 1 T ,I •I M Alt •..•V 11 UI NO IN AI 1111'T111N rid /,. tIt• M••M11.1. SSII ..,•• ell II .aim, L lI n r111111MM1 W/J M111 . w...,Ali I• .w M.I.w It IIIMI,IA'It11 M111 • •••.I.IN I•+IM.• Intl N III 1 `v1 Y. III..ai Wt II IN 4W II•v1 .I N • 1 Wtll W11111 ItVlt • .ylln•.1 I.IW LOCATION PLAN FOR TANK FAIIM AREA REMEDIAL ACTION SyS 11 M WELLS AND PIEZOMETFFL FIGURE 1 PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN OUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS November 2011— January 2012 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Injection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL November 556,654 0 556,654 13.1 15.0 December 503,240 0 503,240 11.3 15.0 January 425,966 0 425,966 11.8 15.0 TOTALS 1,495,860 0 1,495,860 H:\Reports\2012\Quarterly\TFRAS Report First Quarter 2012.docx 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM November 110,726 385,558 496,285 11.5 December 171,353 518,784 690,137 17.1 January 245,233 528,968 774,200 17.3 TOTALS 527,312 1,433,310 1,960,622 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the fourteen well system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps SWW-1: On 11/3 repaired counter. SWW-2: SWW-3: SWW-4: On 11/1 repaired counter. On 12/8 repaired counter. On 12/14 replaced pump. SWW-5: SWW-6: SWW-7: Croatan Formation Withdrawal Well (CWW) Pumps H:\Reports\2012\Quarterly\TFRAS Report First Quarter 2012.docx 4 CWW-1: On 11/2 replaced pump. On 11/21 reset counter. On 12/1 replaced counter. CWW-2: CWW-3: On 11/2 replaced pump. On 1/24 repaired counter. CWW-4: CWW-5: On 11/11 acid washed well and installed new pump. On 11/17 repaired counter. On 12/5 replaced counter. CWW-6: On 1/12 repaired counter. CWW-7: H:\Reports\2012\Quarterly\TFRAS Report First Quarter 2012.docx 5