Loading...
HomeMy WebLinkAboutWI0700012_Monitoring (Report)_20100203PotashCorp Helping Nature Provide February 3, 2010 Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management CERTIFIED MAIL Subject: Underground Injection Control Program Quarterly Groundwater Monitoring Report November 2009 — January 2010 Injection Well Permit #WI0700012 Tank Farm Remedial Action System Beaufort Co. Dear Qi: Please find the subject groundwater monitoring report attached. requirements of the above referenced permit, Part V, Section B the overall Tank Farm Remedial Action Plan. Enclosed are: a) monitor well MWTFICR, b) piezometer level monitoring field maintenance report. This includes the sampling and reporting 1 as well as the reporting requirements of Form GW-59 for injection well CIW7 and sheet, and c) the summary operational and Please do not hesitate to contact me at (252) 322-8283 if you have any questions regarding this information. Sincerely, AlviiSe—e vV c —fir D. Daniel Winstead III Environmental Engineer PCS Phosphate Attachments VF_g092010 tmatlor ptoG� sing Unit Into O\NOIB G 1530 NC Hwy 306 South, Aurora, NC USA 27806 T (252) 322-4111 PCS Phosphate I www.potashcorp.com • pc: Will Hart — Aquifer Protection DWQ, WaRO (w/ attachments) R. M. Smith/12-07-02 (w/ attachments) T. S. Ingra - Ardaman & Assoc. (w/attachments) R. A. Allen (w/ attachments) Mike Brom (w/ attachments) Anthony Shrewsbury (w/ attachments) R. B. Lee (w/ attachments) Total Two Copies Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina, 27699 Attn: Information Management H:\Reports\2010\Quarterly\TFRAS Report Fourth Quarter 2009.docx 2 GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: 1530 NC Hwy 306 South Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 2 Well Identification Number (from Permit): CIW-7 Well Depth: 48.00 ft. Well Diamter: 4 inch Screened Interval: 31.00 ft. to 45.25 ft. Depth to Water Level: N/A ft. below measuring point. Measuring Point is N/A ft above land surface. GALLONS of water pumped/bailed before sampling: Field Analysis: pH 6.8 , Specific Conductance 571 uMhos For Groundwater Treatmen Systems Check One: Influent (98) Effluent (99) CONTINUOUS Temp. 16.9 oC, Odor NONE Appearance: CLEAR Mail Original to: DIVISION OF WATER QUALITY GROUNDWATER SECTION -PERMITS AND COMPLIANCE UNIT P.O. BOX 29578 RALEIGH, NC 27626-0578 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES EXPIRATION DATE: UIC X 01/31/13 TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: 1/19/2010 1/19/2010 to 1/20/2010 PCS PHOSPHATE Certification No(s) 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD N/A Coliform: MF Fecal N/A Coliform: MF Total <1.0 (Note: Use MPN method for highly turbid samples) Dissolved Solids: Total N/A pH (when analyzed) N/A TOC N/A Chloride N/A Arsenic N/A Grease and Oils Phenol Sulfate Specific Conductance Total Ammonia TKN as N N/A N/A N/A NIA N/A N/A mg/I Nitrite (NO2 as N) /100m1 /100m1 mg/I units mg/I mg/I mg/I mg/I mg/I mg/I uMhos mg/I mg/I Nitrate (NO3 as N) Yes n/a Phosphorus: Total as P Orthophosphate Al - Aluminum Ba - Barium Ca - Calcium Cd- Cadmium Chromium: Total Cu - Copper Fe - Iron Hg - Mercury K- Potassium Mg - Magnesium Mn - Manganese No and field acidified Yes n/E No ) N/A mg/I Ni - Nickel N/A mg/I Pb - Lead N/A mg/I Zn - Zinc N/A mg/I Ammonia Nitrogen N/A ug/I N/A ug/I N/A ug/l N/A ug/I Ag - Silver N/A ug/I Se- Selenium N/A ug/I Sodium N/A N/A N/A Other (Specify Compounds and Concentration Units) Fluoride MIBK N/A N/A N/A N/A N/A N/A ug/I Organics: (GC, GC/MS, N/A ug/I (Specify test method #. N/A ug/I Report attached? Yes N/A ug/I VOC N/A ug/I HPLC) Attach lab report.) (1) No X method# method# method# ug/I ug/l ug/I mg/I mg/I ug/I ug/I ug/I ug/I (2) I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violations. NOTE: GW-59 Rev 4/98 R mi rmittee Af mi th zed ana•er. Environmental Affairs ent) Name and Title - Please type or pri t Sigfiature bf Permittee (or Authorized Agent) (Date) GROUNDWATER QUALITY MONITORING: COMPLIANCE REPORTING FORM FACILITY INFORMATION Facilty Name: PCS PHOSPHATE CO., INC. - Aurora Division Permit Name (if different): Facility Addresss: 1530 NC Hwy 306 South Aurora, NC 27806 County: Beaufort Contact Person: Jack H. Taylor, Jr. Telephone: (252)322-8155 Well Locations/Site Name: Tank Farm No. of Wells to be Sampled 2 cm Well Identification Number (from Permit): MWTF1-CR Well Depth: 42.00 ft. Well Diamter: 2 inch Screened Interval: 38.70 ft. to 40.70 ft. Depth to Water Level: 23.37 ft. below measuring point. Measuring Point is 3.95 ft above land surface. MILILITERS of water pumped/bailed before sampling: For Groundwater Treatment Sys ems Check One: Influent (98) Effluent (99) 6000 Field Analysis: pH 6.8 , Specific Conductance 670 uMhos Temp. 20.4 oC, Odor NONE Appearance: CLEAR Mail Original to: DIVISION OF WATER QUALITY GROUNDWATER SECTION -PERMITS AND COMPLIANCE UNIT P.O. BOX 29578 RALEIGH, NC 27626-0578 Phone: (919)733-3221 PERMIT #: WI0700012 Non -Discharge NPDES EXPIRATION DATE: UIC X 01/31/13 TYPE OF PERMITTED OPERATION BEING MONITORED Lagoon Remediation: Infiltration Gallery Spray Field X Remediation : Rotary Distributor Land Application of Sludge Other Note: Values should reflect dissolved and colloidal concentrations Date sample collected: Date sample analyzed: Laboratory Name: Certification No(s) 1 /19/2010 1/19/2010 to 1/20/2010 PCS PHOSPHATE 330 10 PARAMETERS: (Samples for metals were collected unfiltered COD Coliform: MF Fecal Coliform: MF Total N/A N/A <1.0 (Note. Use MPN method for highly turbid samples) Dissolved Solids: Total N/A pH (when analyzed) N/A TOC N/A Chloride N/A Arsenic N/A Grease and Oils N/A Phenol N/A Sulfate N/A Specific Conductance N/A Total Ammonia TKN as N mg/I /100m1 /100m1 mg/I units Yes nla Nitrite (NO2 as N) Nitrate (NO3 as N) Phosphorus: Total as P Orthophosphate Al - Aluminum Ba - Barium mg/I Ca - Calcium mg/I Cd- Cadmium mg/I Chromium: Total mg/I Cu - Copper mg/I Fe - Iron mg/l Hg - Mercury uMhos K- Potassium N/A mg/I Mg - Magnesium N/A mg/I Mn - Manganese No and field acidified N/A mg/I N/A mg/I Ni - Nickel Pb - Lead N/A mg/I Zn - Zinc Yes nlz No ) N/A N/A N/A N/A mg/I Ammonia Nitrogen N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I N/A ug/I VOC N/A ug/I Other (Specify Compounds and Concentration Units) Fluoride MIBK Ag - Silver Se- Selenium N/A N/A N/A N/A Sodium N/A Organics: (GC, GC/MS, HPLC) (Specify test method #. Attach lab report.) Report attached? Yes (1) No X method# method# method# ug/I ug/I ug/I mg/I mg/I ug/I ug/I ug/I ug/I (2) I certify that, to the best of my knowledge and belief, the information submitted in this report is true, accurate, and complete, and that the laboratory analytical data was produced using approved methods of analysis by a North Carolina DWQ (formerly DEM) certified laboratory. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violations. NOTE: GW-59 Rev 4/98 Ros Smith - Man rmittee ature� qer, Environmental Affairs fIr$th. ize. •ent) Name and Title - Please type or pri t Sig ermittee�(or Authorized Agent) V (Date) PCS Phosphate Co., Inc. - Tank Farm Remediation System Quarterly Monitoring Date: /" /B"/0 Time: Tech: /9/2, System Gains Pressures SWW-1 / lj/oA SWW-7 CwW-1 _72/f/OP. 71V0/%- Cww-7 T_ iUCPQ. File: 12-07-02 pc: TLB Reference Point MSL Level Rel to MSL Ditch 12.91 B.aa' Barge Slip 10.59 D•S9' Water Level Control Tank e/ a MSL go/ 6/• Sand Layer Pelzometers Level Indicators Well ID TOC Elevation MSL' TOC Stc Wtr ' Level Relative To MSL Ft. Weil ID TOC Elevation MSL' TOC Stc Wtr Level' Level Relative To MSL Ft. Spz-1 10.47 --Lee/vel 7' .9 OO./9 Cpz-1 10.51 /`5'e J.S/ Spz-2 11.21 9, oa a./9 Cpz-2 10.25 9.4 /77 Spz-3 11.87 ago /'//o % Cpz-3 11.12 /,4 93 - Z 4/ Spz-4 11.45 6. /p B '7" 77 CPW 9.65 By/fed Spz-5 11.45 /,S,Dal -. C/ MWTF-1A* 14.35 //% s% Spz-6 11.23 N. s© -0..07 MWTF-1B' 14.36 Lge929 \. 4:2 9, 041 Spz-7 11.59 /7 74 -07,3 MWTF-1C• 14.44 -I.g,.%j7 9 '-R3 Spz-8 11.57 /�, . 90 / /7 MWTF-2A 14.05 4,/�, 7 //, 89 Spz-9 11.01 p , 9c. J.// MWTF-2B 14.02 // 55' q'. %D Spz-10 12.16 9. 44 ,a, 6/9 MWTF-2C 14.08 /9i 40 -S.C%Z SPW 9.95 ®. «,' /.53 MWTF-3A 12.21 ,1 W ,4! 78 MWTF-3B 12.18 /0. 78 /, VO MWTF-3C 12.19 /9, 50 - 7, �0 Sand Layer And Croatan Formation Withdrawal Wells Well ID TOC Elevation MSL' Max Stc Wtr Level Ft. Pump Activation Depth Rel MSL Max Level Relative To MSL Ft. Control Point MSL' Is Well Pumping? (Y)es/(N)o Comments SWW-1 10.70 9, 77 6' 8,77 +1. to+2' ye' .I cww-1 10.60 013�/ 9' /,/n/j -2 'to-1' /1�i7 SWW-2 9.99 5,7 /,9 6' � -R7 +1'to+2' e, 2 n-e/Line- -/Gry9ri, ten/ Ain „‹. /ea A CWW-2 10.23 000 9' - 9 a° -2 ' to-1' / 4. 2 SWW-3 9.97 9a/ 6' +1 ' to+2' G_riis CWW-3 9.95 �,�??/ 9' /%// - Ur, �/ •2'to-1' /.427 SWW-4 10.73 ,9 J3 6' ! +1'to+2' �%G�/� CWW-4 10.73 �./0 9' -2'to-1' /410 4,o-n//s„o /e0t SWW-5 10.80 // ln/%7i/ 6' ��/-/��ii -�4r/ la +1' to +2' yG! CWW-5 10.74 r�/,�/VJ 9' �C./Y -2'to-1' ///(/ SWW-6 10.66 a7C " 6' ,g65 +1' to +2' G/,�eyf CWW-6 9.92 4,Oo 9' - -2'to -1' //V/% %en,'j,'12m /'aM /..4:44,,;,%lr, Jest ,44,.0l 4,l. lee? SWW-7 10.70 ADO 6' - +1' to +2' I CWW-7 9.95 ci.1D 9 9' •-^ -2' to -1' �DA ,4 Revised 7/29/02 • Riser length added to TOC elevation 1/24/97 D:\Data\Fanns\Well Form\Tank Farm Remed Wells.xls L PCS PHOSPHATE - TANK FARM REMEDIAL ACTION PLAN QUARTERLY OPERATIONAL AND MAINTENANCE REPORT FOR THE INJECTION AND WITHDRAWAL WATER WELLS November 2009 — January 2010 The Tank Farm Remediation System consists of a series of seven- (7) injection water wells located on the south side of the Tank Farm Area and a series of fourteen (14) withdrawal water wells located on the north side of the Tank Farm Area. Injection Water Well System The injection water well system operated with the DPW Water - Ultraviolet Light Disinfection system during the period. Daily operational data are collected by the Shipping Department and reported to the Environmental Affairs Department. The total monthly and quarterly volumes of water injected as well as the month end water level in the Water Level Control Tank are: DPW WATER GALLONS TOTAL GALLONS AVERAGE GPM TANK LEVEL FEET, MSL November 805,490 0 805,490 18.6 15.0 December 786,201 0 786,201 17.6 15.0 January 285,373 0 285,373 7.6 15.0 TOTALS 1,877,064 0 1,877,064 H:\Reports\2010\Quarterly\TFRAS Report Fourth Quarter 2009.docx 3 Withdrawal Well System The withdrawal water well pumps are monitored daily by the area Maintenance Department and preventative maintenance work is performed as needed. The total monthly and quarterly withdrawal water volumes for the period are: SAND FORMATION GALLONS CROATAN FORMATION GALLONS TOTAL GALLONS AVERAGE GPM November 1,603,256 0 1,603,256 37.1 December 205,193 0 205,566 4.6 January 178,475 0 178,475 4.3 TOTALS 1,986,925 0 1,986,925 Some additional short periods of planned downtime for preventative maintenance, pipe header cleaning, and troubleshooting on individual pumps in the fourteen well system were experienced. Details of these activities are: Confined Sand Formation Withdrawal Well (SWW) Pumps On 11/3 unplugged SWW Header. On 12/8 changed oil filter on air compressor. On 1/26 the main water meter was repaired. SWW-1: SWW-2: SWW-3: SWW-4: On 12/14 replaced pump. On 12/30 replaced pump. SWW-5: On 11/5 replaced pump. On 12/16 replaced pump. SWW-6: On 11/4 replaced pump. SWW-7: Croatan Formation Withdrawal Well (CWW) Pumps H:\Reports\2010\Quarterly\TFRAS Report Fourth Quarter 2009.docx 4 CWW-1: CWW-2: CWW-3: CWW-4: CWW-5: CWW-6: CWW-7: H:\Reports\2010\Quarterly\TFRAS Report Fourth Quarter 2009.docx 5