Loading...
HomeMy WebLinkAboutNCC214006_Site Plan or Location Map (2)_20210714------------ ss ss ss ss \ \ \ 1 / I / /I hI / / / / / NARRATIVE THE INTENT OF THIS PLAN IS TO ALLOW DAVID WEEKLEY HOMES TO DEVELOP LOTS INDIVIDUALLY AND INDEPENDENTLY OF OTHER LOTS DESIGNATED FOR HOME CONSTRUCTION. LOT CONSTRUCTION FOR ADJACENT LOTS MAY BEGIN AND END AT DIFFERENT TIMES. THEREFORE, EACH LOT SHOULD HAVE PERIMETER CONTROLS AND A CONSTRUCTION ENTRANCE. REFER TO DETAIL SHEETS FOR DETAILS OF INDIVIDUAL LOT EROSION CONTROL MEASURES. GENERAL NOTES 1. PROPERTY, RIGHT-OF-WAY, EASEMENT, ETC. LINEWORK WAS TAKEN FROM AN AUTOCAD FILE PROVIDED BY DAVID WEEKLEY HOMES ON SEPTEMBER 6, 2019. 2. THESE PLANS ARE ONLY FOR EROSION CONTROL FOR THE DEVELOPMENT OF SINGLE FAMILY LOTS 1123-1150 & 1340-1345. REFER TO APPROVED WENDELL FALLS SUBDIVISION CONSTRUCTION DRAWINGS DESIGNED BY MCKIM & CREED AND SURVEYING FOR ALL INFRASTRUCTURE DESIGN. 3. THE SITE IS LOCATED IN THE WALNUT CREEK WATERSHED AND THE NEUSE RIVER BASIN. 4. THE NEUSE RIVER RIPARIAN AREA PROTECTION AND MAINTENANCE RULE (15A NCAC 2B.0233) APPLIES TO ALL PERENNIAL AND INTERMITTENT STREAMS, LAKES, PONDS AND ESTUARIES IN THE NEUSE RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR "RIPARIAN AREA". S. ALLSOIL EROSION AND SEDIMENT CONTROL PLANS AND MEASURES MUSTCONFORMTOTHE MINIMUM APPLICABLE STANDARDS SPECIFIED IN NORTH CAROLINA'S EROSION AND SEDIMENT CONTROL PLANS. 6. ALL DISTURBANCE WITHIN THE 2T TREE AND VEGETATION PROTECTION ZONE SHALL COMPLY WITH SECTION 16 OF THE WAKE COUNTY LIDO. ANY PROTECTED TREES THAT ARE REMOVED SHALL BE REPLACED PER WAKE COUNTY LIDO 16-12-7. AREA OF DISTURBANCE ORIGINAL PERMIT SEC-031993-2020 DISTURBED AREA = 4.34 AC DISTURBED AREA OF LOTS WHICH HAVE RECEIVED CERTIFICATE OF COMPLETION DATED 9/30/2020 = 1.72 AC NEW LOTS (1340-1345) TO BE ADDED TO PERMIT SEC-031993-2020 = 0.85 AC � LEA � v Z 0 d m a+ '> a � Lu a Z �� C 4! o _C _pM LOU) m�OWO O C) IL M Z WAKE COUNTY EROSION CONTROL SEQUENCE 1. FOR EACH LOT, SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE N w WAKE COUNTY WATERSHED MANAGER, KARYN PAGEAU. OBTAIN A w LAND DISTURBING PERMIT. 2 Q 2. INSTALL GRAVEL CONSTRUCTION PAD, SILT FENCE, SILT FENCE OUTLETS O Z � AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO Ln } n Ooo n INSTALLTHESE DEVICES. SEED AREAS DISTURBED FOR EROSION z Lu � N N CONTROL MEASURES IMMEDIATELY AFTER CONSTRUCTION. U 3. CALL KARYN PAGEAU FOR AN ONSITE INSPECTION BY THE WATERSHED v w = � y MANAGER TO OBTAIN A CERTIFICATE OF COMPLIANCE. ?j LA 4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. Q p z U ROUGH GRADE SITE. > o S. PROTECT ANY EXISTING STORM INLETS INLETS WITH BLOCK AND GRAVEL 0 INLET CONTROLS OR OTHER APPROVED MEASURES. BEGIN CONSTRUCTION, BUILDING ETC. 6. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABIL12ATON TIME FRAMES. 7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL KARYN PAGEAU FOR AN INSPECTION BY THE WATERSHED MANAGER. 8. IF THE SITE IS APPROVED, REMOVE SILT FENCE, SILT FENCE OUTLETS, ETC., AND SEED OUT OR STABILIZE AND RESULTING BARE AREAS. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE WATERSHED MANAGER, KARYN PAGEAU. OBTAIN A CERTIFICATE OF COMPLETION. CONSTRUCTION SEQUENCE NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT EROSION IS MINIM12EDANDTHAT COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, AND ORDINANCES IS MAINTAINED THROUGHOUT EXECUTION OF THIS PROJECT. Ln 2. THE CONTRACTOR SHALL INSPECT AND REPAIR ALL EROSION DEVICES AT z LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY O Ln 0.S INCH OR GREATER RAINFALL EVENT. > 3. THE CONTRACTOR SHALL ENSURE THAT THE EROSION CONTROL DEVICES w ia� REMAIN UNDISTURBED UNTILTHE CONTRIBUTING UPSTREAM AREAS HAVE BEEN STABILIZED AND APPROVED. TOTAL AREA OF DISTURBANCE = 5.19 AC i m m m m Mk AREA OF DISTURBANCE (CURRENT PERMIT) p1iiiiiiiiiii. ��NJ r k AREA OF DISTURBANCE (LOTS COMPLETED IN CERTIFICATE OF COMPLETION) ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT WAKE COUNTY EROSION CONTROL SPECIFICATIONS AND DETAILS z , f) 00a� way apo m z Jz�'� J00z U Lr) 0 Jz�Y rn LJO (V o0� z=� w w0 cn z a a w a 0 co rAw C A R O =o Q�oF E s g CF,AI j - �d�c.a-�-c.J 'CA W. ,��% i n 1110" PROJECT NO: DESIGN BY: AA DRAWN BY: AN SCALE: 1" = 60' 60 0 30 60 120 DATE: 2020-10-12 SCALE: 1"=60' I�;sarigun_�;���.�;?r_v�ru►re>e►rart;�arrr_��a.�r.�;zr.�►��r;irrrrr.�►i SHEET NO: C-1