Loading...
HomeMy WebLinkAboutNCC213892_NOI Application_20210714Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/29/2021 9:22:20 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 6/30/2021 9:43:35 AM (Review- Construction NOI 57531) • The task was assigned to Broussard, Brooklyn C by round robin distribution 6/29/2021 9:23 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 1, 2021 5:00 PM 6/29/2021 9:23 PM Submit by McCoy, Suzanne 7/14/2021 8:22:35 AM (Payment Verification for NCC213892) * Ian Cody • McCoy, Suzanne assigned the task to McCoy, Suzanne 7/14/2021 8:22 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 11, 2021 5:00 PM 6/30/2021 9:44 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Crabtree Creek Bank Stabilization 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 434-00000-0049 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 1705087835 2. County* Wake 3. Highway or Street 3400 Alamance Dr. Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Raleigh 5. State * NC 6. Zip Code* 27609 7. Latitude* Enter the latitude in decimal degrees 35.8356 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -78.6609 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/14/2021 Estimated Construction Project Start Rate 10. Date to End* 08/31/2021 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 5.60 disturbed* (including off -site borrow and waste areas) 13. Total site area 5.60 (acres) * 14. Post- 0.01 construction (Estimated) impervious area (acres) * Project Tracking ID NCC-WAKE-2021-Crabtree Creek Bank Stabilization Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Crabtree Creek Waterbody* Narreof waterbody into which stormwater runoff will discharge 15b. Waterbody 27-33-(10) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Kiewit Infrastructure South Co. IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Benjamin If Corporation, enter Faegistered Agent First %rre 3. Last Name* Carnazzo IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Executive Vice President 4. Permitee E-mail Ben.Carnazzo@kieWt.com Address* 5. Permittee 7704872300 Telephone No.* 6. Permittee Mailing Street Address Address* 450 Dividend Drive Address Line 2 City Peachtree City Fbstal / Zip Code 30269-1906 Check box if the street address the same as mailing address 7. Permittee Street Address* F Yes Street Address 2062 Energy Drive Address Line 2 City Apex Fbstal / Zip Code 27502 State / Frovince / Pegion GA Country us State / Frovince / Faegion NC Country us 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Anthony Contact - First Name * 2. Primary Site Galantini Contact - Last Name * 3. Title Project Manager 4. Site Contact E- Anthony.Galantini@kieWt.com mail Address* 5. Site Contact 2408563416 Telephone No. 6. Organization Kiewit Infrastructure South Co. Name 7. Site Contact Street Address Mailing Address* 2062 Energy Drive Address Line 2 city Apex Fbstal / Zip Code 27502 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) Ben.Carnazzo@kieWt.com Default is legally responsible person e-rrail 12. Billing (For Annual Fee correspondence) Telephone 7704872300 Default is legally responsible person telephone State / Rovince / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/29/2019 Approved * 2. E&SC Plan Project WAKE-2020-013 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan E&SC Plan Approval Letter - Crabtree Creek Bank Approval letter or 61.93KB Stabilization.pdf Grading Permit Mast be FL7Fforrrat 6. Site Location Map Mist be FDFfornat (lint 201VB) Site Location Map - Crabtree Creek Bank 1.65MB Stabilization.pdf Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies if necessary. 8. NOI Certification 20210628 Streambank Repairs NOI Certification Form 963.44KB Crabtree Creek Bank.pdf Mist be FDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Benjamin J. Carnazzo Title Executive Vice President Organization Legally Responsible Entity Kiewit Infrastructure South Co. Date * 06/29/2021 F. Tracking and COC Info NOI Tracking No. 57531 NC Reference No. NCG01-2021-3892 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC213892 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 3892 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC213892-2021 Invoice Due Date 7/30/2021 Initial Fee $ 100.00 Invoice Status OPEN