Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WI0700123_Site Plans/Maps_20081012
August 06, 2007 1:08:22 p.m. Drawing: T:\SJAFB\ 1 61 69952\ 1 61\uit\ 1 .dwg SEYMOUR JOHNSON AIR FORCE BASE CHK'D. BY: ORH REVISION: 0 PROJECT N0. 16169952 • Gnu» •Sch FIG. N0. 1 Y. MILE RADIUS FROM FT-07 LEGEND Q5 MONITORING WELL - — BASE BOUNDARY — SURFACE WATER TREELINE October 02. 2006 4:10:35 p.m. Drawing: T:\ SJAfit\ 16169952\ 165\ 1\ 2.dwg MW-201 MW —42 e 415)4W-41 < el Wet- 1 05 MW 10 MW 415 v,MW-106 / W — 1 1 BUILDING 21 FT-07 SITE PLAN SEYMOUR JOHNSON AIR FORCE BASE CH)CD. BY: DRM DATE 09/29/06 (80.77) 71 Q 7\ MW-102 (69.56) 72 •••••...� \ 73 � 1 - — 74 75 • ♦ 76 LF 77 (78.91) 78 Qb MW-101A I � L 1 e 1 / 1 1 / f / LEGEND r /I / Q, MONITORING WELL / 1 / SOIL BORING r / SURFACE SOIL SAMPLE // DIRECT —PUSH SAMPLE / • BIOSPARGE POINT AND ID / / PROPOSED INJECTION POINT / / TREELINE POTENTIOMETRIC SURFACE CONTOURS — / AUGUST 2008 (FT. ABOVE MEAN SEA LEVEL) GROUND WATER ELEVATION — AUGUST 2008 (FT. ABOVE MEAN SEA LEVEL) (NM) NOT MEASURED FORMER 0/W SEPARATOR LINE SOIL EXCAVATION AREA ERP SITE BOUNDARY GEOLOGIC CROSS—SECTION October 02, 2008 4:11:53 p.m. Drawing: T:\SJAFB\ 16169952\ 163\ 1\3.dwg 79 DP-8 / 1 (79.56' MW-1 07 (79.21) MW-1 DP— MW-1 Q5 • \ DP-5 • MW— 106 (79.81) • • 1 A• • • \ 7.80 SB-001 (NM) 4AW-42A% • MW-104 2F `>c3 DP-2 PZ-103 3G• FT-07 3F 3E• W-105 i 81�4D 80. 33J _ Q• ♦ • FORMER GRATE -- EQUIPMENT TRAILER LOCATION BUILDING 2100 WATER TANK SB P-4� 0 OIL/W4TEF' SEPARIsTOR SB-5 / / Q-002 FORMER BERM/EDG nr PIT BIOSPARGE AIR SUPPLY LINES 50 0 DP-1 \ \ • • • 50 SCALE IN FEET • • ( SITE FT-07 SITE PLAN SEYMOUR JOHNSON AIR FORCE BASE CHKD. BY: CTA DATE: 09/29/08 16169952 3 NO. �J901-FY01 Analyte Groundwater Protection Standard (2L) Volatile Organic Compounds (µg1L) Benzene 1 1.2-Dichloroethene (cis) 70 Naphthalene 21 Tnchloroethene 2.8 Vinyl Chloride 0.015 LEGEND FIRE TRAINING AREA BOUNDARY ESTIMATED FROM HISTORIC AERIAL PHOTOGRAPHS 0 MONITORING WELL SOIL BORING A SURFACE SOIL SAMPLE ❑ DIRECT -PUSH SAMPLE BIOSPARGE POINT PROPOSED INJECTION POINT BASE BOUNDARY SURFACE WATER TREELINE RAILROAD TRACKS FORMER FUEL LINE FORMER 0/W SEPARATOR LINE EXTENT OF VOCs ABOVE NC 2L BTEX CHLORINATED NOTES ONLY VOCs DETECTED ABOVE NC 2L FOR MULTIPLE EVENTS ARE SHOWN. GRAY SHADED CONCENTRATIONS EXCEED NC 2L AND BACKGROUND CONCENTRATIONS FOR MATALS ONLY. NA = NOT ANALYZED October 02, 2008 4:12:26 p.rn. Drawing: T:\SJAFB\16169952\163\1\4.dwg MW42 Analyte Feb-87 Mar-89 Jun-97 Jun-04 Nov-07 Mar-08 Volatile Organic Compounds (µgit.) Benzene <1 6.1 1 <1 I <0.5 1 <1 1 <1 M W-108 Analyte Nov-07 Mar-08 Aug-08 Volatile Organic Compounds (µg/L) Benzene 6.2 3.3 4.6 1,2-Dichloroethene (cis) 98 7.6 53 Tnchloroethene 19 1.9 10 Vinyl Chloride 200 62 190 MW-41 Analyte Feb-87 Mar-89 Jun-97 Jun-04 Apr-07 Nov-07 Mar-08 Aug-08 Volatile Organic Compounds (µg/L) Benzene <1 <5 2.6 2.6 12 <1 1.5 12 1.2-Dichloroethene (cis) <1 <5 <1 1.5 <1 <1 3.2 1.2 Naphthalene NA NA NA NA 3.8 <1 <1 <1 Vinyl Chloride <1 <10 <1 3.9 5.8 <1 6.3 3.7 MW-11 Analyte Apr-84 Feb-87 Mar-89 Jun-97 Jun-04 Volatile Organic Compounds (µg/L) 1.2-Dichloroethene (cis) NA NA I NA <1 I <0.5 DP-8 M W-106 Analyte Apr-07 Mar.08 Aug-08 Volatile Organic Compounds (µg/L) Benzene <1 <1 93 1.2-Dichloroethene (cis) 16 18 60 Tnchloroethene <1 <1 6.4 Vinyl Chloride <1 <1 56 O MW-103 Analyte Jun-04 Apr-07 Nov-07 Mar-08 Aug-08 Volatile Organic Compounds (µg/L) Benzene 330 240 76 160 8.1 1.2-Dichloroethene (cis) 2.2 2.2 <1 3.8 <1 Tnchloroethene <0.5 <1 <1 1.8 <1 Napthalene NA 64 18 40 2.0 FORME\ GRATE BUILDING 2100 01 L/WAT SEPRAT Q WATER TANK MW-105 Analyte Apr-07 Nov-07 Mar-08 Aug-08 Volatile Organic Compounds (µg/L) Benzene 34 17 9.5 12 9911 1,2-Dichloroethene (cis) 55 72 42 Napthalene 20 <1 <1 <1 Tnchloroethene 9.5 16 7.1 20 Vinyl Chloride 50 38 15 14 FORMER ABOVE GROUND JP-4 TANK AND BERM MNV-104 p O PZ-103 SB-56 SB-104 1 DP-1 ■ 2 i / i 100 L 50 SCALE IN FEET SITE FT-07 VOCs DETECTED IN GROUNDWATER SEYMOUR JOHNSON MR FORCE BASE DRN. BY: DPG CHK'D. BY: DRH DATE 09/29/08 DATE 09/29/08 PROJECT NO. 16169952 100 FIG. NO. 4 LEGEND: PAP'. WEST A �00 90 J W - 80 ZW O u) Z Q W W w w W 0 70 1` w w w 60 SILTY SAND (SM) SANDY CLAY (CL) STIFF SILTY CLAY (CL) W/ SAND LAMINATIONS DENSE, FINE SAND (SP) W/ FINE LAMINATIONS OF CLAY AND ORGANICS ROCK (CRUSHED STONE) VOC PLUME ABOVE NC 2L FILL MATERIAL SURFI CIAL BLACK CREEK BLACK CREEK CONFINING UNIT MONITORING WELL SCREEN INTERVAL - WATER TABLE SURFACE 82.14 WATER LEVEL - AUGUST 2008 50 0 50 HORIZONTAL SCALE IN FEET 10 5 0 10 VERTICAL SCALE IN FEET SITE FT-07 CROSS SECTION A —A. SEYMOUR JOHNSON AIR FORCE BASE October 02. 2008 4:12:56 p.m. Drawing: T:\SJAFB\ 16169952\ 163\ 1\5.dwg 1 DRN. BY: DPG CHKD. BY: CTA DATE: 09/29/06 DATE: 09/29/08 PROJECT NO. 16169952 FIG. NO. 5