HomeMy WebLinkAboutNCC203062_NOT Closeout Documents_20210712North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Stokes Project: Belews Creek BC-159 East Pine Hall River basin: Roanoke
Person financially responsible: Duke Energy - Paul Draovitch, Senior Vice Project #: STOKE-2020-007
President
Address: 526 South Church Street, Mail Code: EC3XP, Charlotte, NC
1. Project Location: Steam Station Road, Belews Creek
Pictures: Yes - Digital
2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Brenda Johnson Title: Senior Environmental
Inspection report: Sent Report Date given/sent: June 28, 2021
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https:Hedoes.deq.ne.gov/Fonns/NCGO1-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Tyler Pearson Others present:
Date of inspection: June 23, 2021 Time arriving on site: 7:45 AM Time leaving site: 8:45 AM
cc: