HomeMy WebLinkAbout20190210 Ver 2_Compliance Evaluation Inspection_20210712Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
7/12/2021
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on July 12, 2021. Reid Whitehead
and Nick Adams were present during the inspection. Site is compliant with the 401 Water Quality Certification and
additonal conditions.
-Recommend native seed mix to stablilize wetland area at Station L 130+00 RT (Anderson Property).
-Recommend additonal rip rap below diversion at Station L 187+00 RT Site 15.
-Recommend addtional groundcover at Station L 202+00 RT Site 17.
Continue to ensure that all sediment and erosion control structures are maintained and that seeding and mulching are
performed as needed to protect downstream waters.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
7/12/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Culvert work at Site 15 ~ Station L 187+00 is in progress.Comment:
page:2