Loading...
HomeMy WebLinkAbout20211320 Ver 1_draft SMP_Brunswick Bridge 15 on NC 179B over Calabash River_20210712 From: Herndon,T.Mason To: Patterson. Robert D Cc: Pielech,Derek R Subject: Brunswick Bridge 15 on NC 179B over Calabash River Date: Monday,July 12,2021 2:58:31 PM Attachments: image001.png CalabashNarrowBrgONLY SELDMCatalog 2021-6-10.pdf DRAFT-FINAL SMP Language Recs 2021-6-23.docx BR-0160 25 Pct Combined Plan Set.pdf Calabash SELDMCatalog 2021.04.05 protected.pdf CalabashBridge StreamStats.pdf Good afternoon Robert, The Division has initiated environmental studies and preliminary designs for the replacement of Bridge No. 15 on NC 179B over the Calabash River in Brunswick County. The current bridge is 281 ft long and 30.25 ft wide. The Division is proposing to remove the earthen causeway and span the entire coastal wetlands and river with a 575 ft long bridge (-290 ft of causeway removal). The new bridge will also include a 10 ft wide multiuse path on the downstream side of the bridge which has been requested by the Town of Calabash. We have met with our stormwater folks (Brian Lipscomb and Andy McDaniel) to discuss stormwater management on this project and they have provided us with the attached SELDM Catalog Reports for both the entire contributing roadway segment and for the 'narrow' bridge (assuming the smaller shoulders) as well as the accompanying StreamStats report for the watershed. They have also assisted use with developing some draft language for the SMP. Based on the findings of these reports, designing this bridge with deck drain will have no detrimental impacts on water quality. Furthermore, including deck drains on the structure will decrease the overall bridge width. which will reduce shading and increase area of coastal wetland restoration, narrow the approaches which will minimize impacts to a county park on the SW quadrant and a campground on the SE quadrant. Removing the causeway will increase habitat and improve water circulation in this PNA. Please review the attached information and proposed SMP language and let me know if you concur that stormwater proposal is acceptable to DWR. I have also attached the preliminary 25% plans which was developed prior to this proposed SW plan. If you have any questions or would like to have a teams meeting to discuss this further with the project management team please let me know. Also, fyi,Joanne attended the scoping meeting for this project prior to her retirement and was aware of the stormwater challenges. Thanks! Mason Herndon Project Development Environmental Engineer Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 r r • Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties.