Loading...
HomeMy WebLinkAbout310050_Compliance Evaluation Inspection_20210610Division of Water Resources Facility Number - ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Fri 7UQ1 Departure Time: County: U Region: ^ j FarmName: Owner Name: n1 Ta ,�a riDaAjj� Mailing Address: Physical Address: Owner Email: Facility Contact: � I) 1e11J�5 Title: Phone: q)` —aq—(� (� Onsite Representative: "bi\ I1" Integrator: �to W/1 Certified Operator:l,I I ( 1 a ► JCl/V\t 5 Certification Number: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to to Farrow to Other Other Certification Number: p Latitude: Tf a Longitude: Design Current Wet Poultry Capacity Pop. La er Non -La er Design Current Dry Poultry Capacity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes W No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE Page I of 3 21412015 Continued Tacilit Number: - Date of Inspection: 1 Q Waste Collection & Treatment 4. Is storage capacity (structural plus'stornr storage plus heavy rainfall) less than adequate? [—]Yes �] No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity o any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes{ No ❑ NA ❑ NE waste management or closure plan? 7" If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? V Yes sp No ❑ NA ❑ NE S. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require - ❑ Yes EP No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes rM No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 7 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): W8l Goo , 7=a0 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes fX] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement'? ❑ Yes V� No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [�j No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ Yes ER No ❑ Yes 71 No ❑ NA ❑ NE ❑ NA ❑ NE ❑ Yes X) No ❑ NA ❑ NE ❑ Yes N No ❑ NA ❑ NE ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. % Yes ❑ No ❑ NA ❑ NE DSWaste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall WStocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes �g No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes t� No ❑ NA ❑ NE Page 2 of 3 21412075 Continuer) Facilit Number: ' Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: ❑ NA ❑ NE ❑ NA ❑ NE 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Ih�l No }'❑ ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No Rl NA j ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? T 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes M No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes P No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes rn( No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes . No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E;j No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). p( � rl � 'h0.v � �LA RV'VN' �.lMk (J1,��'19n �P'tn (�c�r(�S %c„ (av��-3c��1 - (i`ec`l h�dr�uQ; (C7IQrloc�c�� (A'UA SLAP L-V- a((t,rCia N `S-> h ) -r-A5 o V Reviewer/Inspector Name: Phone: qI©—(.0w '11'�O Reviewer/hrspector Signature: Page 3 of 3 Date: l U J 1 0 Zi 21412015