Loading...
HomeMy WebLinkAboutNCG140105_DMR_20210321STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF C VERAGE N0. N G14 v I FACILITY NAME: CyI.,DS 1%S/� PERSON COLLECTING S MPLES A l� CERTIFIED LABORATORY Lab # Lab # OPTIONAL INFO: SAMPLE COLLECTION YEAR: ZVV SAMPLING PERIOD: July -December anuary-June COUNTY PHONE N0. }�'L) (0 / 7 ADD TO LISTSERVE7 []YES [:]NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout []Other Part A: XOrmWaier Outfall No. rvwmrunng neyun oncuw Date Sample Collected (mo/dd/yr OR t NO FLOW) pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall' lint In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling _ - 6.91 Do,, - - - Mar 2 7 211?j l ,crs,f-IL. tN ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "No DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 1 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. ' For each sampled measurable storm event the total precipitation must be recorded using data fggm a9,ol�-site rain gauge. f 1 H 141, 3 L/` r `I I Last Revised 7/13/11 Permit Date: 7/1/2011-60/30/2015 D ate o aSt p meter cat ration. Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 1664A WT--HEM (mgAL) Total Suspended Solids (rng/L) Event Duration (minutes) Total o Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? W/O # of Months in Ter 2 Sampling2 6-92 1Sz 1002,3- - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC T ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one conv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 :Iscer.lifndr pqnally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to surha q ifsonnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those a on iresponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am a r th si ' ' nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 21 ,G�v (Signatu of Perm' ee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2