HomeMy WebLinkAbout20210300 Ver 1_ePCN Application_20210708 DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1,2021 Ver4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6' Yes
✓ No
Is this project a public transportation project?*
R Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20210300 1
Is a payment required for this project?*
✓ No payment required
6' Fee received Reviewing Office*
✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
la.Name of project:
Macon County-Bridge 43
1a.Who is the Primary Contact?*
Patrick J.Breedlove
1b.Primary Contact Email:* 1c.Primary Contact Phone:*
pjbreedlove@ncdot.gov (828)508-7397
Date Submitted
7/8/2021
Nearest Body of Water
Middle Creek
Basin
Little Tennessee
Water Classification
Class C;Tr.
Site Coordinates
Latitude: Longitude:
35.052140 -83.363523
A. Processing Information
County(or Counties)where the project is located:
Macon
Is this a NCDMS Project
✓ Yes ( No
Is this project a public transportation project?*
( Yes r No
Is this a NCDOT Project?*
( Yes r No
(NCDOT only)T.I.P.or state project number:
B-5919
WBS#(?)
17BP.14.R.210
Pre-Filing Meeting Information
Is this a courtesy copy notification?*
✓ Yes G No
ID# Version
2021033 Version 1
Pre-fling Meeting or Request Date
2/11/2021
Attach documentation of Pre-Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
Macon County-B43-Pre-Filing Acknowledgement.pdf 1.06MB
File type nest be FCF
1a.Type(s)of approval sought from the Corps:
[7 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
✓ No
lb.What type(s)of permit(s)do you wish to seek authorization?
r Nationwide Permit(NWP)
f7 Regional General Permit(RGP)
r Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
✓ Yes 6 No
Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and
interchanges
RGP Numbers(for multiple RGPS):
ld.Type(s)of approval sought from the DWR:
fJ 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
r Individual 401 Water Quality Certification
le.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes t No
For the record only for Corps Permit: r Yes t No
If.Is this an after-the-fact permit application?*
✓ Yes (' No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes (' No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
lh.Is the project located in any of NC's twenty coastal counties?
✓ Yes (' No
1j.Is the project located in a designated trout watershed?
(' Yes r No
B. Applicant Information
Id.Who is applying for the permit?
f7 Owner r Applicant(other than owner)
le.Is there an Agent/Consultant for this project?*
✓ Yes ( No
2.Owner Information
2a.Name(s)on recorded deed:
NCDOT Division 14
2b.Deed book and page no.:
2c.Contact Person:
2d.Address
Street Address
253 Webster Road
Address Line 2
City State/Bovine/Region
Sylva North Carolina
Postal/Zip Code Country
28779 United States
2e.Telephone Number: 2f.Fax Number:
(828)508-7397
2g.Email Address:*
pjbreedlove@ncdot.gov
C. Project Information and Prior Project History C^U
1. Project Information
1b.Subdivision name:
(if apprgxiate)
1c.Nearest municipality/town:
Franklin
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Address Line 2
Qly State/Bovine/Region
Postal/Zip Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Middle Creek
3b.Water Resources Classification of nearest receiving water:*
Class C;Tr.
3c. What river basin(s)is your project located in?*
Little Tennessee
3d.Please provide the 12-digit HUC in which the project is located.
060102020102
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Existing land use is an existing 40'6"L x 20'W timber floor on steel I-beam bridge on a two lane secondary road.Project site is located in a rural residential area with agriculture fields
nearby with forested land tracts.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r No r Unknown
4f.List the total estimated acreage of all existing wetlands on the property:
0.00
4g.List the total estimated linear feet of all existing streams on the property:
300
4h.Explain the purpose of the proposed project:*
Project is to replace an obsolete and deteriorating wood floor,steel I-beam bridge structure with a box beam bridge unit.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
NCDOT contractor will install erosion and sediment control measures.NCDOT contractor will install diversion devices.New box beam bridge will be installed.Rip-rap will be placed for
bank stabilization.Small UT to Middle Creek will be relocated,matted and replanted.Bank stabilization materials will be permanently installed once final grading allows.The deteriorating
bridge will be removed and stream banks will be matted and seeded.Temporary impacts will be restored.The project will be constructed utilizing the following equipment:crane,
excavator,dump trucks,paving equipment,pumps and hand tools.
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
C Yes r No fP Unknown
Comments:
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
C Preliminary r Approved C Not Verified 6' Unknown r N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known):
Agency/Consultant Company:
Other:
6. Future Project Plans
6a.Is this a phased project?*
C Yes f•No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a.Where are the impacts associated with your project?(check all that apply):
r Wetlands 17 Streams-tributaries r Buffers
r Open Waters r Pond Construction
3.Stream Impacts
3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
S1 Site 1-Dike/Diversion Temporary Dewatering Middle Creek Perennial Both 25 10
Average(feet) (linear feet)
S2 Site la-Bank Stabilization Permanent Bank Stabilization Middle Creek Perennial Both 25 6
Average(feet) (linear feet)
S3 Site 2-Dike/Diversion Temporary Dewatering Middle Creek Perennial Both 25 68
Average(feet) (linear feet)
S4 Site 2a-Bank Stabilization Permanent Bank Stabilization Middle Creek Perennial Both 25 43
Average(feet) (linear feet)
S5 Site 3-Dike/Diversion Temporary Dewatering UT to Middle Creek Perennial Both 1 180
Average(feet) (linear feet)
S6 Site 3a-Road Cross-section Permanent Relocation UT to Middle Creek Perennial Both 1 174
Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
223 258
3i.Total stream and ditch impacts:
481
3j.Comments:
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The existing bridge is being replaced with a structure that is adequate for traffic needs in the same general disturbed location.The box beam bridge
was designed for the minimum size criteria to ensure conveyance of traffic on the secondary road.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The on-site stream(Middle Creek)will be slightly diverted in two locations to install rip-rap bank stabilization and for the removal of the existing bridge.
The small UT to Middle Creek will also be dewatered during the relocation phase.Erosion and sediment control measures will be installed prior to
ground disturbance.Both of these measures will aid in the prevention of sediment into downstream habitats.
2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
C Yes r• No
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Project is a bridge to bridge replacement.No compensatory mitigation is required.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
CYes (' No
If no,explain why:
Project is not located within a N.C.Riparian Buffer Protection Area.
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
6 Yes CNo
Comments:
G. Supplementary Information
1. Environmental Documentation
1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
r Yes C No
lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPA/SEPA)?*
6 Yes r No
1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?*
CYes (' No
Comments:*
FHWA CE Completed.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
CYes (' No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
C Yes ( No
3b.If you answered"no,"provide a short narrative description.
The project is only to replace the existing subject bridge due to deterioration and does not increase the capacity of roads in the area.Project is not a
road widening or improvement project.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes R No r N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
f• Yes r No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
✓ Yes r No
5c.If yes,indicate the USFWS Field Office you have contacted.
Asheville
5d.Is another Federal agency involved?*
✓ Yes r No r Unknown
What Federal Agency is involved?
FHWA
5e.Is this a DOT project located within Division's 1-8?
✓ Yes G No
5f.Will you cut any trees in order to conduct the work in waters of the U.S.?
✓ Yes r No
5g.Does this project involve bridge maintenance or removal?
6 Yes r No
5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.?
✓ Yes r No
If you answered"Yes"to 5g(1),did you discover any signs of bat use?
✓ Yes G No r Unknown
5h.Does this project involve the construction/installation of a wind turbine(s)?*
✓ Yes a No
5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.?
6 Yes r No
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
U.S.Fish&Wildlife-ECOS-Online Mapper
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ yes a No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA-Essential Fish Habitat
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes f No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT Cultural Resource Specialist
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-yearfloodplain?*
a Yes r No
8b.If yes,explain how project meets FEMArequirements:
NCDOT Programmatic Agreement
8c.What source(s)did you use to make the floodplain determination?*
N.C.Flood Maps-FMIS
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one
file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach docurrent
Macon County-B43-GP 50 Cover Letter(Final).pdf 35.35KB
Macon County-B43-Maps.pdf 702.91KB
Macon County-B43-NRCS Soil Survey.pdf 504.96KB
Macon County-B43-Permit Drawings.pdf 2.12MB
Macon County-643-Site Photos.pdf 6.03MB
Macon County-B43-Historic Archictecture.pdf 3.93MB
Macon County-B43-Archaeology.pdf 2.88MB
Macon County-B43-Hydro Report.pdf 3.31MB
Macon County-B43-PJD(Signed).pdf 248.17KB
Macon County-B43-SMP(Signed).pdf 2.89MB
Macon County-B43-N.C.Hertiage Program.pdf 3.39MB
Macon County-B43-Bat Assessment Form.pdf 478.53KB
Macon County-B43-Mussel Survey.pdf 2.84MB
Macon County-B43-USFW Section 7.pdf 1.23MB
Macon County-B43-Tribal Coordination.pdf 1.99MB
Macon County-B43-UKB reply and Tribal email.pdf 2.03MB
Hie rust be R F or KW
Comments
Signature
F7 By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Patrick Jeremy Breedlove
Signature
Date
7/8/2021