Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5210702_Plansheet - Misc. Detail_20210708 (18)
o N N Cc 0 C cc QC0 aBill! Qa Qa3 . IZ-Iw=V HOC �:� FLOW �Z-I0C0 tLJ�FIz �069 ILJ�I IZ ���_ B- 11 LLJOFI o0N=Z NOTES _ a��oH NOTES Q��o� 9F�a�p. ���o� Hx~zLU F- � Hx~zLU EXCAVATE TEMPORARY SILT DITCH WITH NON -VERTICAL SIDE SLOPES AND NOT CO H O J °Co'-'¢ EXCAVATE TEMPORARY DIVERSION WITH NON -VERTICAL SIDE SLOPES AND NOT LU N H- O xa�Q F9F; e3: epvja ¢ tipa SEDIMENT CONTROL STONE Jp 9.q��9y6 s. 9. 9 to H O �LLI �J Z co Z M JABap.Y ejiFBvj efRF9 Z CD CC GREATER THAN 1.5:1 SLOPE. H GREATER THAN 1.5:1 SLOPE. H A ���� oa �b� H r Wp r ❑ r wp r ❑ A o�o b o ° cbo o��oa a a a ��o ao� Wp ❑ o° �$o STABILIZE TEMPORARY SILT DITCH AS DIRECTED. STABILIZE TEMPORARY DIVERSION AS DIRECTED. o°�o 00 0o NOTES $ o � �o ��° ao �° USE CLASS B EROSION CONTROL STONE a o;a� 2 0 2 $ a FOR STRUCTURAL STONE. B;Zoo;bo 11J STRUCTURAL STONE b USE N0. 5 OR N0. 57 STONE FOR SEDIMENT d COMPACTED COMPACTED SOIL x B CONTROL STONE. H O FILL SLOPE EXCAVATED MATERIAL v C.D i- H ��� 2' MINIMUM o Z C7 N CD :.i W H �C FLOW HZ-I N PLAN fZ-I 3= .10' 1'_611 �/ 3� LU 2'VTO p J MINIMUM p LU o H VAR. °C W ¢N 0' TO 2' o� o> < Q 6' TYPICAL Q Z Y co ace wo 0 Q d Q d 2/3 CHANNEL 1' MIN } Q Q tLl 3 Q i- WIDTHS V MIN `d °a a $ ° H 2' MIN D o `� ° 121 10 3 Q a CROSS SECTIONAL VIEW ���e09 ' �� � FI CROSS SECTIONAL VIEW IL SECTION A -A SECTION B-B LU SHEET 1 OF 1 ISHEET 1 OF 1 SHEET 1 OF 1 1630.03 11630.0511 11633.011 MAINTENANCE NOTES: 1. INSPECT DIVERSION CHANNELS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIKE. 2. CHECK OUTLETS, AND MAKE TIMELY REPAIRS AS NEEDED TO AVOID GULLY FORMATION. WHEN THE AREA ABOVE THE TEMPORARY DIVERSION DIKE IS PERMANENTLY STABILIZED, REMOVE THE DIKE, AND FILL AND STABILIZE THE CHANNEL TO BLEND WITH THE NATURAL SURFACE. NOTES: 1. CONCRETE WASTE MANAGEMENT PERTAINS TO WASTE FROM CONCRETE READY -MIX TRUCKS, MASONRY OPERATIONS, AND SIMILAR WASTE. 2. CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE, SHALL BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. ANY HARDENED CONCRETE RESIDUE WILL BE DISPOSED OF, OR RECYCLED ON SITE, IN ACCORDANCE WITH LOCAL AND STATE SOLID WASTE REGULATIONS. 3. DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS IS ALLOWED AT THE CONSTRUCTION SITE. ONLY COMMERCIALLY AVAILABLE ABOVE GROUND PORTABLE CONCRETE WASHOUT CONTAINERS ARE ALLOWED AND SHALL BE PROTECTED FROM VEHICLE TRAFFIC AND CLEARLY IDENTIFIED BY LEGIBLE SIGNAGE, AND SHALL BE LOCATED OUTSIDE OF VEGETATED BUFFERS AND AS FAR AS PRACTICABLE FROM STORMWATER CONVEYANCES AND IMPOUNDMENTS AND WATER BODIES. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL CONTAIN AND/OR ACTIVELY MANAGE BOTH, SOLID AND FLUID, COMPONENTS OF THE MIX. CONCRETE WASHOUT CONTAINERS SHALL BE CLEANED OR EXCHANGED WHEN THE REMAINING VOLUME IS REDUCED BY 85% TO PREVENT ANY POTENTIAL OVERFLOW IN A STORM EVENT. 4. ALTERNATIVELY WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE RIP RAP AND/OR OTHER USEFUL CONCRETE PRODUCTS. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. THE GC IS RESPONSIBLE FOR ASSURING THAT THESE PROCEDURES, APPLICABLE LAWS, AND ENVIRONMENTAL REGULATIONS ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT CONTAINERS SHALL BE SHOWN ON THE SITE MAPS. CEMENT AND CONCRETE WASHOUT T 15' 25' MINIMUM SILT 2' 2' 1' 2' 6' 2' FENCE 1 1 L 7 VEHICLE ENTRANCE @ 2� % SLOPE 1 3 PIT SUMP 2 KEY IN REMOVABLE LINING ANCHOR PLASTIC LINER 10 MIL. PLASTIC LINING WITH #57 STONE BERM SECTION A -A SILT FENCE SILT FENCE SF I I TOP RIM OF STONE BERM O _ LINED- LL - - - VEHICLE ENTRANCE - - - PIT _ - - 6" WASH STONE - - SUMP - - - - - "CONCRETE WASHOUT" SIGN (SEE NOTE 2) © 1 STOCKPILE (SEE DETAIL ON SHEET D-2.1 ) TEMPORARY STOCKPILE DETAIL NOT TO SCALE MAINTENANCE NOTES: 1. INSPECT DIVERSION CHANNELS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIKE. 2. CHECK OUTLETS, AND MAKE TIMELY REPAIRS AS NEEDED TO AVOID GULLY FORMATION. WHEN THE AREA ABOVE THE TEMPORARY DIVERSION DIKE IS PERMANENTLY STABILIZED, REMOVE THE DIKE, AND FILL AND STABILIZE THE CHANNEL TO BLEND WITH THE NATURAL SURFACE. NOTES: 1. ACTUAL LAYOUT TO BE DETERMINED IN FIELD. 2. THE "CONCRETE WASHOUT" SIGN SHALL BE INSTALLED WITHIN 30 FEET OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 3. PIT CAPACITY IS MINIMUM OF 6 CUBIC FEET PER 10 CUBIC YARDS OF CONCRETE. 20' 2' 2' 1' 2' 6' 2' 1' 2' 2' SILT I.-H � FENCE 1AM1 , / 3 PIT SUMP \ 10 MIL. PLASTIC LINING ANCHOR PLASTIC LINER WITH #57 STONE BERM SECTION B-B PLYWOOD 48"x24" PAINTED WHITE I�4. °CONCRETE° BLACK LETTERS 0.5" LAG WASHOUT 6" HEIGHT SCREWS 3"x3"x8' 3' WOOD POSTS 7 I i - . 1_ iu I- SIDE VIEW FRONT VIEW "CONCRETE WASHOUT" SIGN DETAILS CONCRETE WASHOUT PIT i o� Llass 6 Rip " . Pipe Invert, 36' Flow _::::> '� Flow „rn Natural Ground Riprap Headwall, I' min height from road shoulder �ipe Invert Figure 6.55a Rock pipe inlet protection plan view and cross-section view 6.551 Rev. W06 MAINTENANCE NOTES: 1. INSPECT RIPRAP OUTLET STRUCTURE WEEKLY AND AFTER SIGNIFICANT (z INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. TEMP. DITCH o4�13 9 STRUCTURAL STONE BACK SLOPE ISOMETRIC VIEW MAINTENANCE NOTES. 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLYAND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS) 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DA. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. OF PAVEMENT NOTES USE CLASS B EROSION CONTROL STONE FOR STRUCTURAL STONE. THE ENGINEER MAY DIRECT THE OPTION OF CLASS A STONE FOR SITES HAVING LESS THAN ONE (1) ACRE DRAINAGE AREA AND A DITCH GRADE LESS THAN 3%. f1' MIN. NATURAL GROUND CROSS SECTION VEE DITCH BASE OF DITCH NATURAL GROUND 1' MIN. 12" MIN. FLOW - 12" MIN. a'-6" CROSS SECTION TRAPEZOIDAL DITCH ELEVATION VIEW MAINTENANCE NOTES: 1. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS) 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DA. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 8' MAX. WITH WIRE MAX. WITHOUT WIRE MIDDLE AND VERTICAL WIRES SHALL BE 12%! GAUGE MIN. TOP AND BOTTOM STRAND - SHALL BE 10 GAUGE MIN. WIRE GEOTEXTILE USE GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 5 LINE WIRES WITH 12" VERTICAL SPACING. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH MAINTENANCE NOTES: 1. SEDIMENT FENCE- INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF THE SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 24" MAX. (18" MIN.) z 00 H � QQ ''2�U ILL J'L Il 2E O O O x cc 2E LU U < O co H H O J QOcnQ Z ~ N d o❑ m W IL c ILL z W rti = 2 cc �o ca Z Co O [C o IL E W H SHEET 1 OF 1 1633.02 z oCl) F-Q Q r. Z 2 = U ILL J'L Il 2E O O O = 2 z 1--Q=0OI F- CO L 0 J Z O N ~N d ❑ o _ o W IL v Z z W 3 LL 2 � ❑ J aFBI N z c CL W o Q SHEET 1 OF 1 1605.01 2 �, //\\/\ 4 r...: / / / . . . . . . �11 �� O rJJ". ".".". 11 r �� ". .".""""" . . . . . . . . 6„ .".".".". 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12"PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET INDIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES INAPPROPRIATE LOCATIONS AS PER MANUFACTURER'S RECOMMENDATIONS. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 4"-6" (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE SEAM STITCH ON THE BLANKET BEING OVERLAPPED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" APART AND 4" ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 9. PLACE STAPLE/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE APPROPRIATE CHANNEL FLOW OR SHORELINE APPLICATION A NOTE: B C CRITICAL POINTS 1. HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE 2. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE A SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" MAY B BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. C 3. FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIFICATION FOR PRODUCT SELECTION. EROSION CONTROL LINING (CHANNEL INSTALLATION) N.T.S. NCDENR MAINTENANCE NOTE: 1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT INCLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. 6 6" F_ 0 z w ILL! ILL! U) w U zDZInU LLIC�2U-U� c�zwLuU)>w z�c��o�cn � W T- LLI z J>z0W(n0 U Q Q z Q 0 0 z � z � Uzv~20 zJ��n��(n Q z U z > J U w U REVISIONS REV DATE COMMENT Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. K of o of =o wo 01 z-" t� Q0 �w om 1@ ow Qom i z= 0 o m m o O amma a S, O c` 0 zz zo 0 DRAWN BY FOR REVIEW PURPOSES ONLY THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCR211056 DRAWN BY: SJK CHECKED BY: CEY DATE: 7/2/2021 CAD I.D.: CNDS-0 SITE IMPROVEMENT PLANS FOR GFD MANAGEMENT INC.1 LOUISBURG ANNEX LOUISBURG PLAZA RETAIL WAY FRANKLIN COUNTY LOUISBURG, NC 27549 BOHLER# BOHLER ENGINEERING NC, PLLC NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone: (919)578-9000 NC@)3ohlerEng.com OFESS �0�i°° SEAL =: 485 E. SHEET TITLE: EROSION DETAILS SHEET NUMBER: C-904 e n ORG. DATE - 6/23/2021