Loading...
HomeMy WebLinkAboutSW5210702_Plansheet - Misc. Detail_20210708 (12)N PROP. SILT FENCE OUTLET (TYP.) ------------------------------------- - --------------------- /NV. /NV. /NV. \ 50' TAR PAY RIPAR/AN BUFFER \ i ----�----------- ---------- ---- - ------------------ ---------------- --------------------------------- --------------- - - - - - - - - - - - - - - - - - - - - - - -6 / \ G SETBACK - - ------ - - 7S�%�C Q --BOILDIN - ------------- - ,,- - ---- �"-'-' 201 - - - -------------------------------' - ,,_,- - - 00---------------------------- _--------------------------- _--------------------------- _--------------------------- - - - - - - _ - ---------- - ---------- -----------, , --------------------- ------- --------------------------------- ___ ------ ------- ----------- ---------------- - - - - - ------------------- �_------------0,-------- , --- 0� --------p�------� 00l� �S�r------ 0 l -s0 ( / it i i i I i i I I I I I I ------- -- I i i I i I I a Is I I I I I PROP. INLET PROTECTION (TYP.) i I � I I I I I I I I I I I � I I I I I I I I I I I I I � I I I I I I I I I I I I I I I I I I I y I I I I I I I I I I I I I I I Ij r I I I I / , , i // LOD; / LOD LiD LOD LOD LOD LOD MD LODE LOD 1_0� LOD�LOD LOD ' LOD It�D OD ; LOD LOGY/ LOD LOD LOD-,LOD L LODTLOD LOD ; / RETAIL WAY \ , (50' PUBLIC R/W) W W �� W W I I W W� 8" D/P WATER MA/N 372.53 LF OF 8" PV EX. C S4N. MAIN �8 ------- l _ / ----- --'--- '---'----'---' ---____- -- ---'-------- -- _ _" � _,�----------- � �--------- __-------____-------- I -------- / /NV. OUT (9) = 279 95' , '��' ---------'----""----------------- ------ ` \ I 50' TAR-10" R/PARl4N BUFFER I I I I I I I I I I I l i i l I I I � I I EROSION CONTROL LEGENT PROPOSED NOTE TYPICAL NOTE TEXT SF SF SILT FENCE TPF TPF TREE PROTECTION FENCE - DID - - DID DIVERSION DYKE LOD LOD LIMITS OF DISTURBANCE ' CHECK DAM TEMPORARY SOIL STOCKPILE ® CONCRETE WASH PROP. CONST. ENTRANCE ® SILT FENCE OUTLET SEDIMENT SILT BAG INLET PROTECTION DRAINAGE AREA OUTLINE EROSION CONTROL NOTES 1. REFER TO GENERAL NOTES SHEET C-102. 2. A PRE -CONSTRUCTION MEETING IS REQUIRED FOR THIS PROJECT. 3. EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING THE ENTIRE LIFE OF THE PROJECT. 4. CONTRACTOR SHALL CONDUCT GRADING OPERATIONS IN A MANNER THAT ENSURES NO SEDIMENT IS ALLOWED OFF -SITE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO ENSURE THAT NO SEDIMENT IS ALLOWED OFF -SITE. IF ADDITIONAL MEASURES ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY TO DISCUSS DESIGN MODIFICATIONS. 5. ALL STREETS ADJACENT TO AND IN FRONT OF THE PROJECT SHALL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED AT THE CONTRACTOR'S EXPENSE. 6. CONTRACTOR SHALL CONSTRUCT DIVERSION DITCHES AND BERMS TO ENSURE ALL RUN-OFF IS DIRECTED TO AN EROSION CONTROL MEASURE. 7. ALL TEMPORARY AND PERMANENT GROUND COVER SHALL BE ESTABLISHED PER THE UPDATED NCDENR REQUIREMENTS. SEE CHART ON THIS SHEET. 8. TREE PROTECTION FENCING SHALL BE INSTALLED AND INSPECTED AND BMP OUTLET STRUCTURES MUST BE ON -SITE PRIOR TO THE ISSUANCE OF A GRADING PERMIT. 9. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT WRITTEN AUTHORIZATION OF THE TOWN'S ZONING COMPLIANCE STAFF. ANYACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION) SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE TOWN'S ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH THE LAND DEVELOPMENT ORDINANCE. 10. ALL CATCH BASINS SHALL BE PROTECTED PER DETAILS, UNLESS NOTED OTHERWISE. 11. TOPSOIL SHALL BE STRIPPED AND STOCKPILED AND MAY BE USED FOR BERMING IN THE STREETSCAPE BUFFER OR PLACED IN NON STRUCTURAL FILL AREAS. 12. ANY CUT OR FILL SLOPE THAT IS 2:1 OR GREATER SHALL BE STABILIZED WITH PERMANENT SLOPE DETENTION DEVICES OR A SUITABLE COMBINATION OF PLANTINGS AND RETENTION DEVICES. SLOPES GREATER THAN 3:1 SHALL NOT BE STABILIZED WITH TURF GRASS BUT MUST BE STABILIZED WITH VEGETATION THAT REQUIRES MINIMAL MAINTENANCE SUCH AS WEEPING LOVE GRASS, RED FESCUE OR OTHER APPROVED VARIETY. 2.5:1 13. CONTRACTOR SHALL WALK THE SITE WITH THE OWNER'S REPRESENTATIVE PRIOR TO COMMENCING GRADING OPERATIONS TO IDENTIFY ANY TREES (IN ADDITION TO CHAMPION TREES NOTED ON THESE PLANS) THAT ARE DESIRABLE TO SAVE. TREES SHALL BE MARKED AND A REASONABLE EFFORT SHALL BE MADE TO SAVE IDENTIFIED TREES. 14. ALL STOCKPILES SHALL BE PROTECTED ON DOWNSTREAM SIDES WITH SILT FENCE. 15. CONTRACTOR SHALL ENSURE THAT PERMANENT GROUND COVER WILL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER IS SHORTER. 16. THE STORMWATER CONVEYANCE SYSTEM SHALL BE BUILT UP TO STRUCTURES USED AS RISER BASINS DURING CONSTRUCTION OF RISER BASIN. STRUCTURE SHALL BE CORED FOR THE INSTALLATION OF A SKIMMER AND VALVE. AT TIME OF FINAL GRADE STABILIZATION, THE SKIMMER AND VALVE SHALL BE REMOVED AND THE STRUCTURE GROUTED. 17. BRIDGEMAT (OR SIMILAR) SHALL BE USED FOR STREAM CROSSING OF CREEK TO ALLOW ACCESS FOR WORKING ON THE WESTERN PORTION OF THE SITE. THE CROSSING, AND ANY OTHER CONSTRUCTION ACTIVITIES, SHALL BE DONE IN A MANNER THAT ENSURES NO DISTURBANCE OF THE EXISTING STREAM CHANNEL. 18. TO MINIMIZE DAMAGE TO EXISTING TREES LOCATED NEAR THE INTERIOR EDGE OF TREE PROTECTION AREAS, THE CONTRACTOR SHALL CUT TRENCHES, A MINIMUM OF TWO FEET DEEP, ALONG THE LIMITS OF DISTURBANCE IN ORDER TO CUT, RATHER THAN TEAR, EXISTING ROOTS. 19. CONSTRUCTION ENTRANCES MUST BE MODIFIED TO ACHIEVE ADA COMPLIANCE WHERE APPLICABLE. 20. ALL WETLAND IMPACTS SHALL BE PERMITTED THROUGHT THE USACE AND TOS, AS REQUIRED. 21. TO MINIMIZE DAMAGE TO EXISTING TREES LOCATED NEAR THE INTERIOR EDGE OF TREE PROTECTION AREAS. THE CONTRACTOR SHALL CUT TRENCHES. A MINIMUM OF TWO FEET DEEP. ALONG THE LIMITS OF DISTURBANCE IN ORDER TO CUT. RATHER THAN TEAR. EXISTING ROOTS. PHASE 11 EROSION CONTROL CONSTRUCTION SEQUENCE. 1. ONCE GIVEN APPROVAL FROM EROSION CONTROL INSPECTOR, CONTRACTOR TO BEGIN STAGE 2 OF THE EROSION CONTROL PLAN. 2. SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE ENVIRONMENTAL INSPECTOR TO DISCUSS STAGE 2. 3. INSTALL STORM DRAINAGE AND UTILITIES, AND FINISH FINE GRADING THE SITE. ADJUSTING TEMPORARY SEDIMENT BASINS AS NEEDED TO PREVENT EXCESS SEDIMENTARY RUNOFF AS THE SITE IS BROUGHT UP TO GRADE. 4. INSTALL INLET PROTECTION ON PROPOSED INLETS UPON COMPLETION OF INSTALLATION. 5. PREPARE SITE FOR PAVING. 6. BEGIN PAVING 7. IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 8. OBTAIN CONCURRENCE FROM THE EROSION CONTROL INSPECTOR THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: 8.1. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), 9. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE HTTPS:HFILES.NC.GOV/NCDEQ/ENERGY%20MI NERAL%20AND%20LAND%20RESOURCES/ STORMWATER/NPDES%20GENERAL%20PERMITS/DEMLR-CSW-MONITORING-FORM-REV- AUGUST-8-2019.PDF . TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. 10. APPROVED/CERTIFIED INSPECTOR/PROFESSIONAL ENGINEER SHALL INSPECT ALL PHASE II EROSION CONTROL FEATURES WITHIN 7 DAYS OF COMPLETION OF INSTALLATION. 11. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT." NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION -RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR. Q$3 �P oat s �$ 20 10 5 0 20 L) J J a L) Z Z it W W Z 3 W e%, J 2 moo 0 Z_ 0' W W W U) ? �a� W C� z 5 z W 0 W C 2 a� 0 Z W W5;W Z>-U~0a�(n HWQ= Wz _J>zowwo U)<zQ O0Q0-z�� U z U ~ d z J U) U)� U) Q �z(n�Z > J U W U) REVISIONS REV DATE I COMMENT Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. K w 0 aN oo wo o- zz >N oo 00 oR o� ww om oz Iq ow z. Qom m_ o-w m m o O Sa om 0 zz z o DRAWN BY M FOR REVIEW PURPOSES ONLY THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: NCR211056 DRAWN BY: SJK CHECKED BY: CEY DATE: 7/2/2021 CAD I.D.: EROS-0 SITE IMPROVEMENT PLANS FOR GFD MANAGEMENT INC.1 LOUISBURG ANNEX LOUISBURG PLAZA RETAIL WAY FRANKLIN COUNTY LOUISBURG, NC 27549 BOHLER# BOHLER ENGINEERING NC, PLLC NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone: (919)578-9000 NC@)3ohlerEng.com �111111111/, /. OFESS /�4,aa, aQ Yea SEAL 485 - 0 / II I I I II\\ \\\�/2/2/ SHEET TITLE: EROSION CONTROL STAGE 2 SHEET NUMBER C-602 o N N C, 0 c 081 ORG. DATE - 6/23/2021