Loading...
HomeMy WebLinkAboutGW1-2021-03517_Well Construction - GW1_20210607 �r�rarr,v�ria.. WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well'Ctintracto�rr Information: r 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION �- ��N 2021 ft 0 it. o jt ft % NC Well Contractor Cemficarion Number riCC SSin�U 15.OUTER CASING for muld-cased wells OR LINER 's llcable 1�'R ss'- ^vn FROM TO DIAMETER THICKNESS MATERIAL Well J . I '�t f V. TT ft. ! 1n. Company Name e 16.INNEit CASING OR TUIiTNG 'eotbermal dosed-loop).� 2.Well Construction Permit#: d 0 FROM TO DIAMETER THICKNESS ATERIAL List all applicable well construction permits(i.e.UIC,Count),,State,Variance,etc.) % & in. 3.Well Use(check well use): ft. ft. in. Water Supply Well: 11.SCREEN: FROM TO DIAMETER SLOT SITE THICKNESS MATERIAL Agricultural unicipal/Public ft ft. In. Geothermal(Heating/Cooling Supply) gResidential Water Supply(single) ft. fL in. Industrial/Commercial OResidential Water Supply(shared) 18.GROUT 11'rt ation FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft , it. -hied AA h !JCAIT�k .Monitoring Recovery ft. ft Injection Well: ft. ft. Aquifer Recharge DGroundwater Remediation 19.8AND/G12AYF.I:PACK If applicable) Aquifer Storage and Recovery 13Salinity Barrier FROM I TO MATERIAL EMPLACEMENT METHOD Aquifer Test OStonnwater Drainage Experimental Technology Subsidence Control ft. ft Geothermal(Closed Loop) Tracer 20.DRILLING LOG attach additional sheets if neeessa Geothermal(Heatin Conlin Return) Other(explain under#21 Remarks FROM TO DESCRiMON color hardness,soil/rock in etc 6 ft. ft. SO 4.Date Well(s)Completed: 9-9)Well ID# z ft. 30 ft 4 Sa.Well Location: O n• (� ft• �� y-O G Th(xt Sz a( 61�rs ft ft Facility/Owner Name rd p Facility ID#(if applicable) ft. ft. v �� ���howl . ZeG tJph, A7517 Physical Address,City,and Zip ft. ft. A f g a 7,1 rQ d g7 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one Iat/long is sufficient) 22.Cer Ieation- I N W 6.Is(are)the well(s)dermanent or Temporary Si of Certified ell Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: [3Yes or EfNo with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a If this is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well constructign,only I GW-1 is needed, Indicate TOTAL NUMBER of wells construction details, You may also attach additional pages if necessary. drilled: 1 SUBMITTAL INSTRUCTIONS; 9.Total well depth below land surface: 160 (ft-) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if d fferent(example-3Q200'and 2@100) construction to the following: 10.Static water level below top of casing: 2a (ft.) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24b.For Inlecdon Wells: In addition to sending the form to the address in 24a above,also submit one copy of this form within 30 days of completion of well 12.Well construction method: ro-fg vY construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) Method of test: _ 24c.For Water Suoaly&Injection Wells: In addition to sending the form to j, I the address(es) above, also submit I one copy of this form within 30 days of 13b.Disinfection type: f -t Amount: Z !� completion of well construction to the county health department of the county where constructed. Forth GW-1 North Carolina Department of Environmental Quality-Division of Water Resource's Revised 2-22-2016 i