Loading...
HomeMy WebLinkAboutNCC205045_NOT Closeout Documents_20210708North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Guilford Project: Fairfax Meter Lab/Trans-Mobile River basin: Cape Fear Person financially responsible: Duke Energy Progress - Paula Gourley, Regional Project #: GUILF-2020-023 Manager -Land Services Address: 422 S. Church Street, Charlotte, NC 28242 1. Project Location: Fairfax Rd., Greensboro Pictures: Yes - Digital 2. Weather and soil conditions: 80's, Clear, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): A. Johnson Title: Project Superintendent Inspection report: Sent Report Date given/sent: July 01, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Turney Others present: Date of inspection: June 30, 2021 Time arriving on site: 10:00 AM Time leaving site: 10:30 AM