Loading...
HomeMy WebLinkAboutNCC203485_NOT Closeout Documents_20210708North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Beaufort Project: Line I82 Removal Wharton Washington River basin: Tar -Pamlico Person financialy responsible: Virginia Electric and Power Company- Kevin J Project #: BEAUF-2021-001 Fields, Authorized Representative Address: 10900 Nuckols Rd 4th Floor, Richmond, VA 23060 1. Project Location: Multiple, Washington Pictures: No 2. Weather and soil conditions: 90 degrees, sunny, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwaterrequirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No contact was made. Title: Inspection report: Sent Report Date given/sent: July 07, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. The project is in compliance and released under the SPCA. The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reportedby: ScottGraboski Others present: Date of inspection: July 06, 2021 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM cc: