Loading...
HomeMy WebLinkAboutNCC203485_Notice of Termination_20210708Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/8/2021 11:47:16 AM (NOT Submittal) Approve by Morman, Alaina 7/9/2021 10:01:23 AM (NOT Request Review- NCC203485) • The task was assigned to Morman, Alaina. The due date is: July 13, 2021 5:00 PM 7/8/2021 11:47 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC203485 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status May be blank (if not yet billed) Information associated with this permit: Project Name Line 182 Removal Wharton -Washington Address Multiple, Washington, NC County Beaufort Latitude 36.0000 Longitude -77.0000 Permittee Listed Virginia Electric and Power Company d/b/a Dominion Energy North Carolina Legally Responsible Kevin Fields Individual NC Reference No. NCG01-2020-3485 E&SC Plan ID Beauf-2021-001 Original NOI 29770 Tracking No. Date COC Issued 8/13/2020 Prior Rescission Date populates only if COCwas already rescinded at tirre of submttal. Date Reason for Rescission/Termination Request: Reason for F Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Add Tonal IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Gbcurnentation if applicable. Documentation NLstbeFOFforrrat Project Close-out Information: Final Close-out 7/6/2021 Inspection Approval Project Close-out 210706 Line 182 Removal Wharton Washington Approval 20.84KB BEAUF-2021-001 (002).pdf Documentation Wst be FDFforrrat North Carolina General Statute 143-215.613 (i) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Artide or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Artide or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. 'This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Donald Hoover Title * Manager, Electric Transmission and Substation Construction Organization * Virginia Electric and Power Company Date * 07/08/2021 Email for donald.hoover@dominionenergy.com Confirmation * Contact Telephone* 8047731046 NOT Certification Notice of Termination (NOT) Certification Form.pdf 669KB Form Mist be FDF Forrrat Is this COCAlready Ensure this OOChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Erails (Optional) chelsea.l.sachs@dominionenergy.com Original Permittee CCdonWificationErails Email Kevin.L.Fields@dominionenergy.com Original Site Contact CCd on Notificaiton Ermils Email james.e.clay@dominionenergy.com