Loading...
HomeMy WebLinkAboutNCC201874_Notice of Termination_20210708Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/8/2021 11:21:08 AM (NOT Submittal) Approve by Morman, Alaina 7/9/2021 8:58:32 AM (NOT Request Review- NCC201874) • The task was assigned to Morman, Alaina. The due date is: July 13, 2021 5:00 PM 7/8/2021 11:21 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC201874 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAST DUE fvby be blank (if not yet billed). This permittee owes a fee that is PAST DUE and has a pending NOD or NOV. Do not approve this NOT request until payment is resolved. If this NOT request is acceptable, payment may be waived if applicable, but that action must be completed first (at the NOD or NOV Review step) to ensure records are routed to the correct folder in the repository. However, you can reject the NOT now if it is not acceptable. Information associated with this permit: Project Name Dollar General - Claremont Store #21683 Address May 10, Claremont, NC County Catawba Latitude 35.6766 Longitude -81.1149 Permittee Listed Teramore Construction Legally Responsible Zach Crumley Individual NC Reference No. NCG01-2020-1874 E&SC Plan ID CBPR-04-2020-34427 Original NOI 25235 Tracking No. Date COC Issued 5/7/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Termination Request: Reason for f Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a newCOC) Coverage * r Mistake or Invalid Coverage r Other The job was canceled. NOI is not needed Add ional Mxe information about the basis of this request, if needed. Explanation The job was canceled. NOI is not needed. Supporting Upload Supporting Ibcurrentation if applicable. Documentation Fwd_ [External] NOT for COC No. NCC201874.pdf 123.49KB Mast be RYfornat Project Close-out Information: Final Close-out Inspection Approval Project Close-out Mist beFDFfornat Approval Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Zach Crumley Title * Senior VP Organization* Teramore Development Date * 07/08/2021 Email for scolvin@teramore.net Confirmation * Contact Telephone* 2295164289 NOT Certification NOT_Claremont.pdf 351.71KB Form Mast be FDF Fornat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) Original Permittee CCdonNotificationBmils Email tglass@teramore.net Original Site Contact CCd on Notificaiton Errails Email tglass@teramore.net