Loading...
HomeMy WebLinkAboutNCC205773_NOT Closeout Documents_20210708North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Harris Plant -Wake 230kV (OL146) River basin: Neuse Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: WAKE-2021-037 Director of Transmission Permitting Address: 440 South Tryon St, Charlotte, NC 28202 1. Project Location: 5224 Holland Church Road, Panther Branch Pictures: No 2. Weather and soil conditions: Drizzle, wet, partially workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: June 23, 2021 9. Corrective action needed: Yes 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: June 22, 2021 Time arriving on site: 10:30 AM Time leaving site: 10:40 AM cc: