County: Wake Project: Harris Plant -Wake 230kV (OL146) River basin: Neuse
Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: WAKE-2021-037
Director of Transmission Permitting
Address: 440 South Tryon St, Charlotte, NC 28202
1. Project Location: 5224 Holland Church Road, Panther Branch
Pictures: No
2. Weather and soil conditions: Drizzle, wet, partially workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one on site Title:
Inspection report: Sent Report Date given/sent: June 23, 2021
9. Corrective action needed:
Yes
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present:
Date of inspection: June 22, 2021 Time arriving on site: 10:30 AM Time leaving site: 10:40 AM