Loading...
HomeMy WebLinkAboutWQ0038045_Sewer Extension Permit Status Update_20210708 ROY COOPER I. '' ,Il s2 .%Governor 1� N s6'��Tv 4 JOHN NICHOLSON �5R°,sue Interim Secretary KR _ S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality June 17,2021 Pete Ramey RECEIVED Meadowlands Development LLC JUL 0;$ zOz1 PO Box 10 Bethania, NC 27010 NCDEQ/DWR/NppES Subject: Final Engineering Certification Request Meadowlands Development LLC Davidson County Dear Permittee: Based on a review of our records for permits issued during the period of 2016 through 2017, it appears that the Division of Water Resources(Division) has received a partial engineering certification but has not yet received a final engineering certification for the Wastewater Collection System Extension Permit(s) listed below in accordance with 15A NCAC 02T.0116 as well as the standard conditions of the permit. • Permit No.WQ0038045: Meadowlands-The Heritage LPSS issued on 12/7/2017 If the permitted facility has been fully constructed and is in operation,a complete and final engineering certification is required to be submitted prior to placing the system into service. It should be noted that failure to certify a sewer extension permit appropriately in accordance with the provisions of 15A NCAC 02T.0116 may result in enforcement action.A complete certification is one that includes a copy of the construction record drawings(plan and profile views of all sewer lines), pump station design calculations (if applicable), and the certification form as provided with the original permit. Please note that the Division may not acknowledge the receipt of certifications, however,the status can be viewed at any time using our online Sewer Extension Permit Tracker located on the Municipal Permitting Unit website. If any portion of the permitted facility shall not be constructed,the Permittee must request a modification to the permit to remove any parts of the permitted sewer system that will not be constructed. If the Permittee no longer owns the facility or the Permittee's name has changed, please return the attached Status Update requesting information for ownership/name change. Please note that Permits are not automatically transferable in the event the project site is now owned by others. The Division requests a response from the Permittee by July 14,2021. The Status Update form on the back of this letter should be completed and included with all submittals. If you have any questions regarding this outreach program,please contact Collin Geersen via e-mail at Collin.Geersen@ncdenr.gov. Alternatively,voice mail messages can be left at(919)707-3608. Sincerely, Christyn L. ertenbaugh, P.E., Environmental Engineer Municipal Permitting Unit, Division of Water Resources cc: Winston-Salem Regional Office,Water Quality Section Regional Operations[electronic] Municipal Permitting Unit[electronic copy] ANorth'Carolina Department of Environmental Quality I Division of water Resources 512 North Salisbury Street 1 1617 Mall Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROLINA D Deparband of Earkortrnental°ugly �'� 919.707.9000 Request for Final Engineering Certification Date of Letter: June 17,2021 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return this form and supporting documents by July 14,2021 to the attention of Collin Geersen at the Division's Municipal Permitting Unit by the delivery method below: NCDEQ/DWR WQPS—Municipal Permitting Unit By U.S. Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Collin Geersen Raleigh, NC 27699-1617 Raleigh, NC 27604 Collin.Geersen@ncdenr.gov Permit No.:WQ0038045 Permittee: Meadowlands Development LLC Project Name: Meadowlands -The Heritage LPSS Project Status (Complete Signature&Date section below. Check appropriate box'to indicate Permittee's response.) Name&Title(print): ` J� /� F' `y//970 61 -- Signature: L— — f Date: fa�o-01 AA Comments: SEWER NOT YET FULLY CONSTRUCTED 1The Permittee certifies that the remainder of the project shall be constructed in the future in conformity with the approved Permit, project plans,specifications,and supporting documents.The Permittee understands that the appropriate additional certification documents will need to be forwarded to the Division prior to operation of any future components. Subject permit shall be maintained in Active status. ❑ The Permittee has determined that the remaining portion of the permit shall not be constructed,and will request a permit modification from the appropriate office to remove any outstanding items. SEWER HAS BEEN FULLY CONSTRUCTED ❑ Final Engineer's Certification: The Permitted project has been fully constructed and the required Certification page and supporting documents are being submitted to the Division with this form. OWNERSHIP/NAME CHANGE&UPDATES ❑ The Permittee requests information to apply for ownership or name change. Please provide email and phone number below for follow-up. ❑ The Permittee requests that their contact information be updated(such as changes in elected officials,phone number,or mailing address where the owner is the same). Updated Contact Information for Permittee Contact Person&Title(Print): � / �'9m/5y Mailing Address: PO ,Oxl c 7 2/0 Email: / ..-- -r1Zf)mePgiVb11— 4LIU/4— Phone: cam? Gam— 7020 Additional Comments: