HomeMy WebLinkAbout20210948 Ver 1_Buffer Determination_20210608ROY COOPER
Governor
JOHN NICHOLSON
Interim Secretary
S. DANIEL SMITH
Director
Karl Brown Manning and Pamela J. Manning
3731 Dickinson Avenue
Greenville, North Carolina 27834
NORTH CAROLINA
Environmental Quality
June 8, 2021
2021-0948 vl (Express)
Pitt County
Subject: On -Site Determination for Applicability to Tar -Pamlico Riparian Buffer Rules (15A NCAC 02B .0734) (EXPRESS Program)
Subject Property/ Project Name: The Dickinson
Address/Location: 3731 Dickinson Avenue, Greenville NC (Pitt County Parcel #14234)
Stream(s) Evaluated: (1) — UTs to Greens Mill Run, Class C, NSW; Stream Index 28-96; Tar -Pamlico River Basin
Determination Date: May 28, 2021
Staff: Chris Pullinger
Determination Type:
Buffer:
Stream:
• Neuse (15A NCAC 02B .0714)
■ Intermittent/Perennial Determination
// Tar -Pamlico (15A NCAC 02B .0734)
• Catawba (15A NCAC 02B .0614)
• Jordan (15A NCAC 02B .0267) (governmental and/or
interjurisdictional projects)
• Randleman (15A NCAC 02B .0724)
• Goose Creek (15A NCAC 02B .0605-.0608)
Stream
E/I/P*
Not
Subject
Subject
Start@
Stop@
Soil
Survey
USGS
Topo
2021-0948 v1 A
E
X
2021-0948 v1 A Start
2021-0948 v1 A Origin
X
2021-0482 v1 A
I
X
2021-0948 v1 A Origin
2021-0948 v1 A Finish
X
*E/I/P = Ephemeral/Intermittent/Perennial
The Division of Water Resources has determined that the streams listed in the table above and included on the attached map have been
located on page 40 of the most recent published (1974) NRCS Soil Survey of Pitt County, North Carolina and/or the most recent copy of the
USGS National Map (https://apps.nationalmap.gov/viewer) and evaluated for applicability to the Tar -Pamlico Riparian Buffer Rules. Each
feature that is checked "Not Subject" and highlighted on the attached maps in "red" has been determined to be either man-made in nature,
ephemeral, or not present on the property. Features that are checked "Subject" and highlighted on the attached maps in "blue" have been
located on the property and possess characteristics that qualify them to be at least natural intermittent streams. There may be other streams
or features located on the property that do not appear on the maps referenced above but may be considered waters of the State and
jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act.
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a
determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar
days of date of this letter to the Director in writing.
If sending via US Postal Service:
c/o Paul Wojoski
DWR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
If sending via delivery service (UPS, FedEx, etc.):
c/o Paul Wojoski
DWR — 401 & Buffer Permitting Unit
512 N. Salisbury Street
Raleigh, NC 27604
This determination is final and binding as detailed above unless an appeal is requested within sixty (60) days.
£ D_E
NORTH CAROLINA
Department of Environmental fluali�
North Carolina Department of Environmental Quality 1 Division of Water Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers or
waters. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the
Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910)-251-4629.
If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918.
cc:
Sincerely,
Raire4T J 4
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
Pamela J. Manning (via e-mail: Pmanning0114@gmail.com)
Igor Palyvoda, Baldwin Design Consultants, PA (via e-mail: ialyvoda@baldwindesignconsultants.com)
Emily Thompson, USACE Washington Field Regulatory Office (via e-mail)
Randall Jones, WaRO DEMLR (via e-mail)
Lyn Hardison, One Stop Permitting — WaRO (via e-mail)
WaRO DWR File Copy/LASERFICHE
71r%
North Carolina Environmental
Management Commission
Division d Wader Resources
��, Tar -Pamlico Basin Buffer
Date June 8 Z n
Reviewed by
DWR Project .#2021-0.9.8v1
3(31 Luick nscn Ave