Loading...
HomeMy WebLinkAbout20210948 Ver 1_Buffer Determination_20210608ROY COOPER Governor JOHN NICHOLSON Interim Secretary S. DANIEL SMITH Director Karl Brown Manning and Pamela J. Manning 3731 Dickinson Avenue Greenville, North Carolina 27834 NORTH CAROLINA Environmental Quality June 8, 2021 2021-0948 vl (Express) Pitt County Subject: On -Site Determination for Applicability to Tar -Pamlico Riparian Buffer Rules (15A NCAC 02B .0734) (EXPRESS Program) Subject Property/ Project Name: The Dickinson Address/Location: 3731 Dickinson Avenue, Greenville NC (Pitt County Parcel #14234) Stream(s) Evaluated: (1) — UTs to Greens Mill Run, Class C, NSW; Stream Index 28-96; Tar -Pamlico River Basin Determination Date: May 28, 2021 Staff: Chris Pullinger Determination Type: Buffer: Stream: • Neuse (15A NCAC 02B .0714) ■ Intermittent/Perennial Determination // Tar -Pamlico (15A NCAC 02B .0734) • Catawba (15A NCAC 02B .0614) • Jordan (15A NCAC 02B .0267) (governmental and/or interjurisdictional projects) • Randleman (15A NCAC 02B .0724) • Goose Creek (15A NCAC 02B .0605-.0608) Stream E/I/P* Not Subject Subject Start@ Stop@ Soil Survey USGS Topo 2021-0948 v1 A E X 2021-0948 v1 A Start 2021-0948 v1 A Origin X 2021-0482 v1 A I X 2021-0948 v1 A Origin 2021-0948 v1 A Finish X *E/I/P = Ephemeral/Intermittent/Perennial The Division of Water Resources has determined that the streams listed in the table above and included on the attached map have been located on page 40 of the most recent published (1974) NRCS Soil Survey of Pitt County, North Carolina and/or the most recent copy of the USGS National Map (https://apps.nationalmap.gov/viewer) and evaluated for applicability to the Tar -Pamlico Riparian Buffer Rules. Each feature that is checked "Not Subject" and highlighted on the attached maps in "red" has been determined to be either man-made in nature, ephemeral, or not present on the property. Features that are checked "Subject" and highlighted on the attached maps in "blue" have been located on the property and possess characteristics that qualify them to be at least natural intermittent streams. There may be other streams or features located on the property that do not appear on the maps referenced above but may be considered waters of the State and jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding as detailed above unless an appeal is requested within sixty (60) days. £ D_E NORTH CAROLINA Department of Environmental fluali� North Carolina Department of Environmental Quality 1 Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 252.946.6481 This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers or waters. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910)-251-4629. If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918. cc: Sincerely, Raire4T J 4 Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Pamela J. Manning (via e-mail: Pmanning0114@gmail.com) Igor Palyvoda, Baldwin Design Consultants, PA (via e-mail: ialyvoda@baldwindesignconsultants.com) Emily Thompson, USACE Washington Field Regulatory Office (via e-mail) Randall Jones, WaRO DEMLR (via e-mail) Lyn Hardison, One Stop Permitting — WaRO (via e-mail) WaRO DWR File Copy/LASERFICHE 71r% North Carolina Environmental Management Commission Division d Wader Resources ��, Tar -Pamlico Basin Buffer Date June 8 Z n Reviewed by DWR Project .#2021-0.9.8v1 3(31 Luick nscn Ave