Loading...
HomeMy WebLinkAboutNC0056154_Authorization to Construct_20210707 AT-o'. S - , Ta. ROY COOPER it "+ u Governor *fit Pi ELIZABETH S.BISER Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality July 7, 2021 Michael A. Melton, Engineering Manager Aqua North America, Inc 4163 Sinclair Street Denver,North Carolina 28037 SUBJECT: Authorization to Construct A to C No. 056154A02 Aqua North America, Inc. Bridgeport WWTP NPDES Permit No.NC0056154 Dear Mr.Melton: A letter of request for an Authorization to Construct was received February 26, 2021, by the Division of Water Resources (Division). With additional information received on July 6, 2021 final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing Bridgeport WWTP, with discharge of treated wastewater into the Catawba River in the Catawba Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of one (1) 1.25 MGD bar screen, one (1) 1.25 MGD bypass manual bar screen; construction of a new dual train package plant which includes one (1)26,600-gallon flow equalization basin with two (2) 195 GPM submersible pumps, two (2) 40,000-gallon rectangular aeration basins, one (1) 144 square feet rectangular clarifier with 12 feet of side water depth, one (1) 21,788-gallon sludge digestor with air lift pumps for RAS/WAS and scum lines, and a new concrete blower pad; installation of two (2) 81 SCFM positive displacement blowers for the aerobic digestor, and one (1) 71 SCFM positive displacement blower for the flow equalization basin; replacement of the two (2) existing effluent pumps with two (2) 195 gpm submersible pumps; conversion of the one (1) existing equalization basin blower and one (1) existing post aeration blower to airlift blowers; decommissioning and demolishing of the existing 0.08 MGD steel package plant; installation of an electrical and SCADA control system, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. #) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617 N4 , ��D E °ciu^�rc��m Enmm^nrenmiquzuq 919.707.9000 Mr.Michael Melton,Engineering Manager July 7,2021 Page 2 of 3 This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0056154 issued effective August 8, 2020, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No.NC0056154. It is the Owner's responsibility to ensure that the as-constructed project meets the requirements of all applicable regulations and statutes,the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Mooresville Regional Office, telephone number 704-663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh,NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. D_E North Carolina Department of Environmental Quality I Division of Water Resources -;) 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAROLINA Warbled of Environmental Walt jell 919.707.9000 Mr.Michael Melton,Engineering Manager July 7,2021 Page 3 of 3 A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction,the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed -by other government agencies(local, state, and federal)which have jurisdiction. If you have any questions or need additional information, please contact Julia Byrd at telephone number(919) 707-3707. Sincerely, EDocuSigned by: t Liu A.:1.e. B0B410C9F6204F7... for S.Daniel Smith Director, Division of Water Resources • by Min Xiao,PE NPDES Industrial Permitting Unit With Engineer's Certificate attached: cc: NPDES Files - ecopy: David F. Schrader, PE Howard K. Bell Consulting Engineers, Inc. Email: dschrader@hkbell.com DWR Mooresville Regional Office, Water Quality Programs Without Engineer's Certificate attached: cc: Iredell County Health EQ^q, North Carolina Department of Environmental Quality I Division of Water Resources -;) 512 North Salisbury Street 11617 Mall Service Center I Raleigh,North Carolina 27699-1617 NORM CAROUNA Department DIlf /"� 919.707.9000 Aqua North America,Inc Bridgeport WWTP Authorization to Construct No. 056154A02 Issued July 7, 2021 NPDES Permit No.NC0056154 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Bridgeport Wastewater Treatment Plant, located in Iredell County, hereby state that,to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of one(1) 1.25 MGD bar screen, one(1) 1.25 MGD bypass manual bar screen; construction of a new dual train package plant which includes one (1) 26,600-gallon flow equalization basin with two (2) 195 GPM submersible pumps,two(2)40,000-gallon rectangular aeration basins, one(1) 144 square feet rectangular clarifier with 12 feet of side water depth, one (1) 21,788-gallon sludge digestor with air lift pumps for RAS/WAS and scum lines, and a new concrete blower pad; installation of two(2) 81 SCFM positive displacement blowers for the aerobic digestor, and one (1) 71 SCFM positive displacement blower for the flow equalization basin;replacement of the two (2) existing effluent pumps with two (2) 195 gpm submersible pumps; conversion of the one(1) existing equalization basin blower and one(1) existing post aeration blower to airlift blowers; decommissioning and demolishing of the existing 0.08 MGD steel package plant; installation of an electrical and SCADA control system, and all necessary piping and controls; in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Min Xiao,PE SEAL NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh,NC 27699-1617