Loading...
HomeMy WebLinkAboutNCC190692_NOT Closeout Documents (2)_20210706614.97 OVERFLOW WEIR =•6?�TS• 36" X 6" ORIFICE INV ELEV=4*6111= �' e 614.42-e�`- 18" X 4" ORIFICE INV. ELEV. = 13 +. 4 .y BSI .- 104 7" X 1" ORIFICE ° < INV. ELEV=4""13.08 ,�' + •� 8" EMERGENCY DRAIN CC7 4, • 4. 9 . a 4 .10 .4 A 7'X7'X2' CONCRETE ANCHOR FOOTING- 7'-0 „ (3600 PSI) WITH 10X10X6/6 WWM RISER DETAIL NOT TO SCALE 616.20 TOP OF BERM ELEV = 946"59 T 614.88 IFSEEBOARD =-6046-11.32' 50 YR 6-HR SURFACE ELEVATION = 11+9%0 6 �- 25 YR 6-HR SURFACE ELEVATION = 64r4+F 614.55 10 YR 6-HR SURFACE ELEVATION 0; ; A 614.08 �NAIILIEL PROTE=N Vol UME = 6'I'•h "jb 613.25 WAIER QU_ALITY__EI.EVAn0N-= Wm*� _611.98 24" RCP OUTLET W/ O-RINGS JOINTS AND ANTI -SEEP COLLARS. INV=466400607.60 EMBANKMENT CONSTRUCTION THE FOLLOWING STEPS APPLY TO CONSTRUCTION OF AN EMBANKMENT: STEP 1: SUBGRADE PREPARATION: • COMPACT SUBGRADE TO DENSITY REQUIREMENTS FOR SUBSEQUENT FILL MATERIALS. • CUT OUT SOFT AREAS OF SUBGRADE NOT CAPABLE OF COMPACTION IN PLACE. • SCARIFY SUBGRADE SURFACE TO DEPTH OF 6 INCHES. • PROOF ROLL SUBGRADE TO IDENTIFY SOFT SPOTS; FILL AND COMPACT TO DENSITY EQUAL TO OR GREATER THAN REQUIREMENTS FOR SUBSEQUENT FILL MATERIAL. STEP 2: SEEPAGE KEY PLACEMENT • SEEPAGE KEY TRENCH WILL BE LOCATED BETWEEN EMBANKMENT ABUTMENTS. • SEEPAGE KEY SHALL EXTEND TO A MINIMUM DEPTH OF 4 FEET OR AS REQUIRED THROUGH GEOTECHNICAL SEEPAGE ANALYSIS. A MINIMUM BOTTOM TRENCH WIDTH SHALL BE 10 FEET AND THE TRENCH SIDEWALLS SHALL BE SLOPED OR BENCHED TO PROMOTE STABILITY AND BONDING BETWEEN THE SIDEWALL SOILS AND SEEPAGE KEY FILL. STEP 3: EMBANKMENT FILL PLACEMENT • EMBANKMENT FILL SHALL BE CONSTRUCTED AT 3(HORIZONTAL):1(VERTICAL) OR AS SHOWN ON THE DRAWINGS. DEMONSTRATION OF APPROPRIATE SAFETY FACTORS AGAINST FAILURE THROUGH GEOTECHNICAL ANALYSIS SHALL BE REQUIRED FOR SLOPES STEEPER THAN 3(HORIZONTAL):1(VERTICAL). • FILL SOILS SHALL BE PLACED IN LOOSE LIFTS NOT TO EXCEED 8 INCHES IN THICKNESS AND BE COMPACTED TO A MINIMUM OF 95 PERCENT OF THE SOILS STANDARD PROCTOR (ASTM D698) MAXIMUM DRY DENSITY, OR AS SPECIFIED ON THE DRAWINGS. • COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY GEOTECHNICAL CONSULTANT. • FILL SOILS SHOULD BE PLACED IN CONTINUOUS, HORIZONTAL LAYERS FROM ABUTMENT TO ABUTMENT. EXISTING SLOPES GREATER THAN 4(HORIZONTAL):1(VERTICAL) SHALL BE BENCHED TO PROMOTE BONDING OF NEWLY PLACED FILL WITH EXISTING SOILS. BENCHING SHALL BE PERFORMED AT MAXIMUM OF 2 FEET VERTICAL INTERVALS AND SHALL EXTEND A MINIMUM OF 4 FEET HORIZONTALLY OR AS SPECIFIED ON DRAWINGS. • WITHIN THE UPPER 12 INCHES OF EMBANKMENT, FILL SOILS SHOULD BE COMPACTED TO 100% OF ITS STANDARD PROCTOR (ASTM D698) MAXIMUM DRY DENSITY. • FILL AGAINST SUPPORTED STRUCTURES. DO NOT FILL AGAINST UNSUPPORTED STRUCTURES. • PLACE FILL SIMULTANEOUSLY ON EACH SIDE OF UNSUPPORTED STRUCTURES UNTIL SUPPORTS ARE IN PLACE. • PLACE A MINIMUM OF SIX INCHES OF TOPSOIL ACROSS DAM EMBANKMENT TO PROMOTE VEGETATIVE GROWTH. STEP 4: OUTLET PIPE FILL PLACEMENT • FILL OF THE CULVERTS SHALL BE PLACED AND COMPACTED IN 6-INCH THICK LOOSE LIFTS AROUND THE DROP INLETS AND UP TO 2 FEET ABOVE THE CULVERTS. • COMPACTION SHALL BE PERFORMED BY HAND TAMPERS OR SMALL HAND OPERATED COMPACTORS. • COMPACTION SHALL BE AT A MINIMUM 95 PERCENT OF THE STANDARD PROCTOR (ASTM D698) MAXIMUM DRY DENSITY. COMPACTED MOISTURE CONTENT SHALL BE BETWEEN 3 PERCENT BELOW AND 3 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT FOR ALL FILL PLACED, OR AS OTHERWISE APPROVED BY GEOTECHNICAL CONSTULTANT. • ADDITIONAL COMPACTION OF LIFTS 2 FEET OR GREATER ABOVE CULVERTS SHALL CONFORM TO THE EMBANKMENT FILL PLACEMENT SECTION OF THIS SPECIFICATION. STEP 5: FIELD QUALITY CONTROL LABORATORY TESTING • PERFORM LABORATORY MATERIAL TESTS IN ACCORDANCE WITH ASTM D422, ASTM D698, ASTM D2216, AND ASTM D4318. • TEST AT A FREQUENCY OF EVERY 500 CUBIC YARDS OF EMBANKMENT FILL MATERIAL PLACED, WHEN MATERIALS USING FOR EMBANKMENT FILL CHANGE, AND/OR AS DIRECTED BY THE GEOTECHNICAL CONSULTANT. • SAMPLE SIZE SHALL BE 50-LB. IN PLACE COMPACTION AND NATURAL MOISTURE CONTENT TESTS • PERFORM IN PLACE COMPACTION TESTS IN ACCORDANCE WITH ASTM D1556, ASTM D2922, OR ASTM D2937 AND NATURAL MOISTURE CONTENT TEST IN ACCORDANCE WITH ASTM D2216. • FREQUENCY OF COMPACTION/NATURAL MOISTURE CONTENT TESTS: • EMBANKMENT FILL: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 2,500 SQ. FT. • PIPE INSTALLATION: EACH LIFT AT A MINIMUM FREQUENCY OF 1 PER 30 LF OF PIPE. • WHEN TESTS INDICATE WORK DOES NOT MEET SPECIFIED REQUIREMENTS, REMOVE WORK, REPLACE AND RETEST. ALLOWABLE VARIANCES EMBANKMENT SPECIFICATIONS MAY BE MODIFIED BASED ON SITE -SPECIFIC GEOTECHNICAL INVESTIGATION AT THE DISCRETION OF THE GEOTECHNICAL CONSTULTANT. 91 1.0' TRENCH WIDTH 1.0' 1.5'• 1.5' a 'm i.0, m a 1.5' o 4 m 1.5' =III=III=III=III=III=III :■o1*"l, TRENCH WIDTH RECORD DRAWING THIS RECORD DRAWING HAS BEEN PREPARED IN PART, BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THE INFORMATION IS BELIEVED TO BE RELIABLE, DESIGN RESOURCE GROUP ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THE RECORD DRAWING OR FOR ANY ERRORS OR OMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN DESIGN INDEPENDENT VERIFICATION OF ITS ACCURACY. RESOURCE THE ASBUILT STORM WATER MEASURES, CONTROLS, AND DEVICES ARE IN COMPLIANCE GROUP WITH THE APPROVED STORM WATER MANAGEMENT PLANS AND DESIGNS AND WITH THE REQUIREMENTS OF THE POST -CONSTRUCTION CONTROLS ORDINANCE. APPROVALS SEALS I*=t(Z AR Q� fQ to 034267 _- awI" NCPE (AS BUILT) NCRCS�,4 ?; r� B, ILT) BMP EMBANKMENT REQUIREMENTS PER CITY OF CHARLOTTE BMP DESIGN MANUAL CONSTRUCTION OF BMP'S AND THE PLACEMENT OF ALL EMBANKMENTS SHALL BE IN ACCORDANCE WITH THE N.C. DAM SAFETY ACT OF 1967 AND ANY SUBESQUENT CHANGES THERETO, STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, AND/OR THE STANDARDS AND SPECIFICATIONS OF THE APPROVING AGENCY. THESE SPECIFICATIONS APPLY TO ALL BMPS WITH EMBANKMENTS THAT ARE DESIGNED TO HOLD WATER, EVEN IF THE EMBANKMENT IS DESIGNED TO HOLD WATER ONLY DURING A STORM EVENT. DESIGN RESOURCE GROUP IS NOT RESPONSIBLE FOR THE DESIGN AND CERTIFICATION OF GEOTECHNICAL INSTALLATIONS AND OFFERS THE FOLLOWING SPECIFICATIONS FOR REFERENCE ONLY. VERIFICATION OF SITE CONDITIONS AND FINAL GEOTECHNICAL RECOMMENDATIONS SHALL BE THE RESPONSIBILITY OF THE GEOTECHNICAL CONSULTANT. CONSTRUCTION OF ALL PROPOSED BMP'S SHALL BE PERFORMED UNDER THE OBSERVATION OF A GEOTECHNICAL CONSTULTANT WORKING UNDER THE DIRECTION OF AN NC LICENSED ENGINEER. EMBANKMENT FILL MATERIALS THE FOLLOWING PARAMETERS APPLY TO MATERIALS USED TO CONSTRUCT EMBANKMENTS: BORROW MATERIAL SHALL BE CLASSIFIED AS ML, MH, SC, SM, CL OR CH SOILS ACCORDING TO THE UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D2487) OR ANY MIXTURE OF THESE SOILS. BORROW MATERIALS SHALL HAVE A LIQUID LIMIT (LL) BETWEEN 40 AND 60 AND A PLASTICITY INDEX (PI) BETWEEN 15 AND 30 (ASTM D4318). MATERIALS SHALL BE FREE OF TOPSOIL, ORGANIC MATERIAL, ROOTS, STUMPS, BRUSH, ROCKS LARGER THAN 3 INCHES, SUBSOIL, DEBRIS, VEGETATION, AND OTHER FOREIGN MATTER. ALL MATERIAL CLODS WILL BE BROKEN DOWN WITH TILLERS AND/OR DISCS TO PROVIDE A HOMOGENEOUS SOIL THAT IS FREE OF CLAY CLODS GREATER THAN 3 INCHES IN DIAMETER. REFERENCES • "CHARLOTTE-MECKLENBURG BMP DESIGN MANUAL". CHARLOTTE- M EC KLEN BURG STORM WATER SERVICES, CITY OF CHARLOTTE, NORTH CAROLINA, JULY 1, 2013 • ASTM D422 - STANDARD TEST METHOD FOR PARTICLE -SIZE ANALYSIS OF SOILS (GRAIN SIZE WITH HYDROMETER). • ASTM D698 - STANDARD TEST METHODS FOR LABORATORY COMPACTION CHARACTERISTICS OF SOIL USING STANDARD EFFORT (12,400 FT-LBF/FT3). • ASTM D1 556 - STANDARD TEST METHOD FOR DENSITY OF SOIL IN PLACE BY THE SAND -CONE METHOD. • ASTM D2216 STANDARD TEST METHOD FOR LABORATORY DETERMINATION OF WATER (MOISTURE) CONTENT OF SOIL AND ROCK BY MASS. • ASTM D2922 - STANDARD TEST METHOD FOR DENSITY OF SOIL AND SOIL -AGGREGATE IN PLACE BY NUCLEAR METHODS (SHALLOW DEPTH). • ASTM D2487 - STANDARD PRACTICES FOR CLASSIFICATION OF SOIL FOR ENGINEERING PURPOSES (UNIFIED SOIL CLASSIFICATION SYSTEM) • ASTM D2937 - STANDARD TEST METHOD FOR DENSITY OF SOIL IN PLACE BY THE DRIVE -CYLINDER METHOD TEST. • ASTM D4318 - STANDARD TEST METHODS FOR LIQUID LIMIT, PLASTIC LIMIT, AND PLASTICITY INDEX OF SOILS. B CONCRETE 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EA / / PROP. PCCE � -616.44_ -1-6x616.40 6, I o , s.28 _ -- -- I / - - -16 '<, T-. .61 1­71�' 1 00\ 617. 3 \ II I F61 CLEANOUT ' CL'EANOUT INV: 607.73 o0 a / INV:- @0801 5 TED UNDERDRAIN 6'' PER I / . \ . 607.65 D D \ 1 00 \ I \ 0.5% SLOPE (TYP.) i % I CLEANOUT / . D I. x 17.4,' INV: @01140 fi 607.71 24" RCP PCCO Sand Filter Stage/Storage Elevation Pond Surface Area (ft) Forebay Surface Area (ft2) 611.50 1897 612 4989- 17605 - 683 613 408600 18897 4466.1184 614 4W"iiF6 20037 -9436. 1652 615 49P9Q 23296 486& 616 44@60 24702 - 4*6.6.61 .20 469Q 25157 - NOTE: DRAINAGE AREA MUST BE STABLIZED \BEFORE FILTRATION CONTROLS AND FILTER MEDIA ARE INSTALLED. 1� 3 LOCKABLE MAINTENANCE DRAIN CLEANOUT TOP OF SAND FILTER 608.00 = 0*@P" 611.50 ' D D IN V: 699,�6 \ I 611.80 612.00 ' 612.20 . D •�611.60 \ . 1897 PROP. !496E1• SF p ' SAND FILTER. 61 .75 PqI I CLEANOUT 608.19 \ D 617\. 5 INV: 6¢6e3b \ p • CLEANOUT . 607.87 \ . \ CLEANOUT ` INV: 699�39. o \ INV: 66s 7. 6 76 CLEANOUT 607.88 \ INV: ' 695!�6 D o \ \ 01-FES �. • °� 616.52 \ - D D . 14. ' - 15 16 x616 63 16 off" \ ` -616. 0 x616.51 616.52 K616.6 0 City of Charlotte Engineering Department Phase Map Storm Drainage<EEtention Water Qua I As -built approved as noted By: E. Chien Date: 1/25/2021 101-OS ..'.,:. FILTER FABRIC 4" ORIFICE FOR a.ra SKIMMER COUPLER 4•.: 6" LAYER OF 3" , • < .:. WASHED RIVER 8" DIP EMERGENCY '• ® .:. "' 1 ROCK nRAw . TOP OF FILTER MEDIA, FILTER FABRIC LAYER ELEVATION 611.50 SURFACE AREA = 04""-SF 1897 BOTTOM OF FILTER MEDIA, FILTER FABRIC LAYER - ELEVATION = 609.00 12" LAYER OF #57 WASHED STONE " 6" PERFORATED UNDERDRAIN 0.5% SLOPE SURFACE SAND FILTER SECTION NOT TO SCALE 50 YR 6-HR SURFACE ELEVATION = 645-#6 614.88 25 YR 6-HR SURFACE ELEVATION = 9411§. 614.55 10 YR 6-HR SURFACE ELEVATION = 0*4!@! 614.08 2' (MIN) 1 CHANNEL PROTECTION VOLUME ELEVATION = 64rF4.1� 613.25 3 WATER QUALITY SURFACE ELEVATION = 6#r.60 611.98 BOTTOM OF FOREBAY ELEV 612.00 FOREBAY BERM HEIGHT = 2.0' WITH 6" #57 WASHED STONE TOP OF BERM ELEV = 6#r.99 613.80 2 1 I- SLOPE BOTTOM O 1.0% TO SAND FILTER 5'-0" 4'-0" AA RFRAR 1.0' (TYP) Lo ■■IIIIII■'IIIII■�Illll■'lllll■Llllll■I■■ • JED HINGES CESS HATCH x2"x4" ANGLE PORTION DENOTES ACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR #4 TRASH RACK ANCHOR TRASH RACK TO STRUCTURE WALL WITH FOUR EQUALLY SPACED HOT -DIPPED GALVANIZED STEEL CLAMPS. EACH CLAMP ATTACHED TO STRUCTURE BY 2-4"xi" EPDXY COATED CONCRETE ANCHOR BOLTS NOTES: 1. ALL REBAR TO BE #4 REBAR 2. ALL REBAR AND ANGLES TO BE GALVANIZED AND BE PROVIDED WITH EPDXY COATING 3. HOT -DIPPED, GALVANIZED 2%2" }" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE STRUCTURE WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. TRASH RACK DETAIL NOT TO SCALE 10' OUTLET RISER ELEV.- 616.20 PER DETAIL 2.5" SKIMMER COUPLER ORIFICE 8" DIP EMERGENCY DRAIN TOP OF SAND FILTER ELEVATION = &*@a" 611.50 ::��s �1 1� 3 3 31.25' 62.50' 31.25' 4' MIN.* CROSS SECTION NOT TO SCALE 4 ' ' *FINAL DIMENSIONS OF SEEPAGE GEOTECHNICAL ENGINEER BASED KEY SHALL BE VERIFIED BY ON SOIL CONDITIONS. (SEE STEP 2: 24 RCP OUTLET PIPE INV. = 699*0 607.60 W/ ANTI -SEEP COLLARS 5' MIN.* SEEPAGE KEY PLACEMENT) AND WATER TIGHT JOINTS DESIGN RESOURCE G R 0 U P LANDSCAPE ARCHITECTURE CIVIL ENGINEERING TRANSPORTATION PLANNING 2459 Wilkinson Blvd, Ste 200 Charlotte, NC 28208 704.343.0608 www.drgrp.com °�.�\A UARO� * CORPORATE SEAL _ - v C-95 C-2165 NCBELS •' a` ., •. ��. FS�U R C E IG�``,�� Rm nrml Z WW N O re Z CN � _J LLIzWo Q W zvto �_,``' M U) OpCCo Z -nj p O r V ~ Z Q O SCM DETAILS C4.13 © 2019 Design Resource Group, PA This plan or drawing and any accompanying documents or calculations are the property of Design Resource Group, PA; and are intended solely for the use of the recipient noted. No third party use or modification is permitted without