HomeMy WebLinkAboutNCC205949_NOT Closeout Documents_20210706North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Duplin Project: AT&T Mount Olive A0WK11
Person financially responsible: Bellsouth Telecommunications, LLC - Michael B
Wiggin, Director C. E.
Address: 10610 Metromont Pkwy, Ste 206, Charlotte, NC 28269
1. Project Location: Johnson St, E College, S NC 11, Mounty
Pictures: No Olive
2. Weather and soil conditions: 90 clear dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Cape Fear
Project #: DUPLI-2021-004
Initial inspection: Yes
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: June 29, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Brian Lambe Others present:
Date of inspection: June 28, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:45 PM
cc:
Yes
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Duplin Project: AT&T Mount Olive A0WK11
Person financially responsible: Bellsouth Telecommunications, LLC - Michael
Wiggin, Director AT&T NC
Address: 100 S. Eugene St #212, Greensboro, NC 27401
1. Project Location: Johnson St, E College, S NC 11, Mounty
Pictures: No Olive
2. Weather and soil conditions: 90 clear dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Cape Fear
Project #: DUPLI-2021-004
Initial inspection: Yes
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: June 29, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Brian Lambe Others present:
Date of inspection: June 28, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:45 PM