Loading...
HomeMy WebLinkAboutNCC213755_Site Plan or Location Map (2)_20210707NPDES GENERAL PERMIT SCR 100000 1. THE INTENT OF THIS PERMIT IS TO COVER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY THAT WILL RESULT IN LAND DISTURBANCE EQUAL TO OR GREATER THAN ONE (1) ACRE OR FROM CONSTRUCTION ACTIVITIES INVOLVING LESS THAN ONE (1) ACRE AND WHICH ARE A PART OF A COMMON PLAN OF DEVELOPMENT OR SALE EQUAL TO OR GREATER THAN ONE (1) ACRE. 2. YOU MUST IMPLEMENT THE EROSION AND SEDIMENT CONTROL PLAN APPROVED FOR YOUR PROJECT BY THE DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OR BY AN APPROVED LOCAL PROGRAM. 3. WHENEVER LAND DISTURBING ACTIVITY THAT WILL DISTURB MORE THAN ONE ACRE IS UNDERTAKEN ON A TRACT, THE PERSON CONDUCTING THE LAND DISTURBING ACTIVITY SHALL INSTALL EROSION AND SEDIMENT CONTROL DEVICES AND PRACTICES THAT ARE SUFFICIENT TO RETAIN THE SEDIMENT GENERATED BY THE LAND DISTURBING ACTIVITY WITHIN THE BOUNDARY OF THE TRACT DURING CONSTRUCTION UPON AND DEVELOPMENT OF THE TRACT, AND SHALL PLANT OR OTHERWISE PROVIDE PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION AFTER COMPLETION OF CONSTRUCTION OR DEVELOPMENT WITHIN A TIME PERIOD TO BE SPECIFIED BY RULE OF THE COMMISSION. 4. YOU MUST KEEP RAIN GAUGE ON SITE. 5. YOU MUST INSPECT ALL EROSION AND SEDIMENT CONTROL MEASURES AT LEAST ONCE A WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN HALF AN INCH (DURING 24 HOUR PERIOD). YOU MUST TAKE IMMEDIATE CORRECTIVE ACTION FOR ANY DEVICE FAILURE. 6. YOU MUST INSPECT ALL OUTLETS WHERE STORMWATER RUNOFF LEAVES YOUR SITE AND EVALUATE THE EFFECT ON NEARBY STREAMS OR WETLANDS. CORRECTIVE ACTION MUST BE TAKEN IF SEDIMENT IS DEPOSITED OFF SITE OR INTO A STREAM OR WETLAND, OR CAUSES A VISIBLE INCREASE IN TURBIDITY OF ANY WATERBODY. 7. NO PAINT OR LIQUID WASTES IN STREAMS OR STORM DRAINS. DEDICATED AREA FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVE IS AVAILABLE. EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNVATIVE IS AVAILABLE. CONCRETE MATERIAL MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 8. YOU MUST KEEP RECORDS OF ALL INSPECTIONS AND ANY CORRECTIVE ACTIONS TAKEN. STANDARD NOTES 1. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL REMOVE MUD/SOIL FROM PAVEMENT AS OFTEN AS REQUIRED. 2. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS. 3. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 4. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL STABILIZATION IS REACHED. 5. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 6. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 7. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 8. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: • WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; • WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; • FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND • SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 9. A PRE -CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON -SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON -LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON -SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE. 10. CONTRACTOR TO CLEAR EXISTING CULVERTS/PIPES, CATCH BASINS, AND DITCHES ALONG FRONTAGE AND DOWNSTREAM AS NECESSARY TO ACHIEVE POSITIVE DRAINAGE. 11. NO WORK TO BEGIN IN COUNTY RIGHT OF WAY UNTIL SPARTANBURG COUNTY ENCROACHMENT PERMIT RECEIVED. EROSION CONTROL NOTES 1. ALL LAND DISTURBING ACTIVITIES SHALL BE CONDUCTED IN ACCORDANCE WITH NORTH CARLOLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) STANDARDS. 2. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE MAINTAINED IN PROPER WORKING CONDITION DURING THE PERIOD OF CONSTRUCTION. 3. ADDITIONAL EROSION CONTROL MEASURES AND/OR MODIFICATIONS TO PROPOSED MEASURES MAY BE NECESSARY DEPENDING ON ACTUAL SITE CONDITIONS. 4. THE TOTAL PROJECT AREA IS 883.71 ACRES. 5. PLAN SHOULD INCLUDE PROVISIONS FOR GROUNDCOVER IN ACCORDANCE WITH NPDES CONSTRUCTION STORMWATER GENERAL PERMIT VAR10 AND PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 6. THE PURPOSE OF THIS GENERAL PERMIT IS TO MANDATE GROUND STABILIZATION IN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1 AND 14 DAYS ON OTHER AREAS. ALL EROSION CONTROL MEASURES SHOULD BE INSPECTED WEEKLY OR WHEN THERE IS A RAINFALL EVENT GREATER THAN 0.5 INCHES. 7. SEE DETAIL SHEETS FOR EROSION CONTROL MEASURE DETAILS. 8. TEMPORARY SEEDING IS REQUIRED WITHIN 14 DAYS AFTER CONSTRUCTION ACTIVITY IS COMPLETE. COVER WITH APPROPRIATE MULCH TO PROTECT FROM WEATHER. 9. ALL NEWLY GRADED SIDE SLOPES OF 3:1 OR STEEPER TO BE MATTED WITH NORTH AMERICAN GREEN S75BN OR EQUIVALENT. 10. CONTRACTOR TO CLEAR EXISTING CULVERTS/PIPES, CATCH BASINS, AND DITCHES ALONG FRONTAGE AND DOWNSTREAM AS NECESSARY TO ACHIEVE POSITIVE DRAINAGE. EROSION CONTROL SELF INSPECTION 1. THE PURPOSE OF SELF INSPECTION IS TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED, INCLUDING THE INSTALLATION AND MAINTENANCE OF MEASURES, AND THE PROVISION OF GROUND COVER IN A TIMELY MANNER. 2. ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED. 3. A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1" MUST BE COMPLETED. AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. 4. THE SELF -INSPECTION REPORT FOR LAND -DISTURBING ACTIVITY IS TO BE COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS COMPLETE. THESE PHASES MAY INCLUDE: INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; CLEARING AND GRUBBING OF EXISTING GROUND COVER; COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS; INSTALLATION OF STORM DRAINAGE FACILITIES; COMPLETION OF CONSTRUCTION OR DEVELOPMENT; ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 5. THE RECORDS MUST BE MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT THE SITE. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE. EXISTING CONDITION NOTES 1. "PHOBOS SOLAR, LLC" PRELIMINARY ALTA/NSPS LAND TITLE SURVEY PROVIDED BY MCKIM & CREED, RECEIVED ON FEBRUARY 7, 2021. 2. PROPERTY OWNER: FRANKLIN C. ANDERSON PARCEL #: 3-10 3. SITE ADDRESS: PROPHECY ROAD, NASH COUNTY, NC DEMOLITION KEYNOTES 1. REMOVE EXISTING ITEMS, AS NOTED ON DEMOLITION PLAN, COORDINATE REMOVAL AND REPLACEMENT WITH APPLICABLE FEDERAL, STATE, COUNTY, CITY, OR LOCAL AGENCIES; OR THE LOCAL UTILITY COMPANY/LANDOWNER. SITE PLAN NOTES 1. SOLAR ARRAY LAYOUT PROVIDED BY PINE GATE RENEWABLES, DATED MARCH 18, 2021. SUMMARY INFORMATION 2. ALL MARKINGS WITHIN NCDOT ROW SHALL BE THERMOPLASTIC (OR EPDXY IF CONCRETE) OR APPROVED PERMANENT EQUIVALENT. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR UTILIZING ALL APPLICABLE AND CURRENT VDOT STANDARD DRAWINGS INCLUDING, BUT NOT LIMITED TO, THE DRAWINGS INCLUDED WITHIN THESE PLANS AND THE APPROVED PERMIT PACKAGE. 4. PROPOSED TREE CLEARING WILL RESULT IN REMOVAL OF SOIL AROUND ROOT BALLS. CONTRACTOR SHALL BE RESPONSIBLE FOR FILLING AND COMPACTING ROOT AREA TO PREVENT LOCALIZED PONDING. 5. LANE CLOSURES ARE REQUIRED FOR ALL WORK WITHIN ONE FOOT OF THE TRAVEL WAY. REFER TO FIGURE TTC-23.2 FROM VDOT'S VIRGINIA WORK AREA PROTECTION MANUAL SHOWN ON SHEET 402 FOR MORE DETAIL. 6. THE DEVELOPER, OR HIS AUTHORIZED REPRESENTATIVE, WILL BE RESPONSIBLE TO ENSURE THAT ANY AND ALL UTILITIES ARE RELOCATED AS NECESSARY. 7. THE NCDOT RESERVES THE RIGHT TO REQUIRE FIELD CHANGES WITHIN STATE MAINTAINED RIGHTS OF WAY AS DEEMED NECESSARY. LINE OF SIGHT NOTES DEVELOPMENT NAME: PHOBOS SOLAR, LLC STREET ADDRESS: PROPHECY ROAD, NASH COUNTY, NC PARCEL NUMBER: LIMIT OF DISTURBANCE: PARCEL ACREAGE: 883.71 ACRES EXISTING USE: AGRICULTURAL PROPOSED USE: POWER GENERATION FACILITY CONTRACTOR: PINE GATE RENEWABLES 130 ROBERTS ROAD ASHEVILLE, NC 28801 (855)-969-3380 ENGINEER: KLEINFELDER INC. 3200 GATEWAY CENTRE BLVD., SUITE 100 MORRISVILLE, NC 27560 919-755-5011 1. PER APPENDIX F OF THE NCDOT ROAD DESIGN MANUAL, THE LINE OF SIGHT ESTABLISHES THE BOUNDARY OF A SIGHT TRIANGLE WITHIN WHICH THERE IS NO SIGHT OBSTRUCTION. 2. AY ANY LOCATION WHERE THE SIGHT LINE LEAVES THE RIGHT-OF-WAY, THE AREA MUST BE GRADED AND LANDSCAPED SUCH THAT SIGHT DISTANCE IS NOT COMPROMISED. ANY EXISTING VEGETATION WITHIN THIS AREA SHALL BE REMOVED. CONSTRUCTION SEQUENCE 1. RECEIVE NORTH CAROLINA POLLUTANT DISCHARGE ELIMINATION SYSTEM (NCPDES) COVERAGE FROM VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). 2. RECEIVE LAND -DISTURBING PERMIT FROM NASH COUNTY EROSION AND SEDIMENT CONTROL PROGRAM. 3. RECEIVE STORMWATER MANAGEMENT PERMIT FROM NASH COUNTY STORMWATER MANAGEMENT PROGRAM. 4. SCHEDULE PRE -CONSTRUCTION MEETING WITH APPLICABLE COUNTY DEPARTMENTS. 5. NOTIFY NCDEQ REGIONAL OFFICE 48 HOURS PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. 6. CALL NORTH CAROLINA 811 SERVICES AT (336) 855-5760 A MINIMUM OF 48 HOURS BEGINNING AT 7:00 A.M. THE NEXT WORKING DAY AFTER YOU CALL 811 PRIOR TO BEGINNING OF CONSTRUCTION. PHASE 1 7. INSTALLATION OF CONSTRUCTION ENTRANCE WITH EROSION CONTROL MEASURES AT PROPHECY ROAD. 8. CLEARING, DISCING, AND GRUBBING ONLY AS NECESSARY FOR INSTALLATION OF PERIMETER SILT FENCE. ALL TREES WITHIN ARRAY AREAS SHALL BE REMOVED UNLESS CALLED OUT TO BE PROTECTED IN PLACE. THERE SHALL BE NO DEMOLITION OUTSIDE OF THE MARKED ARRAY AREAS UNLESS SPECIFICALLY CALLED FOR IN THE PLANS. COORDINATE REMOVAL OF ANY EXISTING ITEMS WITH APPLICABLE FEDERAL, STATE, COUNTY, CITY, LOCAL AGENCIES, UTILITY COMPANIES, OR LAND OWNERS. 9. INSTALLATION OF SILT FENCE AND SILT FENCE ROCK OUTLETS. 10. INSTALLATION OF SEDIMENT BASINS AND ASSOCIATED CONVEYANCE CHANNELS. OUTLET STRUCTURES MUST BE COMPLETELY INSTALLED AS SHOWN ON THE DETAILS BEFORE PROCEEDING TO THE NEXT STEP. AREAS DRAINING TO THESE STRUCTURES CANNOT BE DISTURBED UNTIL THE STRUCTURES AND DIVERSIONS TO THESE STRUCTURES ARE COMPLETELY INSTALLED. PHASE 11 11. ROUGH GRADING FOR INSTALLATION OF ACCESS ROADS, LAYDOWN AREA, AND PERMANENT FENCE. 12. GRADING OF PROPOSED ACCESS ROAD AS SHOWN ON PLANS. SEE ACCESS ROAD CULVERT AND PUMP AROUND DETAILS. 13. FINE GRADING AND INSTALLATION OF SOLAR ARRAY PANELS. CONTRACTOR SHALL GRADE SITE TO DRAIN AND PREVENT PONDING. PHASE III 14. PERMANENT SEEDING AND FINAL STABILIZATION OF TOTAL DISTURBED AREA. 15. REMOVAL OF TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AFTER ENTIRE AREA HAS BEEN PERMANENTLY STABILIZED WITH GROUND COVER VEGETATION. THE RESPONSIBLE LAND DEVELOPER WILL PROVIDE RECOMMENDATIONS WHEN TO REMOVE ALL TEMPORARY EROSION CONTROL DEVICES. CONVERT TEMPORARY SEDIMENT BASINS TO PERMANENT STORMWATER WET PONDS BY CLEANING OUT SEDIMENT, REMOVING SKIMMER, INSTALLING REVERSE SLOPE LOW FLOW PIPE INTO ORIFICE LEFT FROM SKIMMER, INSTALLING TRASH RACK ON RISER, AND ENSURING ALL RISERS COMPLY WITH THE DETAILS SHOWN ON SHEET C-406. ONCE TEMPORARY SETTLEMENT MEASURES ARE REMOVED AND AREAS ARE STABLE, INSTALL PROPOSED LANDSCAPING. 16.INSTALLATION OF PERIMETER LANDSCAPING BUFFER. POST -CONSTRUCTION 17. SUBMIT NOTICE OF TERMINATION (NOT) OF GENERAL NCPDES PERMIT TO NCDEQ. KL E/NFEL DER Bright People. Right Solutions. NC LICENSE # F-1312 3200 Gateway Centre Blvd., Suite 100 Morrisville, NC 27560 Phone: 919-755-5011 www.kleinfelder.com REVISIONS REV I DESCRIPTION A 30% DESIGN ISSUED FOR REVIEW A 90% DESIGN ISSUED FOR PERMITTING DSN CHK DWN APP SMM MIDI SMM CGO SMM SMM FNCT90% DESIGN FOR CONSTRUCTION DATE 4/9/2021 1 SCALE VERIFICATION THIS BAR IS 1 INCH IN LENGTH ON ORIGINAL DRAWING 0 T. IF IT'S NOT 1 INCH ON THIS SHEET ADJUST YOUR SCALES ACCORDINGLY ORIGINAL DRAWING SIZE IS 24 x 36 PHOBOS SOLAR, LLC - 90% DESIGN PROPHECY ROAD NASH COUNTY, NC PINEGATt �iii RENEWABLES PINE GATE RENEWABLES 130 ROBERTS ROAD ASHEVILLE, NC 28801 CONSTRUCTION PLANS PROJECT NO. 20213143.001A SHEET of 22 ISSUE DATE - CURRENT REVISION B DESIGNED BY SMM DRAWN BY SMM CHECKED BY MDI APPROVED BY ---