Loading...
HomeMy WebLinkAboutNCC204237_NOT Closeout Documents_20210630SEDIMENTATION INSPECTION REPORT New Hanover County Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910)-798-7139 Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist Email: bwetherill@nhcgov.com Project Name & Location: 70 West Homes in River Lights- Conventional Phases Grading Permit #: 28-15 and 1, 3, and 4 14-17 Financially Responsible Party & Address: Seventy West Builders, Inc. — PO BOX 1070 Hampstead, NC 28443 Pictures: ❑ Yes ❑X No Weather & Soil Conditions: Sunny, Damp Soil Conditions, 82F Inspection Type: ❑ Initial ❑ Periodic N Final ❑ Complaint Date Report Sent: 6/29/2021 Contact Made With: N/A Inspection report to be sent/given, including financially responsible party: Gayla Babiak — gayla@70westbuilders.com / Ryan Baily — Ryan@70westbuilders.com / Melissa Jensen- melissa@70westbuilders.com Has this project been issued and NOV? ❑ Yes ❑X No Potential NPDES violation? ❑ Yes ❑X No Degree: NPDES Type: Is there offsite sediment? ❑ Yes ❑X No Degree: Location: Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: N N/A Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be in compliance with the Erosion and Sedimentation Control Ordinance: N N/A Part 3: Additional Comments: The following 70 West lots have permanent ground cover sufficient to restrain erosion: • River Lights Lots 251, 252, 359, 415 - GP #14-17 Revision #34 • River Lights Lots 338 - GP #14-17 Revision #38 • River Lights Lots 490, 491 - GP #14-17 Revision #35 • River Lights Lot 14- GP #28-15 Revision #57 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. The New Hanover County Land Disturbance Permit is now closed. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Contact this office with any questions and/or comments about this report and/or project. SEDIMENTATION INSPECTION REPORT Report by: Beth Furr Date of Inspection: 6/24/2021 Others Present: N/A bfurr@nhcgov.com Contact this office with any questions and/or comments about this report and/or project.