Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG080272_DMR_20210630
`1 O Q Q co Q u z O z E w m cc L CJ ACA, rW V Ln a� u O Ln di cc *0 Y .O O m L cu a 4J W C .2 O O u s O z L 49 a � O � 4r ❑ d c'❑ _ ❑ c o 4F I- O � ate. p N O ❑❑❑ oc LLJ C O N9 z g 0 ❑ u 0 0 .- E" LLJ Q r O l►} 0 a a: W, L a a 4 � a Q NS 4 LL 0 LLJ Q u L1. LU u Z 0 uj LL. v G. 7t u -0 iii is c G � O c o u a2 v CL 4 m C O O th Ci � m E H LLJ LL 7 LU LU a CP z Q 0 E z C9 u Ln 0 q7 H LU m LU C LLu ❑ Cr Ln LU r a r. G O E w C. fl 3 a, CL 1�!i u IA a G1 fa D O u 7 � _ � u O 8 n 0 p p_p � tn u0i o U Ln f0 cu Ln C9 O 'a LM Ln L E O Q �( a� O z c O to Qj N 01 C U N to c v O z v N m u m r► o u E CJ ro E IV m z V is IS 7 07 Qca .0 m 4 iY c co 0 E a 4 3 O cr a O — QJ .-E ti H vi : a E w > > y IA : a w is X m ro s u X t Q7 Lt0 4- 0 4-1 L C L CO ro N fYC S L � � V O ❑ C O 07 mM ZWcn jv U L U H (U N 0. Q U _0 X 3 ar a Y ro i M o CLao z s �, W �O Cf +�-' OJ 0 a J E o C p E v L L Q} J E m c bo v CL O X a a O m X ' ra L L o t Y V C m l U p E 3 E 0 ro v E o E ` C Q �. 0 aj N U v t C1 'AC "� Ql m U 'p X In Y U Q7 al ro L j41 N ai � En 00 O Y z Y Z:) SYD y = u E 6 3 a i w -0 tlO Lta E ¢ E c Ln (�] o au— 41 L o ,�„ a ..a_- � O En U U di — w �, " w 0 o ai m m w cn xE 3 3 1 O '7O O .� Qa LL. -0> N @ -0 bQ Y �n is L Q aJ Y C N £ Q > E + L18 4- m C . .-� co M :3 ro -0 m O aA c 0 w +� c a0-0 c E m E is w p d t u c C m E vui di r I' = w +u+ a o m E ro oai w �= E X 3 CJ c tla L a+ c v N Q Y {c w L Ln OO Yc .0 EwCL CL 1 CL CL a � E E E to 0i m c " � +. ° E r' ro 41 M CZ C ';:; O YO C wU cu E � LL n o � w a, 0 0' a cai .a N H Ta a C f0 h c n cc H m a 0 N a i+ !0 N d Q C a C C u cc •e3 c Gi a vi C ea L 4-P 2 m LL a fA aLi m a o2i 0 a� m Ln Ln o E co v4 o O z � O on o Q" o 0 2 N 'a a a ci y` `J #A QD Leff O 0 en . v� r0 E c 8 u I� a L d 1 u \ 1 1 a O E E m 1+= 3 d N O M / N E C S N E 0; cn d a 1 1 o — O z L1 G E 4 4 m z Q 13 W IA a F C w Q. W W N m z 0 5 d a h- ui ui 0. a ui W N 4 z W W cr W N W P W C7 W vdr W H ❑ LLO 2 tn LU u Elu z W 0 } W u X L" w to �G V LL d u_ 0 u Z z0 w W ww 0 m 00 W 0 d d = ui a Q z �0 00 d 2 ev1 L} in ui • • • 6; n. z ~ O Q1 Q C N N z 0oi,�aW y c O O LL0 It ci w 3u at Q XZ 0 Cr N Z R 0 O C7 O O h p O da > c�iv E " a �^ u m E w 3 � ' cc d o M 0 Q. -0 u O m c O w G � � O a a a O. $ a O N 46 T O 'j O N O G a .O m E_ Y —0 a0vi a vi 6 m a 3 � a Q cO E to a.0 c L = O Q /A pi o E 3 m 0 c EIV ,o a E 43 � a C c6 41 O m a 10 0 -O @ N- c a a =E m 41 a E c 0 0 'p OA +O+ ul A L Y a w 0 Jd 0 I- a m c o M- O H O a '6 F+ a u aS a A "0 O' C O m 12 s a a.+ O. a H 0 M Do 0 -a ar N N N 00 0 NN � oao An a An I r O a L L 0 a E t"a � E L N CL Environmental Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-Stormwater-gps Permit No.: 1 or Ce i .ca e o overage No N1C7U 7i-' Facility Name: L County: Inspector: e ` Date of Inspection: Time of Inspection: Total Event Precipitation (inches): S- All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or 1. Outfall Description: Outfall No. I— Structure (pipe, ditch, etc.). Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: C u Page I of 2 SWU-242, last modified O6/01/2018 2. Color: Describe the color glthe.discharge using (light, medium, dark) as descriptors: Ei j ) ►-% (red, brown, blue, etc.) and tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: A S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: a2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? o Yes a No. 8. Is there an oil sheen in the stormwater discharge? ©Yes 01110. 9. Is there evidence of erosion or deposition at the outfall? O Yes No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe /y d1UF Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 06/01/2018 Environmental Qualify Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance onfilling our thisform, please visit hUpsa/deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps _..---Permit NO.:-NIC/ I-1- I 1—I —l._._ /—or Certificate of Coverage No.: Facility Name: 1� Ou �N ," County: Inspector: � : M Date of Inspection: o Time of Inspection: 60 Total Event Precipitation (inches): 3 c •")- �5' Phone No. �q ~ 7 7 Tt All permits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfalI. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR Regional Office. this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or 1. Outfall Description: Outfall No. Structure (pipe, ditch, etc.): Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: Page 1 of 2 SWU-242, Last modified 06/01/2018 2. Color: Describe the color of the-dischatge using basic cPlors (re , brown, blue, etc.) and tint (light, medium, dark) as descriptors: c (7rta.) ^ t _ , tj I,. 3. Odor: Describe any distinct odors that chlorine odor, etc.): 11 may have (i.e., smells strongly of oil, weak 4. Clarity: Choose the numhef which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 'A 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: I 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? O Yes S. Is there an oil sheen in the stormwater discharge? QYes ,u3 No. -6 No. 9. Is there evidence of erosion or deposition at the outfall? O Yes 4$ No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SwU-242, Last modified 06/01/2018