Loading...
HomeMy WebLinkAboutWI0800039_Site Plans/Maps_19980311OU #16 MIWCIN JACKSONVILLE CAMP LEJEUNE MIUTAR RESERVATION MIDWAY PARK (LCH) Kum CCMY! WE, VICINITY MAP wA �. L� ND UNE OU #1 CAMP ` LEJEUNE MILITARY RESERVATION lEGEBp 86 DENOTES R1 SITE 86 (NOT TO SCALE) DENOTES 10 OPERABLE UNIT #20 ..._ (NOT SCALE) DENOTES PRE -RI SITE 68 (NOT TO 5'.':-; FIGURE 2-1 OPERABLE UNIT AND SITE LOCATION MAP OPERABLE UNIT NO. 10 - SITE 35 SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA CHZMHILL MW-337A/B MW-29A/B MW-38A/B • 35-IS 35-1S42 35-11543 ... MW-67A• MW-9A/ - 35-1546 NW- TOA/B 1W-30A/6 ADAPTED FROM BAKER FIGURE 35-IS44 O 35-1547 MW-14B 4 A A' I5 35-1S41 O 35 r5 IS37 3 • 35-IS45 dap OP- • . M'W -31A/B • MP-06e35 MONITORING WELL MW- a i a MW-63: MW-47A/B • r 3 38- 6• ■ , + 35-1502 35-IS1O OP-2D r IS3 35-IS62 P-U3D -46rt` TW-4EB •lutW-22:_ -1531 MW- :MW-32A/B 35-I GROUNDWATER SAMPLING BORING LOCATION GROUNDWATER AND SOIL SAMPLING BORING LOCATION IAS TRENCH CROSS-SECTION TRAVERSE it MW-66A* LEGEND 35-IS15 106-7260 TW-72 i' SOURCE. NCB CAMP LEJEUNE, 2000. ` TW-61 TW-61 T1AI-6 ]N-59 35- 5 ' TW- ■ 35 1STY,T 8 TW- a TW-5 a + TW 1- -7 -68 • W-7 3 20 'Tr 1 52 35-1516 ISI$g1- 5-ISO& . 'S• . - . $a TW-71 3 .-15 5 1-' TW-70 5-I Y! , 3 —55A/B 35-1507 1 TW-72 TW-73 5TW-74 5-1523 �� 5 62e3\2 M� 8 _ 35-1506 t MW_ /0r ! 35-I505 • a r w\ IS29 35 ■��'k�r MW-68B- 1 r. % S' • 35-1527 ° �lri 1528 MW-34A/B . SUPPLEMENTAL IN -SITU GROUNDWATER SAMPLE BORING INITIAL IN -SITU GROUNDWATER SAMPLE BORING NEW SHALLOW GROUNDWATER MONITORING WELL NEW INTERMEDIATE GROUNDWATER MONITORING WELL TEMPORARY WELL US 17 JACKSONVILLE BYPASS RIGHT-OF-WAY LIMITS US 17 JACKSONVILLE BYPASS EASEMENT LIMITS (APPROXIMATE FENCE LINE) 2219335N 75 150 f• � 1 inch = 150 ft. FIGURE 2-2 CROSS-SECTION LOCATION MAP SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA TL/CADI/PROJECTS/CHARLOTTE/CAMP LEJEUNE/SITE 88/PILOT STUDY CH2MH I LL w W 2219302N 40 - A A' NORTHWEST SOUTHEAST 20 - 35-IS35 0 — 40 - —60 - — 80 El 2 35-IS36 SILT, li FINE TO MEDI B.T.:-6.96' 35-IS37 e to some c trace li M SAND i ee sl ttlttl I 35-MW14A/B (PROJECTED 25' FROM SW) 35-1S38 FINE SAND, some silt B.T.:-6.96' LEGEND trace silt B.T.:-9.76' SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) GROUNDWATER ENCOUNTERED DURING DRIWNG ESTIMATED CONTACT — — — — — PROJECTED CONTACT — — — — TOP OF RIVER BEND FM (CASTLE HAYNE AQUIFER) — ' — — — TOP OF FIRST SEMI —CONFINING UNIT B.T.:-27.82' BORING TERMINATED (ELEVATION IN FEET MSL) ADAPTED FROM BAKER FIGURE B.T.:2.60' some silt nd clay B.T.:-6.02' FINE TO MEDIUM SAND B.T.:-21.40' 35-IS39 35-MW22 35-1831 35-IS30 FINE SAND, trace to some silt B.T.:-6.05' SHELL AND FOSSIL FRAGMaNTS B.T.:-19.00' r B0 0 40 80 Horizontal Scale: 1 inch = 80 ft. 20 0 10 20 Vertical Scale: 1 inch = 20 ft. 120 B.T.:-28.08' THE SOIL BORING INFORMATION IS CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. SOURCE: MCB CAMP LEJEUNE, 2000. B.T.:-28.62' 35-IS29 35-IS28 35-MW68B (PROJECTED 110' FROM SW) B.T.:-26.00' B.T.:-27.09' B.T.:-27.73' SILT, some very fine, little clay 0 o - F tD a FIGURE 2-3 GEOLOGIC CROSS SECTION A - A' SITE 35, FORMER CAMP GEIGER FUEL FARM LI PILOT STUDY WORK PLAN CTO-253 a MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA CH2MHILL 40 1 { 20 0- —40- - 60- - 80 - 0 0 Q B.T.:-27.82' B' NORTHWEST MW23S/D B.T. -3.00 MW63B MW4(pro from west) FINE SAND. Edits to some effi --- ^~.- SILTY SAND ,_ FINE TO COARSE SAND. trace sit B.T. -23.6 LEGEND SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) GROUNDWATER ENCOUNTERED DURING DRILLING ESTIMATED CONTACT PROJECTED CONTACT TOP OF RIVER BEND FM (CASTLE HAYNE AQUIFER) TOP OF FIRST SEMI —CONFINING UNIT BORING TERMINATED (ELEVATION IN FEET MSL) PEAT 35-TW59 35-1W60 35-TW61 35-TW66 35-TW67 35-IS09 35-TW68 FINE TO COARSE tOlfd0, 1t0e to Boma shell fmgrrteala (partially cemented eheN and fossil fragments) sane pact rns colon• FINE TO CdAREZ SAND, Imo to 35-TW69 35-MW64B 35-TW70 35-IS08 35-TW71 PST SIL , truce to little ali' 35-IS12 2219301N B SOUTHEAST MW65B I same fine to cantle orrneA (partially FINE c tied rhdl and fast fragments) NWWM TO SAND &T.-23.75' MEDIUM TO '- — ---p COARSE SAID ,�- -�-' S1U; 11d. dms damp ~' B.Ts-28.00' B.T.: 29.90' BT.:-2a55' B.T. 26.30' FINE D AND SILT. title day: dart _` ''-'-• SILT, damp B.T. 2&68' �, B.T» 26.98' B T.-2B.40' tittle fine nand FINE PEAT FINE SAND 80 0 40 80 �� LtIIIIIIIIIIIIItJ 120 Horizontal Scale: 1 inch = 80 ft. 20 0 10 20 40 Vertical Scale: 1 inch = 20 ft. THE SOIL BORING INFORMATION IS CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. nr of FINE TO COARSE S.A.L. and FINE TO COARSE GRAVEL (partially contented and fossil fragmen PEAT FINE TO COARSE SAND, trace LTD (partially fragments) shell and IR0e shell lfragments B.T. -29.1 FIGURE 2-4 GEOLOGIC CROSS SECTION B-B' SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA 1 CH2MHILL 30- 15- 0 — 30- - 45 - —60 - CI SOUTHWEST 35-MW26B 35-IS49 (Projected) —7 jj B.T.:-6.76' FINE SAND, trace silt SOUTHBOUND LANES HIGHWAY 17 BYPASS 35-IS30 SILT, some fine sand,' trace clay FINE SAND, trace silt FINE SAND, some shell fragments, trace silt SILT, some fine sand, little shell fragments, trace clay B.T.:-26.8' B.T.:-26.62' LEGEND SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) GROUNDWATER ENCOUNTERED DURING DRILLING ESTIMATED CONTACT PROJECTED CONTACT TOP OF RIVER BEND FM (CASTLE HAYNE AQUIFER) TOP OF FIRST SEMI —CONFINING UNIT B.T.:-27.82' BORING TERMINATED (ELEVATION IN FEET MSL) ADAPTED FROM BAKER FIGURE SILT, trace fine sand and clay I4DIUM TO COARSE D, trace si �i.-rINE TO COARSE GRAVEL AND L'MEDIUM SAND (partially cemented iLpnd shill frairtsL_ B.T.:-30.23' so D 30 60 120 I 1 1 I Horizontal Scale: 1 inch = 60 ft. 15 0 7.15 15 30 Vertical Scale: 1 inch = 15 ft. HIGHWAY 17 BYPASS NORTHBOUND LANES HIGHWAY 17 BYPASS 35-MW72A 35-MW72B 1 FINE SAND, trace silt FINE SAND 35-1W50 351W62 35 35-TW521TW51 35-1W63 �TW59 35-TW64 354W60 35-TW65 35-1W61 SILT, little ro is T � BRINSON CREEK - -- 35-TW75 j 35-TW76 / 35-TW77/ 2219300N C NORTHEAST 35-TW72 35-TW73 35-TW74 PEAT SILT, little clay AND SILT SILT, trace wood fragment ,e SILT, tr•-Jce clay N FINE SAND, trace silt + _ _HOMO_ Bale #Rsome silt r_ FINE T COARSE SAND, little layers of FINE TO COARSE GRAVEL FINE GRAVEL (partially cemented cnd FINE TO ] COARSE SAND shell a fossil fragments) (partially ce nted shy-', and THE SOIL BORING INFORMATION IS CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. SOURCE: MCB CAMP LEJEUNE, 2000. SILT, little lay Fl E SAND AND SILT fossil fragments) FINE 10 COARSE GRAVEL B.T.•`-15.33— - B-i-7-2325 B.T.-23.61' B.T.:-25.5T SILT, trace to little shell fragments, trace fine sand and clay; damp B.T.:-26.98' FIGURE 2-5 CROSS SECTION C-C' SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA 35-MW-37A 13.18 35-MW-29A NA 35-MW-38A . ' 13.23 13 I I I I L 35 ,MW-f-_,..._ 35-MW-10 10.80 • 35-MW-30A 12 11.90 3544 35-MW-31 7.78 LEGEND • 35-MW-32A 9.35 10 35-MW-61A 1.74 35-MW-66A 8. SGO1E1 — STAFF GAUGE 35—MW31A, — SHALLOW MONITORING WELL 738 - GROUNDWATER ELEVATION (MSL), MEASURED ON 04/21/02 — GROUNDWATER CONTOUR — GROUNDWATER FLOW DIRECTION — DATA NOT AVAILABLE — HIGHWAY 17 BYPASS RIGHT—OF—WAY — GROUND SURFACE ELEVATION CONTOUR NA ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. 35-MW-62A 1.56 • 5-MW.47A NA 9 ` 35-MW-34A\ 9.68 • SGO1 • a,. 2219352N • .k NN 150 75 150 1 Inch = 150 ft. FIGURE 2-6 SURFICIAL AQUIFER GROUNDWATER CONTOUR MAP SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROUNA z CH2MHILL 35—MW-37B 13.01 il i1 \II i li 4',./:::';:'-':-.1'''' 1_ ...._ _____ __ .......:...... : __!_' --/-1,1--' \ 1,415.':,....:: L. ---:'::::';" i '. 14 i 11 f i it L. --' IIc"l s II 1 r') " \ 35—MAY-9D \ 10i22 �j1 11 j11 35-M14410 10.83 35-MW-63B 2.28 • 35-MIRY 6 B Z,73 DNA • 2 35-MW-6SB Q 1.93 Eft. 3 7\ 35—MW-21 , NA ,1 35—MW-38B. 13.14 35—M.W-708 13.39 35—M —39B • 13.88 13 12 11 35—MW-30B 0- 11.87 354114440B 11.43 35—MW-32 9.21 • 35 213 9.21 NA 35—MW-34B 8.44 0 35— $ —41 B NA 10 35—IA- 89B 8.98 LEGEND — INTERMEDIATE MONITORING WELL — GROUNDWATER ELEVATION (MSL), MEASURED ON 04/21/02 — GROUNDWATER CONTOUR — GROUNDWATER FLOW DIRECTION — DATA NOT AVAILABLE — HIGHWAY 17 BYPASS RIGHT—OF—WAY — GROUND SURFACE ELEVATION CONTOUR MATED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE. 2000. / 2219353N o q Ian 280 1inch =280 ft. FIGURE 2-7 UPPER CASTLE HAYNE AQUIFER F GROUNDWATER CONTOUR MAP if,,, SITE 35, FORMER CAMP GEIGER FUEL FARM a PILOT STUDY WORK PLAN MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA C112MHILL e e % e \\ I ' : 35451 35-4S42 e I.C,'-47A/B • "! 3.5 -Nr-,?- 1'1,-- ! '... or-f , H3 ,r 1537- '''' ' .1 :_......j. fit..,.___•.,-.......--_--,, !,.,,r_ 35 -It.ks4\. • • \ t-c.:.-•-'•'' " ''''. ''l .._ • e e % - _.•..... ••, • . • ____ _. 352ft , , • 1/354154 w_14kis ., e • 35— e '•'• 2. - - 't35-IS , • ; . 161-9A1Br .1,....: r,"4•''..i.- • '; ; ; • *-43.5toz46 ,..ao -1545', : ' ; 35-1540L'AP P • Tw_ =, 43--------''' I 0;04"--J OP-1D .41-450 B 0•-,,, 'A. • ‘ • :: • -0e . 35 -IS 911W-21 ---------------- ' ,t ..! MW-321A/T • •. . MW—'i0E1 •;•,, ••;••1 • t • - • . • • - • II: ?.::.;'„," ! • --- . . • ; :";•;:.7 ; ADAPTED FROM BAKER FIGURE 5 Tw-72 Vrw-73 TW-74 51 TV-70 !: 3547 3,5-1540 -7—71 35IS mw-10A/0 'f' % • - ' . : • I t , 1 ' . ' . ..„ A .-- '''' ''''• -1; S.2\7\• . , ,- QC ', ''''1 ,N. 4 . ''. t , ' : ..1.. , 4, i • • ; • t • ‘: 1 ; • ; 35 - ".• \ 35 -115Site . e , ., ,..N. ......_...., „ -----,......- \..„. ....‹.,\,,,..‘. .. , ,p:_.L. 2.N% , 4.. m„,/,3, .. , ; : , .. .%.:-_,,,, ,-•:. ;, .' ' i :, io.,„.";.:‘!:, ".,. i '; 1' ''. .." - ; • ‘J. - : i He-- --• ••• • \ .•°. ; : ! i I I , . ' ••••'!",' -: i \ • \ \ ._ . .i.:1 --... -•-• '.;:-"'.Z. ; , • ., .....1 ";: ; , _._........ \ -\ \:\ '-, ....:-.:. -.7.-1 '....: :, --- .-4.11: ' • 10 ugAli 1 CONTOUR -INFt0RD , , , ‘.._.........___....—___... t ' " MW-4/B • . \‘• • H • • • ; • 4.4:4os LEGEND - ---- • — US 17 JACKSONVILLE BYPASS RIGHT—OF—WAY LIMITS US 17 JACKSONVILLE BYPASS EASEMENT LIMITS (APPROXIMATE FENCE UNE) MIY-14B• MONITORING WELL TV-49. TEMPORARY WELL FROM FOCUSED NAE STUDY • GROUNDWATER SAMPUNG BORING LOCATION GROUNDWATER AND SOIL SAMPLING BORING LOCATION 4*0•M IAS TRENCH GROUNDWATER FLOW DIRECTION IN TIE SURRC1AL AND CAME RAYNE AQUIFERS MW-41B • NOTES: 1.) LOCATIONS IN 2R0V4 USED TO GENERATE PLUME MAP. 2.) MEAN SEA LEVEL (MSL) = 0.0 FEET SOURCE: NCR CAMP LEJEUNE, 2000. 2219339N III 2,000 ugli. III 1,000 ugil- r 500 ug/L 250 ugiL. 100ugiL 200 0 100 200 )M 1 inch ROO it • FIGURE 2-8 TCE IN GROUNDWATER 15-FT TO 25-FT BELOW MSL SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA 9 CH2MHILL 40 20 - A NORTHWEST 35-IS35 35-1536 SILT, lit FINE TO MEDI l,. 0 ' in 1- —20- z 1 —40 - — 60 - — 80 - FINE SAND, some silt LEGEND 35-MW14A/B PROJECTED 25' FROM SW 35-I838 FINE SAND, $ome silt .nd clay 35-IS37 trace silt Q SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) 2 GROUNDWATER ENCOUNTERED DURING DRILLING ESTIMATED CONTACT PROJECTED CONTACT B.T.:-27.82' BORING TERMINATED (ELEVATION IN FEET MSL) ..t±1M eh:ram= 35-IS39 FINE TO EDILBAT-SAim' B.T.: 6.05' 35-MW22 35-IS31 FINE SAND, trac SHELL AND FOS B.T.:-28.08' so 0 40 so 120 1 1 I Horizontal Scale: 1 inch = SO ft. 20 0 10 20 40 I _=�_ Vertical Scale: limil1 inch = 20 ft. THE SOIL BORING INFORMATION 1S CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. SOURCE: MCB CAMP LEJEUNE, 2000. 35-1830 2219317N A' SOUTHEAST 35-IS29 35-IS28 35-MW68B PROJECTED 110' FROM SW B.T.:-27.73' SILT, some very fine, little cloy • 2000 ug!L 1,000 ugiL 500 uglL 100 uglL ▪ 10 ug*L FIGURE 2-9a VERTICAL DISTRIBUTION OF TCE CROSS SECTION A -A' SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA CH2M H I L z w a 8 40 20- 0- — 40 - — 60- - 80 B' NORTHWEST MW23S/D B.T. —3.00 FINE SAND. NM to eome sat TO COHSE SAND, truce mlt B.T. —23.8 LEGEND SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) ESTIMATED CONTACT PROJECTED CONTACT B.T.:-27.82' BORING TERMINATED (ELEVATION IN FEET MSL) MW63B M(projectedfrom i Ii FINE TO ClIVISE l*ri 0.. 7Nx Owe shell rngrr7e cermerW 9mi oral Nam.g MmLlel Ma er.: 0.1_ 29.9D' 35-1S09 MEWS 1D J RC .59g, Si7r, par 35-TW59 35-TW60 35-TW61 35-TW66 35-TW67 35-TW68 B.T. 2 56 NOTE: GROUNDWATER FLOW IS INTO PAGE. 80 0 40 so BT.:-7!-1G' 120 Horizontal Scale: 1 inch = 60 ft. 20 0 10 20 40 i I 1 Vertical Scale: 1 inch = 20 ft. 35-TW69 35-MW64B 35-TW7O 35-1508 35-TW71 lithe nne .arid 35-IS12 PEAT IC COARSE SAND COARSE CrfAVEL i Frapmenf) shot and' FINE SN91 AIi1 SILT. aft. don damp 9L31 de°`A 8.T.:-28.88' 4 aF. Z&�0 aTr2B.g8' THE SOIL BORING INFORMATION 15 CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. 2219314N B SOUTHEAST MW65B PEAT FINE TO COARSE SND, trace en (partially cemented forma tl fragmens) 01M r. Me shag fragmante B.T. —29.1 2.000 ug0.. MI 1,000 ugJL 500 ugiL 250 ugJL 100 ug!L NI 101g(L FIGURE 2-9b VERTICAL DISTRIBUTION OF TCE CROSS SECTION B-B' SITE 35, FORMER CAMP GEIGER FUEL FARM PLOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA CH2MHILL 30- C' SOUTHWEST 15- 0 — 30- - 45- -60 - B.T.:-27.82' 35-MW26B 35-IS49 (Projected) i B.T.:— FINE SAND, trace silt trace clay FINE SAND, trace silt SIL shell fro B.T.: 26.8' LEGEND SOUTHBOUND LANES HIGHWAY 17 BYPASS 35-IS30 SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) GROUNDWATER ENCOUNTERED DURING DRILLING ESTIMATED CONTACT PROJECTED CONTACT BORING TERMINATED (ELEVATION IN FEET MSL) GROUNDWATER FLOW DIRECTION IN THE SURFICIAL AND CASTLE HAYNE AQUIFERS HIGHWAY 17 BYPASS NORTHBOUND LANES HIGHWAY 17 BYPASS , 35-MW72A 35-MW72B FINE SAND, trace silt BRINSON CREEK — 35-TW49 35-TW50 35-TW6362 35-TW59 TW52 35-TW64 35-TW60 35- W51 SILT, trace fine sand - and clay B SILT, IitU NOTE: GROUNDWATER FLOW IS INTO THE PAGE. 60 0 30 60 35-TW65 35-TW61 120 1 NM IME 1 Horizontal Scale: 1 inch = BO ft. 15 0 7.5 15 Vertical Scale: 1 inch = 15 ft. 30 THE SOIL BORING INFORMATION IS CONSIDERED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT. SILT, trace to little shell fragments, trace fine sand and clay; damp 35-TW75 35-TW76 35-TW77 B.T.:-25.5' 2219340N C NORTHEAST 35-TW72 35-TW73 TW74 e clay T, trace clay le nted B.T.:— 50.98' ■ 2,000* ■ 1,000 uglL • 500 ugIL 250 ug*L 100 uglL ■ 10 uglL FIGURE 2-9c VERTICAL DISTRIBUTION OF TCE CROSS SECTION C-C' SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA ADAPTED FORM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. CH2MHILL ADAPTED FROM BAKER FKal!RE 7 ; • ; • • • • • • - • — • • . - • - • • •,• •• • •• • •• • • • • MW 4 • 35 •••:-.154.2, ;'f':,' • I ; •.:-.,) ..: .,,„:....-_.:. ,..-...: 354.;,',.%! i • i ., „ •., :, '35.-1 ai) ,. ,,... W-- 1 41,111, ,, ;,.,. , ,, e35 ,,3 5-•-;',.";•,.. . : . 4_ 6.'..--;''..i15..-•:l 4 ''.i:. 35 - • ; , ! - .; fovii-,:i i A/R • -'----Dt.;kf ''...V'f' i'‘-0513,,,o. •-: 3 -;•,.., --'4.'!;3'.9 * '1 - - ' i.. - ...,•:..,,,---.,..1: 1.:-.'..: ,•.,..,.,'....-.• •.;:.:,:.,:..: . .-.,- ,. 0 • , ! I-•••;•' • • ; • :5•;„/1-3 , : ,• .; , • , : i" • : • , ,4•" ! • • ! • ; ' • . • ; r. .„,: .... ,„„ •`', •,;\ .,', .)'•1 '41\ \ \ •1/4 '—‘1, MW ---6:3[i • i•,,fk- 4../.4/E-3 •••64 ..,;,... .14. ..... .... ''"" Vir “ t, .W 35 ‘ . —462 , • % r - . ., 3r_i • '2 411, .„ kf6 • • • ; • 10 ug/L CONTOUR INFERRED . t 5.2 74kZ2- ok - MW ` • 6CA e • ' • , f • ;,•,• • \ "v• • ;1/4 • ! ! I z • • • • 4(4 :3 ; ....... — • LEGEND ------ US 17 JACKSONVILLE BYPASS RIGHT—OF—WAY LIMITS US 17 JACKSONVILLE BYPASS EASEMENT LIMITS (APPROXIMATE FENCE UNE) MW-14B. MONITORING WELL TEMPORARY WELL FROM FOCUSED NAE STUDY GROUNDWATER SAMPLING BORING LOCATION GROUNDWATER AND SOIL SAMPLING BORING LOCATION IAS TRENCH GROUNDWATER FLOW DIRECTION IN THE SURFICIAL AND CASTLE HAYNE AQUIFERS • • I , • , NOTES: 1.) LOCATIONS IN ' ',USED TO GENERATE PLUME MAP. 2.) MEAN SEA LEVEL (MSL) .= 0.0 FEET SOURCE: MCB CAMP LEJEUNE, 2000. TW— TW-7.5 _ PILOT STUDY TREATMENT AREA • 2,000 ug/L 11. 1,000 ug/L 500 ug/L 250 ug/L 100 ug/L 200 1 inch = 200 it. FIGURE 2-10 TCE IN GROUNDWATER 15-FT TO 25-FT BELOW MSL SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA 2219339N 9 100 200 CH2MH ILL 35-IS36 35-IS42 * 35- 35�OS37�r"� 35vIS37,r:;�� 55-IS43 s 35-1 • 35-IS44 /435-IS41 346 5-IS45 O • • •+35-IS 35- IS40� 35_`S47 35 :S48 ■ ♦- 8 LEGEND US 17 JACKSONVILLE BYPASS RIGHT-OF-WAY LIMITS US 17 JACKSONVILLE BYPASS EASEMENT LIMITS (APPROXIMATE FENCE LINE) MONITORING WELL TEMPORARY WELL FROM FOCUSED NAE STUDY GROUNDWATER SAMPLING BORING LOCATION GROUNDWATER AND SOIL SAMPLING BORING LOCATION IAS TRENCH GROUNDWATER FLOW DIRECTION IN THE SURFICIAL AND CASTLE HAYNE AQUIFERS • • PROPOSED CHEMICAL OXIDATION INJECTION WELL PROPOSED MONITORING WELL ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. NOTE 1.) L 2.) M S: OC EA Figures (5erc) 30 15- 0 - 30 - - 45- - 60 - G' SOUTHWEST 35-MW26B 35-IS49 (Projected) B.T.: LEGEND SOUTHBOUND LANES HIGHWAY 17 BYPASS 35-IS30 SCREENED INTERVAL (GEOPROBE SAMPLER) SCREENED INTERVAL (PERMANENT AND TEMPORARY WELLS) GROUNDWATER ENCOUNTERED DURING DRILLING ESTIMATED CONTACT PROJECTED CONTACT B.T.:-27.82' BORING TERMINATED (ELEVATION IN FEET MSL) GROUNDWATER FLOW DIRECTION IN THE SURFICIAL AND CASTLE HAYNE AQUIFERS HIGHWAY 17 BYPASS NORTHBOUND LANES HIGHWAY 17 BYPASS — 35-MW72A 35-MW72B INJECTION WELL (PROPOSED) MONITORING WELL (PROPOSED) G NORTHEAST 35-TW49 35-TW50 35-TW62 35-TW75 354W51 35-TW63 35-TW59 35-1W76 35-TW72 \-3.r?1At52 35-TW64 35-TW60 35-TW77 35-7W73 __ 35-TW65 35-1W61 IS21-I r--1S22 35-TW74 BRINSON CREEK 2219340N 60 0 30 60 120 Horizontal Scale: 1 inch = B0 ft. 15 0 7.5 15 30 Vertical Scale: 1 inch = 15 ft. ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. B.T.: 30.98' ■ 2,000 ugA. MI 1,000 ug*L 500 ugiL 250 ugkL 100 ug4L IR 10 uglL FIGURE 3-2 VERTICAL DISTRIBUTION OF TCE CROSS SECTION C-C' WITH PROPOSED INJECTION °J WELLS AND MONITORING WELLS SITE 35, FORMER CAMP GEIGER FUEL FARM PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA 6w CH2MHILL 35—IS36 35—IS42 O 35—3 *-- 35vIS37.'' % 35—IS43 35—IS44 /35—ISL1 IS46 ± 35— S47 35-1 • wb `35*IS`8 35—IS45 35—IS46 rkb ■ • ^® 8 35-1 • LEGEND US 17 JACKSONVILLE BYPASS RIGHT—OF—WAY LIMITS US 17 JACKSONVILLE BYPASS EASEMENT LIMITS (APPROXIMATE FENCE LINE) MONITORING WELL TEMPORARY WELL FROM FOCUSED NAE STUDY GROUNDWATER SAMPLING BORING LOCATION GROUNDWATER AND SOIL SAMPLING BORING LOCATION IAS TRENCH GROUNDWATER FLOW DIRECTION IN THE SURFICIAL AND CASTLE HAYNE AQUIFERS ♦ Fa§ PROPOSED CHEMICAL OXIDATION INJECTION WELL • PROPOSFD MONITORING WFLL ADAPTED FROM BAKER FIGURE SOURCE: MCB CAMP LEJEUNE, 2000. TWW ♦ NOTES: 1.) LOCATIONS IN USED TO GENERATE PLUME MAP. 2.) MEAN SEA LEVEL (MSL) = 0.0 FEET 2219339N IT 2,000 uglL 1,000 ug!L II 500 ug/L 250 ug/L el 100 u9/L 0 50 100 i 1M - 1 inch = 100 ft. FIGU RE 5-1 PROPOSED MONITORING LOCATIONS PILOT STUDY WORK PLAN CTO-253 MARINE CORPS BASE, CAMP LEJEUNE NORTH CAROLINA CH2MHILL