HomeMy WebLinkAboutWI0800037_Site Plans/Maps_20030924MIDWAY PARK
(LCH)
lot.; f 4 t
1
ji CAMP
411,"
MILITAR
OU #2
OU #1
CAMP LEJEUNE
BOUNDARY
IVA.K,JAMt/ takff CLEVC10 2/SrrE IM/ea TECH tvALuATION /.WO FL
21114170
VICINITY MAP
P LEJEUNE
BOUNDARY
CAMP LEJEUNE
MIUTARY RESERVATION
J.EBEE12
86 DENOTES RI SITE 88
• (NOT TO SCALE)
DENOTES OPERABLE UNIT #16
(NOT TO SCALE)
DENOTES PRE —RI SITE
(NW To SCALE)
FIGURE 2-1
OPERABLE UNIT AND SITE LOCATION MAP
OPERABLE UNIT No. 20 - SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
CH2MHILL
d
Current Site 86
Figure 2-2
Site Plan
Operable Unit No. 20 - Site 86
Pilot Study Work Plan
Marine Corps Base, Camp Lejeune
North Carolina
CH2M HILL
AS211
AS212
AS215
�� AS216
TA
AS414
AS416
AS515
CD 0
200
i
oc
SITE 86
—81=GW171W
86-GW
i
I
86
86-GW1
86- 0 .W
- 03
667:war
AS541 86'i
86-GW2411�}1 A5il
B6-GWR7
86-GW2 IW
4 EL1COPTER
WASH PAD
T
—86=G 301W
n 100 200
Cat. fig
i inch = 200 it
6--W1-6DW
121W
AS510
W19DW
W101W
86-GWWI5DW
86-GWWWI 51W
AS502
86-GW21 IW
SA.S322
AS320
AS424
86-
86-GW231W
86-GWW221W
i
A5504
LEGEND
$ - SHALLOW MONITORING WELL (RI - 1995)
$ - INTERMEDIATE MONITORING WELL (UST PROGRAM)
• - INTERMEDIATE MONITORING WELL (RI - 1995)
INTERMEDIATE MONITORING WELL (POST RI - 1997)
INTERMEDIATE MONITORING WELL (AMENDED RI - 2002)
J - DEEP MONITORING WELL (RI - 1995)
GW32
■
$
$
DEEP
DEEP
DEEP
-GW33IW
6- W33DW
DRAINAGE DITCH
MONITORING WELL (POST RI - 1995)
MONITORING WELL (POST RI - 1997)
MONITORING WELL (AMENDED RI - 2002)
A' "l
86-GW34IW 1
FIGURE 2-3
REVISED CROSS SECTION A -A'
OPERABLE UNIT No. 20 SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAW CLEAN/CTO 253/SITE 86/86 TECH EVALUATION /CARD FILES
SOURCE: Amended Remedial InvesUgaUon, Operable Unit No. 20, Site 86 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL, Inc. May, 2000.
CH2MHILL
20 -
0
— 20-
— 60 -
— 80-
-100 -
A
SOUTHWEST
86-GW08IW
86-GW17DW
SAND,
SOME
SILT
86-GW16DW
CLAY, SOME SILT
86-GW29IW
86-GW31 IW
FINE SAND AND SIL ,
SOME CLAY
FINE TO COARSE SAND
TRACE TO SOME SILT
AND CLAY
• =-12.48'
SHELL AND FOSSIL
FRAGMENTS
FINE SAND, TRACE SILT
SHELL AND FOSSIL
FRAGMENTS
FINE TO MEDIUM SAND,
SOME CLAY
1 CLAY, TRACE SILT
B.T. =-90.54'
FINE SAND
SHELL FRAGMENTS
B.T. =-45.03'
B.T. =-77.99'
200 0 100 200 400
Horizontal Scale: 1 inch = 200 ft.
20 0 10 20
I I I
40
Vertical Scale: 1 inch = 20 ft.
86-GW32IW
FINE TO MEDIUM SAID,
TRACE SILT
FINE TO MEDIUM STAND
SOME SILT
B.T. =-40.47'
THE SOIL BORING INFORMATION IS CONSIDERED TO BE REPRESENTATIVE OF
SUBSURFACE CONDITIONS AT THE RESPECTIVE BORING LOCATIONS. SUBSURFACE
CONDITIONS INTERPOLATED BETWEEN BORINGS ARE ESTIMATED BASED ON
ACCEPTED SOIL ENGINEERING PRINCIPLES AND GEOLOGIC JUDGEMENT.
B.T. =-44.77'
LEGEND
WELL SCREEN
ESTIMATED CONTACT
INTERPOLATED CONTACT
B.T. BORING TERMINATION (ELEVATION)
86-GW33DW 86-GW34IW
CLAY, TRACE SILT
SOME SAND
FINE SAND, LITTLE TO SOME
SILT, TRACE TO LITTLE CLAY
CLAY, SOME SHELL
FRAGMENTS
FINE SAND, SOME CLAY AND
SHELL FRAGMENTS
FINE SAND, SOME SILT
AND CLAY, TRACE SHELL
FRAGMENTS
H
B.T. =-77.18'
20
L.
B.T. =-32.81'
0
10
NORTHEAST
20
it inch = 20 ft.
- 20
- 0
- —20
- —60
- —80
- —100
Figure 2-4
REVISED CROSS,SECTION A -A'
OPERABLE UNIT No. 20 - SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAVY CLEAN/CTO 253/SITE 86/86 TECH EVALUATION /CADD FILES SOURCE: Amended Remedial Investigation, Operable Unit No. 20, Site 86 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL, Inc. May, 2000.
2191413D
CH2MHILL
c�
AS215
n �
AS414
AS416
O 0
AS515
SITE 86
AS541
r
4k
i
S O IS40
8603 — S
NS
200 M 10
1 inch = 200 ft.
�f = AS23
AS238
2
� 1526
l 6
AS51 I 5
NI
I
I 115 4
SA$322
I L.
AS320
so. ale
AS424
2L Standard
AS504
1S12
D • 86-IS11
i 86-IS16 NS •
�`�---'. 86-IS07 • 86-I508 ND
• NS
86-IS09
NS •NS • 86-IS14
86-IS10 • • NS
gt., NO 86-IS06 ND
6-IS13
N86-IS 19
r INS
At.
425
S33
•
4:10
A`. 0.8
LEGEND
• - AUGUST 2001 GROUNDWATER SAMPLING LOCATION
SAMPLING LOCATION AND GROUNDWATER
• - JANUARY 2002 GROUNDWATER SAMPLING LOCATION
ND - COMPOUND NOT DETECTED
NS - INTERVAL NOT SAMPLED
• ND
86-IS18
•
NS
DRAINAGE DITCH
86-IS15
•
NS
NS
•
86-IS17
?1,000 ugiL
• 500 ugiL
• 400 ug/L
• 3D0 ilg/L
s?- 200uc'L
105] uO/L
ON 50 ug/L
C 25 ug/L
MI 1 D LIg/L
FIGURE 2-5
EXTENT OF TCE ABOVE THE 2L
STANDARD (30 TO 34 FEET BGS)
OPERABLE UNIT No. 20 - SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAVY CLAN/CTO 253/SITE 86/86 TECH EVALUATION /CADD FILES
SOURCE: Amended Remedial Investigation, Operable Unit No. 20, Site 86 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL, Inc. Moy, 2000.
21014020
CH2MHILL
AS414
L�1
AS416
AS515
38
D
37
0
D
SITE 86
f
-_$6102.
NS
86-{S03
NNDDD
200 100 200
1 inch = 200 ft.
Ari
OO 1540
NS
IS25.-
1512
ND 416-IS11
• 13$-S 16 1
8 1'SI77 • 86-IS08 NS
•
—1514 •
N '86 06
6-15 t§
• NS
1533
Q �
A0
ATE28
•E6-i:
3
2L Standard
LEGEND
* — AUGUST 2001 GROUNDWATER SAMPLING LOCATION
- SUBSURFACE SOIL AND GROUNDWATER
SAMPLING LOCATION
▪ - JANUARY 2002 GROUNDWATER SAMPLING LOCATION
ND - COMPOUND NOT DETECTED
NS - INTERVAL NOT SAMPLED
86-IS14 'k
NS
86-IS13
*NS
86-1S18
NS
DRAINAGE DITCH
ss-IS15
•
ND
NS
•
86-IS17
?1,400 ug?L
■ 50,0. ucg/L
• 400 ug/L
� 800 ug+L
• 200 u g+L
100 ug/L
r 50 ug/L
25 ug?L
• 10 ue/L
2191406D
FIGURE 2-7
EXTENT OF TCE ABOVE THE DETECTION
LIMIT (50 TO 54 FEET BGS)
OPERABLE UNIT No. 20 — SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAVY CLEAN/CT0 253/SITE 86/86 TECH EVALUATION /CADD FILES
SOURCE: Amended Remedial Investigation, Operable Unit No. 20, Site 88 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL, Inc. May, 2000.
CH2MHILL
AS214 �_-
—AS215
AS414
AS515
IS37
O
ND
200
1 h
1 inch = 200 ft.
SITE 86
AS541
8
86-03
100 200
A503
AS236
/
% /
—1S.11
- /
-i 01-""
OO 1540
NS
UPGRADIENT PLUME
AS504
�3q�91
2L Standard
AS3J?8
LEGEND
• - AUGUST 2001 GROUNDWATER SAMPLING LOCATION
- SUBSURFACE SOIL AND GROUNDWATER
SAMPLING LOCATION
OO - JANUARY 2002 GROUNDWATER SAMPLING LOCATION
ND - COMPOUND NOT DETECTED
NS - INTERVAL NOT SAMPLED
r
86-1,5,J 8
,
` 2 2
DRAINAGE DITCH
ti
SITE 86 PLUME
ND
86-I517
�1.000 ug!L
500 ug/L
In 400 ug/L
MI 300 ue'L
200 ug'L
100 ugiL
• 5,01.40.4.
25 ucg/L
I♦ 10 vg?L
FIGURE 2-8
HORIZONTAL WELL TARGET AREA
TCE PLUME (40 TO 44 FEET BGS)
OPERABLE UNIT No. 20 - SITE 86
PILOT STUDY WORK PLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAVY CLEAN/CTO 253/SITE 86/86 TECH EVALUATION /CADD FlLES
SOURCE: Amended Remedial Investigation, Operable Unit No. 20, Site 86 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL, Inc. May, 2000.
CH2MHILL
20
— 40
— 60
LEGEND
m 86—GW37IWA —
86—GW37IWB —
• 86—GW02 -
-
ND —
IS3
•
ND
SITE 86
1
86—GW13
86—GW 141W
6T,W IOW 8B
86—GW171W 86 GW07,. 86—GW11
86—GW17DW 1:-=} 86—
86— W01*€
86—G 02IW ' ''�
86—GW1
86-6661. 03
86-d"WQ61W
86 `
W161W'
____86—GW1-6
W121W
6- W20 W
6— W19DW
f10Iw
6—GW15DW
86—GW15IW
86—GW38IWA
86—GW371WB
86—GW321W
86—GW281Wj 86—GW36IWA
.';86—GW351WA--I
86-GW3itiwo-_ _.
1631
zrf
86-G+v _ f 86-`-GW3SIWBv l..
OA
1 /3t�`
i
i
:V`j
86—A8428-0006,.
86—GW23IW
86—GW39IWA
86—GW38IWB
86—G.W37IWA
86GW361WB
86-1
PILOT
TEST
TRAILER
86—GW33IW
86—GW33DW
86—GW39IWB
86—IS15
86—GW341W40.
86 1517
:s.
7
86-1841166-GW1.i1A
. E2e
68-129 88-
8-GW31DW
1535
86.1819
6-.809
88-1811/la'8-GW380W
B�1515
$GIS1%
.
Ail
.
O
0
0
N
0
V
O
O
a+0
o
C
0
O
N
0
1..-
O
t+D
O
DO
O
O
N
D
cV
CV
NEW PILOT TEST MONITORING WELL LOCATION (SHALLOW)
NEW PILOT TEST MONITORING WELL LOCATION (DEEP)
EXISTING MONITORING WELL
JANUARY 2002 GROUNDWATER SAMPLING LOCATION
COMPOUND NOT DETECTED
•
NS
— AUGUST 2001 GROUNDWATER SAMPLING LOCATION
— SUBSURFACE SOIL AND GROUNDWATER
SAMPLING LOCATION
— INTERVAL NOT SAMPLED
SI — TCE IMPACTS IN GROUNDWATER
GREATER THAN 200 UG/L
— 277' ENTRY/EXIT RISER PIPE LENGTH
ommmr — 400' SCREEN LENGTH
20
0
20
40
60
200 0 100
inch = 200 ft.'
Horizontal
2191403D
7.00
20 9 10 20
1 inch = 20 1t.
Vertical
ELEVATION (FEET, MSL)
FIGURE 3-1
OPERABLE UNIT No. 20 - SITE 86
PILOT STUDY WORKPLAN
MARINE CORPS BASE, CAMP LEJEUNE
NORTH CAROLINA
P:/PROJ/EBT/NAVY CLEAN/CTO 253/SITE 86/86 TECH EVALUATION /CADD FILES SOURCE: Amended Remedial Investigation, Operable Unit No. 20, Site 86 — Tank Area AS419 — AS421, BAKER ENVIRONMENTAL. Inc. May, 2000.
CH2MHILL
i
4' L❑CKING
PLUG (INSPECTION/
CLEANING PORT)
12" SQUARE
FLUSH MOUNTED
STEEL ACCESS
VAULT (TYP)
4' SCR 11
HDPE RISER
(TYP)
ATL/PROJECTS/CHARLOTTE/CAMP LEJEUNE/SITE86/WORKPLAN
GROUND SURFACE
CEMENT GROUT
NATURAL COLLAPSE
MATERIAL IN
ANNULAR SPACE
NOT TO SCALE
FROM
SPARGE SYSTEM
7 1/2"
4" SDR 11 BORE HOLE
CUSTOM SLOTTED PIPE
(N❑N-UNIF❑RM SLOT SPACING/SIZE)
Figure 3-2
CONCEPTUAL HORIZONAL WELL
CONSTRUCTION DETAIL
PILOT STUDY WORK PLAN
OPERABLE UNIT NO. 20—SITE 86
MARINE CORPS BASE, CAMP LEJEUNE
CH21VIHILL
1
2
3
4
5
6
MAIN
j DISCONNECT
(230V/3 PH)
AMBIENT
AIR
AMBIENT
AIRr_ir>
PLC
SHUTDOWN
IAF-100 I
AIR FILTER
I M- 100-1 I
SILENCER
4-
1
AUTO
-J
PSV 100
SILENCER
�TI 1 PI
100
BLEED
VALVE
ON
AMBIENT
AIR
r
OXYGEN
GENERATOR
COOLING FAN—��
FAIL
SHUTDOWN
TO AMBIENT AIR
EXHAUST
� —COOLING FAN
1117
OZONE
GENERATOR
TO AMBIENT AIR
EXHAUST
OZONE
CONCENTRATION
MEASUREMENT
1
OT �
200
REMOTE
MOUNTED LEAK
DETECTOR
ALARM
1
BOOSTER
PUMP
IM-202I
J
4
PIT
201
PI
202
TO HORIZONTAL WELL
Figure 3-3
DSGN M. STRONG
DR R. MCCLINTOCK
CRK M. STRONG
APVD C BOZZINI
NO. DATE
REVISION
BY APVD
CH2MHILL
PILOT STUDY WORK PLAN
OPERABLE UNIT NO. 20 — SITE 86
MARINE CORPS BASE, CAMP LEJEUNE
PROCESS INSTRUMENTATION AND CONTROLS
OZONE SPARGE SYSTEM
NO. FIGURE 3-3
DATE JULY2003
PROJ
NO. 174057.TW.WP.86
E072003015ATL 1 Navy 100.ai EBL\NAVY CLEAN\CLEAN 21CTO 253\SITE 86186 TS WORK PLAN\CADD FILES
PID.pdf 16-JULY-2003