Loading...
HomeMy WebLinkAboutWI0800037_Correspondence_20041227Camp Lejeune Site 86 Horizontal Well Subject: Camp Lejeune Site 86 Horizontal Well Date: Mon, 27 Dec 2004 12:03:52 -0700 From: <Chris.Bozzini@CH2M.com> To: <jesse.wiseman@ncmail.net> CC: <randy.mcelveen@ncmail.net> Jesse This should be the information that you have been looking for. Sorry for the delay. Let me know if you have any questions. Chris Christopher F. Bozzini, P.E. Project Manager CH2M HILL 4824 Parkway Plaza Blvd., Suite 200 Charlotte, NC 28217-1968 direct: 704-329-0073 x291 fax: 678-579-8119 mobile: 704-819-6827 cbozziniefIch2m.com -----Original Message From: Jackson, William/CLT Sent: Monday, December 27, 2004 2:01 PM To: Bozzini, Chris/CLT Subject: Points Chris, Attached is the information sent to me from Brent Lanier Listed below are the entry and exit coordinates. Please let me know if you need more information. SITE 86 NEAR DATE 12/07/04 STATE PLANE FEET NAD 83 VERTICAL NGVD 29 FEET BENCHMARK REFERENCE NCGS WASHETT Entry Point Northern: 356479.08 Eastern: 2467983.79 Exit Point Northern: 356821.76 Eastern: 2468809.49 Lsw 442-55$ LAT; ;4.1 0 - -I. u 3 1'13 I-- AT: 3y. '12e 2-1to 1 of 1 12/28/2004 9:13 AN Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality December 30, 2003 Mr. Randy McElveen Superfund Section - Division of Waste Management 1646 Mail Service Center Raleigh, NC 27699-1646 Subject: Ozone Sparging Pilot Test at Camp Lejeune Site 86 Dear Mr. McElveen: The Underground Injection Control Group of the Groundwater Section of DWQ has reviewed the Draft Site 86 Pilot Study Work Plan for injection of ozone at Site 86 of the US Marine Corps Base — Camp Lejeune, received on October 3, 2003. The proposed injection project as presented in the Draft Pilot Study Work Plan meets relevant state regulatory requirements (15A NCAC 2C.0200) for construction and operation of injection wells. Due to the site's status as a National Priorities List site, the state's administrative permitting requirements have been waived for this project. A technical report summarizing the project and including monitoring data should be submitted to the UIC Program upon completion of the injection project. If you have any questions regarding this letter please contact me at (919) 715-6165. Sincerely, a Evan O. Kane, L.G. Underground Injection Control Program Manager cc: Charlie Stehman — GWS, Wilmington Regional Office CO-UIC files N. C. Division of Water Quality / Groundwater Section 1636 Mail Service Center Raleigh, N.C. 27699-1636 Phone: (919) 733-3221 Fax: (919) 715-0588 Internet: http://gw.ehnr.state.nc.us ATA RUDENR Customer Service 1-877-623-6748 North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor William G. Ross Jr., Secretary Dexter R. Matthews, Director October 1, 2003 Evan Kane UIC Section, Division of Water Quality NC DENR A7A NCDENR RE: Request for Review of Ozone Sparging of the TCE Plume in Groundwater at Site 86 Operable Unit 20, Site 86 Draft Pilot Study Work Plan Soil and Groundwater Camp Lejeune, NC6170022580 Jacksonville, Onslow County, North Carolina Dear Mr. Kane: The NC Superfund Section is in the process of completing a Pilot Study Work Plan to treat the "hot spot" of the TCE Plume at Site 86 of the Camp Lejeune, MCB. This effort is being completed in hopes that we can reduce the source "hot spot" of the TCE plume at the site to the 2L Standard or at a minimum significantly reduce the time required for the TCE plume to reach the standard. Please review the attached Pilot Study Work plan for the proposed injections. If you need additional groundwater data of hydrogeology please drop by our office and get copies of any of the remedial investigation work. You may also contact Rich Bonelli with Baker Environmental and he may be able to provide electronic data or RI information. I will email this information to you and copy Rich Bonelli. We are scheduled to start this injection work in late December or January. Sincerely, YYL`tc�. r db Randy McElveen Environmental Engineer NC Superfund Section Cc: Dave Lown, NC Superfund Section SI: Wd C-13000 1646 Mail Service Center, Raleigh, North Carolina 27699-1646 Phone: 919-733-4996 \ FAX: 919-715-3605 \ Internet: www.enr.state.nc.us AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER CH2MHILL July 25, 2003 174057.TS.WP.86 Kirk Stevens LANTNAVFACENGCOM Code:EV23 1510 Gilbert St., Bldg. No. N26 Norfolk, VA 23511-2699 SEP 2 4 2J3 Subject: CTO 253 - Site 86 Draft Treatability Study Work Plan Dear Kirk: CH2M HILL 4824 Parkway Plaza Boulevard Suite 200 Charlotte, NC 28217-1968 Tel 704.329.0072 Fax 704.329.0141 CH2MHILL is pleased to submit the draft version of the Treatability Study Work Plan for Site 86, Operable Unit No. 20. Copies have been sent to the following: MCB Camp Lejeune, US Environmental Protection Agency, NC Department of Environment and Natural Resources, Naval Environmental Health Center Shaw Group, and Baker Environmental. In order to maintain the overall project schedule, we would like to receive comments to the document by September 12, 2003. This due date allows 45 days for review. If you have any questions or comments, feel free to contact me at (704) 329-0073 x291. Sincerely, CH2M HILL Christopher F. Bozzini, P.E. Activity Manager CLT\draft work plan cover letter.doc c: Rick Raines, MCB Camp Lejeune Randy McElveen, NCDENR Charlie Stehman, NCDENR, Wilmington Gena Townsend, EPA Region 4 (2 copies) David McConaughy, NEHC Ron Kenyon, Shaw Group Rich Bonelli, Baker Environmental