HomeMy WebLinkAboutWI0800037_Correspondence_20041227Camp Lejeune Site 86 Horizontal Well
Subject: Camp Lejeune Site 86 Horizontal Well
Date: Mon, 27 Dec 2004 12:03:52 -0700
From: <Chris.Bozzini@CH2M.com>
To: <jesse.wiseman@ncmail.net>
CC: <randy.mcelveen@ncmail.net>
Jesse
This should be the information that you have been looking for. Sorry for the delay.
Let me know if you have any questions.
Chris
Christopher F. Bozzini, P.E.
Project Manager
CH2M HILL
4824 Parkway Plaza Blvd., Suite 200
Charlotte, NC 28217-1968
direct: 704-329-0073 x291
fax: 678-579-8119
mobile: 704-819-6827
cbozziniefIch2m.com
-----Original Message
From: Jackson, William/CLT
Sent: Monday, December 27, 2004 2:01 PM
To: Bozzini, Chris/CLT
Subject: Points
Chris,
Attached is the information sent to me from Brent Lanier Listed below are the entry and exit coordinates. Please
let me know if you need more information.
SITE 86 NEAR DATE 12/07/04
STATE PLANE FEET NAD 83
VERTICAL NGVD 29 FEET
BENCHMARK REFERENCE NCGS
WASHETT
Entry Point
Northern: 356479.08
Eastern: 2467983.79
Exit Point
Northern: 356821.76
Eastern: 2468809.49
Lsw 442-55$
LAT; ;4.1 0
- -I. u 3 1'13
I-- AT: 3y. '12e 2-1to
1 of 1 12/28/2004 9:13 AN
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P. E. Director
Division of Water Quality
Coleen H. Sullins, Deputy Director
Division of Water Quality
December 30, 2003
Mr. Randy McElveen
Superfund Section - Division of Waste Management
1646 Mail Service Center
Raleigh, NC 27699-1646
Subject: Ozone Sparging Pilot Test at Camp Lejeune Site 86
Dear Mr. McElveen:
The Underground Injection Control Group of the Groundwater Section of DWQ has reviewed the
Draft Site 86 Pilot Study Work Plan for injection of ozone at Site 86 of the US Marine Corps
Base — Camp Lejeune, received on October 3, 2003. The proposed injection project as presented
in the Draft Pilot Study Work Plan meets relevant state regulatory requirements (15A NCAC
2C.0200) for construction and operation of injection wells.
Due to the site's status as a National Priorities List site, the state's administrative permitting
requirements have been waived for this project. A technical report summarizing the project and
including monitoring data should be submitted to the UIC Program upon completion of the
injection project.
If you have any questions regarding this letter please contact me at (919) 715-6165.
Sincerely,
a
Evan O. Kane, L.G.
Underground Injection Control Program Manager
cc: Charlie Stehman — GWS, Wilmington Regional Office
CO-UIC files
N. C. Division of Water Quality / Groundwater Section
1636 Mail Service Center Raleigh, N.C. 27699-1636
Phone: (919) 733-3221 Fax: (919) 715-0588 Internet: http://gw.ehnr.state.nc.us
ATA
RUDENR
Customer Service
1-877-623-6748
North Carolina
Department of Environment and Natural
Resources
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Dexter R. Matthews, Director
October 1, 2003
Evan Kane
UIC Section, Division of Water Quality
NC DENR
A7A
NCDENR
RE: Request for Review of Ozone Sparging of the TCE Plume in Groundwater at Site 86
Operable Unit 20, Site 86 Draft Pilot Study Work Plan
Soil and Groundwater
Camp Lejeune, NC6170022580
Jacksonville, Onslow County, North Carolina
Dear Mr. Kane:
The NC Superfund Section is in the process of completing a Pilot Study Work
Plan to treat the "hot spot" of the TCE Plume at Site 86 of the Camp Lejeune, MCB.
This effort is being completed in hopes that we can reduce the source "hot spot" of
the TCE plume at the site to the 2L Standard or at a minimum significantly reduce
the time required for the TCE plume to reach the standard. Please review the
attached Pilot Study Work plan for the proposed injections. If you need additional
groundwater data of hydrogeology please drop by our office and get copies of any
of the remedial investigation work. You may also contact Rich Bonelli with Baker
Environmental and he may be able to provide electronic data or RI information. I
will email this information to you and copy Rich Bonelli.
We are scheduled to start this injection work in late December or January.
Sincerely,
YYL`tc�. r db
Randy McElveen
Environmental Engineer
NC Superfund Section
Cc: Dave Lown, NC Superfund Section
SI: Wd C-13000
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone: 919-733-4996 \ FAX: 919-715-3605 \ Internet: www.enr.state.nc.us
AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER
PAPER
CH2MHILL
July 25, 2003
174057.TS.WP.86
Kirk Stevens
LANTNAVFACENGCOM
Code:EV23
1510 Gilbert St., Bldg. No. N26
Norfolk, VA 23511-2699
SEP 2 4 2J3
Subject: CTO 253 - Site 86 Draft Treatability Study Work Plan
Dear Kirk:
CH2M HILL
4824 Parkway Plaza Boulevard
Suite 200
Charlotte, NC 28217-1968
Tel 704.329.0072
Fax 704.329.0141
CH2MHILL is pleased to submit the draft version of the Treatability Study Work Plan for
Site 86, Operable Unit No. 20. Copies have been sent to the following: MCB Camp Lejeune,
US Environmental Protection Agency, NC Department of Environment and Natural
Resources, Naval Environmental Health Center Shaw Group, and Baker Environmental. In
order to maintain the overall project schedule, we would like to receive comments to the
document by September 12, 2003. This due date allows 45 days for review.
If you have any questions or comments, feel free to contact me at (704) 329-0073 x291.
Sincerely,
CH2M HILL
Christopher F. Bozzini, P.E.
Activity Manager
CLT\draft work plan cover letter.doc
c: Rick Raines, MCB Camp Lejeune
Randy McElveen, NCDENR
Charlie Stehman, NCDENR, Wilmington
Gena Townsend, EPA Region 4 (2 copies)
David McConaughy, NEHC
Ron Kenyon, Shaw Group
Rich Bonelli, Baker Environmental