Loading...
HomeMy WebLinkAboutSW6210204_Plan (Cover)_20210422INDEX OF DRAWINGS C0.0 C1.0 COVER SHEET EXISTING CONDITIONS & DEMOLITION PLAN C3.0 PROJECT TEAM OWNER CONTACT: MR. WILLIAM BURRIOLA NORTH CAROLINA NATIONAL GUARD OWNER PHONE: (984) 664-6354 1636 GOLD STAR DRIVE, SUITE 2600 RALEIGH, NC 27607 CIVIL ENGINEER TIMMONS GROUP RALEIGH, NC 27607 5410 TRINITY ROAD, SUITE 102 CONTACT: MR. FRANK SLINSKY PHONE: (919) 866-4505 NORTH CAROLINA NATIONAL GUARD RAEFORD POV & MOV EXPANSION NCNG RAEFORD READINESS CENTER - 305 TEAL DRIVE, RAEFORD, NORTH CAROLINA 28376 NCNG PROJECT #: 3720140172 / SCO CASE #: 18-19694-01A C2.0 STAKING PLAN GRADING & DRAINAGE PLAN W PROSPECT AVE US 4 0 1NAD 83RAEFORD SITE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICEN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R 0 3 3 6 1 2N O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R S E A LN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RF R A N C I S S L I N S K Y, I I I2020-DEC-01 NCNG RAEFORD POV & MOV EXPANSION305 TEAL DRIVE RAEFORD, NORTH CAROLINA, 28376, NCNG# 3720140172 / SCO# 18-19694-01A43358 J. LEWIS F. SLINSKY F. SLINSKY PRELIMINARY PLANS FOR REVIEW ONLY DO NOT USE FOR CONSTRUCTION C0.0 COVER SHEETWOODBERRY DRW PALMER STMAIN STHARRIS AVE AR S H O R T L I N E R A I L R O A D FAYETTEVILLE RDSTORMWATER SUBMITTAL 1" = 1000' 0 SCALE 1"=1,000' 2,000'1,000' VICINITY MAP 1"=1000' C4.0 EROSION CONTROL PLAN C5.0 SITE DETAILS C5.1 C5.2 C5.3 C5.4 C5.5 C5.6 SITE CIVIL SITE ELECTRICAL E1.0 STANDARDS, SYMBOLS, & ABBREVIATIONS E2.0 SITE PLAN - ELECTRICAL E3.0 ELECTRICAL DISTRIBUTION SYSTEM SITE DETAILS SITE DETAILS SITE DETAILS SITE DETAILS SITE DETAILS SITE DETAILS TEAL DRC5.7 SITE DETAILS C5.8 SITE DETAILS C5.9 SITE DETAILS L1.0 LANDSCAPING PLAN C2.1 SIGNAGE & STRIPING PLAN SHEETS INCLUDED IN STORMWATER SUBMITTAL C3.1 PRE-DEVELOPMENT STORMWATER MANAGEMENT PLAN C3.2 POST DEVELOPMENT STORMWATER MANAGEMENT PLAN